Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.
What closes soonest 3 open windows
Appeal window closes 18 Sept 20265 days left
SD26A/0155W — Grant Permission — The removal of Condition No.2 of the granted planning permission Reg.Ref. SD24A/0043 relating to a 3 year temporary plan
4 weeks from the council's decision (21 Aug 2026) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer) · 933 m away
Observations close 22 Sept 20269 days left
SD26A/0199W — application received — St. Finian's GAA Club Newcastle intend to apply for Permission for development will consist of:
The extension of the ex
5 weeks from receipt (18 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 524 m away
Observations close 24 Sept 202611 days left
ED26/0086 — application received — Proposed development consists of:
a) The extension of the existing gravel car park from 1895m2 to 2973m2
b)The creati
5 weeks from receipt (20 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 682 m away
An OPW flood extent intersects this area. The OPW's map is licensed CC-BY-NC-ND, so we show a flag only — see the extent at floodinfo.ie.
Designation
Count
Examples
EPA-licensed facility
6
Enva Ireland Limited; Sita Environmental Ltd.; W0185
NIAH-recorded building
10
Westmanstown House; water pump; Saint Finian's Catholic Church
Radon risk area
4
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels
St. Finian's GAA Club Newcastle intend to apply for Permission for development will consist of:
The extension of the existing gravel car park from 1895m2 to 2973m2 and the creation of an accessible compacted gravel pedestrian pathway around the new all-weather pitch. The introduction of 1.1m low level solar bollard lighting around the perimeter of the pedestrian pathways and the creation of 2no. covered seating/picnic areas with picnic benches and demountable umbrellas/canopies with the creation of an enclosed children's play area, and all associated site works.
Proposed development consists of:
a) The extension of the existing gravel car park from 1895m2 to 2973m2
b)The creation of an accessible compacted gravel pedestrian pathway around the new all-weather pitch
c)The introduction of 1.1m low level solar bollard lighting around the perimeter of the pedestrian pathways
d)The creation of 2 no. covered seating/picnic areas with picnic benches and demountable umbrellas/canopies.
e)The creation of an enclosed children's play area, and all associated site works.
Attic conversion for habitable use incorporating one rooflight to the front roof slope and three roof windows to the side roof slopes (one to one side and two to the opposite side); Construction of a single-storey flat roof side extension and construction of a detached flat roof
garden room to the side of the dwelling.
Attic conversion for habitable use incorporating three rooflights to the front roof slope and three windows to the side gable; Construction of a single storey rear extension and a detached single-storey flat-roof garden room to the rear of the property for use as a home office.
Retention permission for an existing dock loading bay located on the western elevation of the existing warehouse building, including associated ramp, handrails and all ancillary works, as constructed.
SD26A/0095Wreceived 8 Jul 2026decided 4 Aug 2026440 m away
The removal of Condition No.2 of the granted planning permission Reg.Ref. SD24A/0043 relating to a 3 year temporary planning time limit, for a development comprising of an open hard surfaced yard used for the parking of vehicles and trailers and external storage of non-hazardous goods and ancillary WC Facility. Apart from the request for the removal of condition 2, the development remains unaltered by this application.
SD26A/0155Wreceived 30 Jun 2026decided 21 Aug 2026933 m away
The installation of new corporate signage, one externally mounted sign measuring approximately 5.72m x 1.20m fixed to the principal (south) elevation of the existing building, and one freestanding single-sided directional pylon sign located adjacent to the site entrance together with all associated site works.
SD26A/0135Wreceived 10 Jun 2026decided 4 Aug 2026440 m away
Planning permission for a new single storey extension, comprising toilet, sitting room, gym and storage, to side and rear of the existing house with all associated ancillary works
SD25B/0703Wreceived 23 Apr 2026decided 20 May 2026389 m away
Large-scale Residential Development at this site within the townland of Newcastle South, Newcastle, Co. Dublin on an overall site of c.4.08 hectares. The 'Phase 4' development will consist of the construction of 113 no. dwellings and the remainder of the 'Burgage South' public open space as follows: A. 53 no. 2-storey houses (4 no. 2-storey, 2-bedroom houses, 43 no. 2-storey, 3-bedroom houses and 6 no. 2-storey, 4-bedroom houses); B. 60 no. apartment and duplex units in 4 no. 3-storey buildings comprising 30 no. 2-bedroom apartment units and 30 no. 3-bedroom duplex units; C. Provision of Public Open Space (c.1 ha. in a series of open space areas, including the remainder of the 'Burgage South' Park), hard and soft landscaping (including public lighting & boundary treatment), c.528sq.m of Communal Open Space for duplex and apartment units; along with single-storey bicycle/bin storage areas; D. Vehicular access from the east will be via permitted road (approved under SDCC Reg. Ref.: LRD23A/0011 & ACP-319500-24) from the north via existing road adjacent to Burgage Gardens and St. Finian's National School and Main Street and to the south via an extension to Boulevard Road (approved under SDCC Reg. Ref.: SD23A/0136) as well as 149 no. car parking spaces, 180 no. bicycle parking spaces, 8 no. motorcycle parking spaces and all internal roads, cycleways and footpaths; E. Provision of surface water attenuation, SuDS measures, connection to water supply, provision of foul drainage infrastructure, 2 no. ESB sub-stations and all ancillary site development, construction and landscaping works; F. The proposal also includes revisions to the permitted development approved under SDCC Reg. Ref.: SD17A/0378 and ACP-301421-18 relating to alterations to the open space to integrate with the wider proposed Burgage South public open space area. A dedicated website has been set up for the LRD application which can be viewed at: www.newcastlephase4lrd.com
LRD25A/0014Wreceived 20 Apr 2026decided 18 May 2026113 units754 m away
Amending the existing main hip to a gable with small hip and attic level (frosted) window in the gable wall, along with the provision of rooflights in the main roof to the front and rear of the house.
SD26B/0176Wreceived 16 Apr 2026decided 10 Jun 20261.0 km away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 46 records from Esb substation, Wastewater, Water withheld: source licence forbids redistribution; see the operator's own register.
No site on the LDA register of relevant public lands within 1.0 km.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
all-rights-reserved (water.ie terms cl. 2.1, personal/non-commercial); NOT covered by UÉ's CC-BY-4.0 open-data grant · not redistributable — shown as a flag only
all-rights-reserved (water.ie terms cl. 2.1, personal/non-commercial); NOT covered by UÉ's CC-BY-4.0 open-data grant · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 01:58 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.