PlanningRegister.ie
Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 20:00

Chestnut Road

53.29864, -6.20942

Homes here mostly date from 1919–1945. Home extensions nearby almost always get approved (94%). 68 homes approved 392 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1919–1945 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares3
Protected buildings6Saint Thomas' Church; Stansted
Monuments1R178430
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Records of Protected Structures, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 81–100% by type. A new house in a garden is harder: 64% approved, and 1 in 6 is asked for more information.

Single-storey rear107 decided · more info asked 14%
98% · council 96%
Two-storey rear66 decided · more info asked 12%
95% · council 92%
Two-storey side19 decided · more info asked 11%
95% · council 95%
Single-storey side23 decided · more info asked 9%
91% · council 96%
Attic or dormer247 decided · more info asked 9%
94% · council 94%
First-floor21 decided · more info asked 10%
81% · council 90%
Garage conversion35 decided · more info asked 0%
100% · council 99%
Porch or front19 decided · more info asked 5%
100% · council 98%
New house in a garden or site39 decided · more info asked 18%
64% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 576 nearby, 3,892 council-wide

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 approved
KindAppliedApprovedRefused
Other11—
Two-storey side11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 52 days. 1 in 9 is asked for more information, which adds about 51 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 9): 105 days; Appeal window: 4 weeks; If appealed: +126 days; Building starts: 145 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 50–54 (n=562)52 daysIf more info asked (1 in 9)With further information: median 105 days (n=70)105 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 126 days (n=100, all appeals within 1.5 km)+126 daysBuilding startsStart notice: median 145 days after permission (n=323)145 days after permissionSigned off404 days after the start, for the few who file. 71% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated632 decided home extensions, 326 start notices, 100 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    14 of 33 appealed refusals became permissions. 3 of 68 appealed approvals were reversed.

    Refusals appealed33 decided
    14 became permissions
    Approvals appealed68 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 7 in the last 12 months

    1 of 4 changed the council's decision

    • 502174 Pending · 32, Deerpark Road, Mount Merrion, Dublin, A94X7K4 · 441 m
    • 502148 Pending · 57, Deerpark Road, Mount Merrion, Dublin, A94F761 · 368 m
    • 502081 Pending · 26, Wilson Road, Mount Merrion, Blackrock, Co Dublin, A94R8X3 · 364 m
    • 500642 Granted with conditions · 14, Saint Thomas Road, Mount Merrion, Blackrock, Co. Dublin, A94 AE89 · 217 m report
    • 501139 Granted · 3, The Foster's, Mount Merrion, Dublin, A94TK64 · 357 m report
    • 500656 Refused · 26, Wilson Road, Mount Merrion, Co. Dublin, A94R8X3 · 364 m report
    • 500281 Refused · 6, Wilson Crescent, Mount Merrion, Blackrock, Dublin, A94E4X0 · 472 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Chestnut Road with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingDerelict buildingApproved, not startedRefusedBuilding startedApprovedNo decision yet
    1. 143 Hampton Park, Saint Helen's Wood D26B/0554/WEBNo decision yet · 449 m
    2. 229 Sycamore Road, Mount Merrion D26A/0767/WEBNo decision yet · 460 m
    3. 311 Trees Avenue, Mount Merrion D26B/0522/WEBNo decision yet · 476 m
    4. 434 Wilson Road, Mount Merrion D26B/0476/WEBApproved · 325 m
    5. 5Applegreen, Stillorgan Road D26A/0618/WEBApproved · 351 m
    6. 6DERELICT, 65 DEERPARK ROAD DS 1646Derelict building · 360 m
    7. 7Fosters Avenue D24A/0783/WEBApproved, no sign building has started · 392 m
    8. 838A Greenfield Road (to west side of 38 Balnagowan, Greenfield Road) D25A/0842/WEBRefused · 132 m
    9. 912 The Close, Blackrock D26B/0172/WEBBuilding started · 108 m
    10. 109 Roebuck Avenue, Blackrock CN0149255DRBuilding started · 153 m
    11. 1112, The Close D26B/0172/WEBApproved · 83 m
    12. 129, Roebuck Avenue C3A/0005/26No decision yet · 141 m
    13. 1318, Greenfield Road D26B/0196/WEBApproved · 150 m
    14. 1414, Saint Thomas Road D25B/0626/WEBApproved · 217 m
    15. 153, Greygates D26B/0083/WEBApproved · 260 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 130 permissions since 2016, 74 show a start notice and 7 have a completion certificate. Most owners opt out of sign-off.

    187 applications lodged within 500 m. Council: 129 approved, 24 refused. After appeals: 130 approved. Of those: 7 signed off, 54 built with the owner's opt-out, 13 started, 55 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT129: lodged → approved24: lodged → refused25: lodged → withdrawn or invalid9: lodged → undecided128: approved → approved20: refused → refused25: withdrawn or invalid → withdrawn9: undecided → undecided1 approved by the council, refused after an appeal2 refused by the council, approved after an appeal2 refused by the council, withdrawn or invalid after an appeal55: approved → no start notice found54: approved → built, owner opted out13: approved → started, not signed off7: approved → signed off1: approved → ran out187 lodged187 lodged129 approved129 approved24 refused24 refused25 withdrawn or invalid25 withdrawn or invalid9 undecided9 undecided130 approved130 approved21 refused21 refused27 withdrawn27 withdrawn9 undecided9 undecided55 no start notice found55 no start notice found54 built, owner opted out54 built, owner opted out13 started, not signed off13 started, not signed off7 signed off7 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured187 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    5 deadlines within 500 m; the first closes 4 Nov 2026.

    5 deadlines in the next 30 days: 2026-11-04 D26B/0522/WEB: application received — Permission sought for: 1) Demolition of the existing two storey extension over g; 2026-11-06 D26A/0618/WEB: GRANT PERMISSION FOR RETENTION — The development consists of a canopy erected over service bays along with all a; 2026-11-16 D26A/0767/WEB: application received — planning permission for a domestic extension and works to existing two-storey se; 2026-11-17 D26B/0476/WEB: GRANT PERMISSION — Single-storey flat roof extension to the side and rear, including the conversion; 2026-11-26 D26B/0554/WEB: application received — a) demolition of the existing single-storey, 5.5sqm rear return (northeast); b) construction of a new flat roofed 28.1sqtoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecD26B/0522/WEB: application received — Permission sought for: 1) Demolition of the existing two storey extension over g · 476 m away · 2026-11-04D26A/0618/WEB: GRANT PERMISSION FOR RETENTION — The development consists of a canopy erected over service bays along with all a · 351 m away · 2026-11-06D26A/0767/WEB: application received — planning permission for a domestic extension and works to existing two-storey se · 460 m away · 2026-11-16D26B/0476/WEB: GRANT PERMISSION — Single-storey flat roof extension to the side and rear, including the conversion · 325 m away · 2026-11-17D26B/0554/WEB: application received — a) demolition of the existing single-storey, 5.5sqm rear return (northeast); b) construction of a new flat roofed 28.1sq · 449 m away · 2026-11-26
    Comments closeTime to appeal ends
    • Comments close 4 Nov 20263 days left
      3D26B/0522/WEB · application received — Permission sought for: 1) Demolition of the existing two storey extension over g
      €20 to the council · 476 m away
    • Time to appeal ends 6 Nov 20265 days left
      5D26A/0618/WEB · GRANT PERMISSION FOR RETENTION — The development consists of a canopy erected over service bays along with all a
      €220 to An Coimisiún Pleanála (€110 observer) · 351 m away
    • Comments close 16 Nov 202615 days left
      2D26A/0767/WEB · application received — planning permission for a domestic extension and works to existing two-storey se
      €20 to the council · 460 m away
    • Time to appeal ends 17 Nov 202616 days left
      4D26B/0476/WEB · GRANT PERMISSION — Single-storey flat roof extension to the side and rear, including the conversion
      €220 to An Coimisiún Pleanála (€110 observer) · 325 m away
    • Comments close 26 Nov 202625 days left
      1D26B/0554/WEB · application received — a) demolition of the existing single-storey, 5.5sqm rear return (northeast); b) construction of…
      €20 to the council · 449 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    68 homes 392 m away were approved Mar 2025 with no start notice yet; the permission runs to Mar 2030. BusConnects Core Bus Corridors is planned 282 m away.

    Fosters Avenue · 68 homes: 68 homes approved Mar 2025, not started; BusConnects Core Bus…: core bus corridor (DLR County Development Plan 2022-2028)20242025202620272028202920302031Fosters Avenue · 68 homes392 m · D24A/0783/WEB68 homes approved Mar 2025, not started68 homes approved Mar 2025, not startedBusConnects Core Bus…282 m · plannedcore bus corridor (DLR County Development Plan 2022-2028)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 2 within 500 m

    Derelict building 1

    • 6DERELICT, 65 DEERPARK ROAD · listed as derelict · 360 m

    Approved, not started 1

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 23 and 45 a year; busiest 2025. 84% of decisions were approvals.

    2021: 25, 2022: 31, 2023: 23, 2024: 30, 2025: 45, 2026: 33010203040502021: 21 approved2021: 3 refused2021: 1 withdrawn or invalid25’21*2022: 23 approved2022: 3 refused2022: 4 withdrawn or invalid2022: 1 undecided31’222023: 18 approved2023: 4 refused2023: 1 withdrawn or invalid23’232024: 20 approved2024: 3 refused2024: 7 withdrawn or invalid30’242025: 29 approved2025: 10 refused2025: 6 withdrawn or invalid45’252026: 18 approved2026: 1 refused2026: 6 withdrawn or invalid2026: 8 undecided33’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 42 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 18 in the last 12 months
    2 not signed off16 no sign-off needed
    • Mount merrion, Dublin, A94 TK64 · 3 Nov 2026 · start notice, opted out no sign-off needed · D26A/0035/WEB · 373 m
    • 109 Roebuck Avenue, Blackrock, Dublin · 30 Oct 2026 · 1 homes · short notice no sign-off needed · 153 m
    • 93 South Avenue, Blackrock, Dublin, A94 F9X6 · 29 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · D26A/0332 · 496 m
    • 39 Wilson Road, Blackrock, Dublin, A94 P3Y9 · 21 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0046/WEB · 339 m
    • 11 Mather Road North, Blackrock, Dublin, A94 CF62 · 7 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · D26B/0293/WEB · 358 m
    • 912 The Close, Blackrock, Dublin, A94 DH57 · 14 Aug 2026 · 1 homes · short notice no sign-off needed · D26B/0172/WEB · 108 m
    • 40 Wilson Road, Blackrock, Dublin, A94 H2Y9 · 4 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0472 · 319 m
    • 66 The Rise, Blackrock, Dublin, A94 X9F6 · 27 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0292 · 268 m
    • Sycamore Crescent, Dublin, A94Y8D2 · 22 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0727/WEB · 395 m
    • 75 Deerpark Road, Dublin, Dún Laoghaire-Rathdown · 28 May 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0699/WEB · 342 m
    • 11 Cypress Road, Blackrock, Dún Laoghaire-Rathdown, A94 F5C7 · 18 May 2026 · start notice, opted out no sign-off needed · D25B/0259/WEB · 310 m
    • 44A Foster Avenue, Blackrock, Dún Laoghaire-Rathdown, A94 W963 · 13 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0737/WEB · 402 m
    • 9 Roebuck Avenue, Blackrock, Dún Laoghaire-Rathdown, A94 K3V6 · 6 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · D24A/0855/WEB & ABP-321631 · 153 m
    • 15 The Rise, Blackrock, Dún Laoghaire-Rathdown, A94 CF74 · 3 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · D24A/0706/WEB · 207 m
    • 34 Mather Road North, Mount Merrion, Blackrock, Dublin, A94 Y319, Blackrock, Dún Laoghaire-Rathdown, A94 Y319 · 30 Mar 2026 · 1 homes · short notice no sign-off needed · D25A/0546/WEB · 482 m
    • 47 Deerpark Road, Blackrock, Dún Laoghaire-Rathdown, A94 A9X5 · 22 Jan 2026 · start notice, opted out no sign-off needed · D25A/0467/WEB · 418 m
    • The Rise, Mount Merrion, Dún Laoghaire-Rathdown, A94 E283 · 17 Nov 2025 · start notice not signed off · D23A/0600 · 421 m
    • 73 Deerpark Road, Blackrock, Dún Laoghaire-Rathdown, A94 C4E7 · 7 Nov 2025 · 7-day notice not signed off · D25A/0292 · 325 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 68 not started
    • 7Fosters Avenue · 68 homes · not started · runs out 18 Mar 2030 · 392 m
    • Mt Anville Crescent, Mount Anville Road, Mount Merrion, Co Dublin. · Stage 2 pre planning · 38 homes · 208 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Unit 14848 built (2025-Q4)250 m
    Fosters Avenue6969 being built (2026-Q2)340 m
    Part Ground Floor of Permitted Block A——443 m
    DLR D17A/02406464 built (2025-Q1)722 m
    45 Woodlands Park3838 not started (2025-Q2)735 m
    Grove Lodge2626 built (2025-Q4)735 m
    Merrion at——762 m
    Merrion——762 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Fontanelles Montessori · Crèche11 Jun 2026 · report · Tusla Early Years Inspectorate297 m
    The Park Academy Childcare Thornwood · Crèche8 Sept 2025 · report · Tusla Early Years Inspectorate356 m
    Coco's Childcare · Crèche26 Feb 2026 · report · Tusla Early Years Inspectorate793 m
    Oatlands Pre,After, Montessori, School Age Childcare · Crèche11 Sept 2025 · report · Tusla Early Years Inspectorate885 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here399
    Council middle44
    Homes started
    Here343
    Council middle92
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    94% of homes built before 1971 (council 38%). 93% owner-occupied (council 68%).

    Homes built before 1971
    94% · council 38%
    Homes built since 2001
    5% · council 25%
    Owner-occupied
    93% · council 68%
    Rented
    7% · council 29%
    Children under 15
    19% · council 18%
    Aged 65 and over
    22% · council 17%
    Households with 2+ cars
    57% · council 39%
    Work mainly from home
    18% · council 19%
    This small area (310 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267128007

    Bus
    137 m
    Greenfield Road · 47 · busiest stop within 500 m: 27 an hour at peak
    Planned
    282 m
    BusConnects Core Bus Corridors, City to Bray
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    422 m
    S N San Treasa, 430 pupils
    Homes sold nearby
    42
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • S N San Treasa · primary · 430 pupils · 422 m
    • Coláiste Eoin · postprimary · 517 pupils · 535 m
    • Coláiste Íosagáin · postprimary · 488 pupils · 550 m
    • Gaelscoil Laighean · primary · 130 pupils · 809 m
    • Oatlands College · postprimary · 623 pupils · 826 m
    • Oatlands Primary School, An Edmund Rice School · primary · 428 pupils · 876 m
    • St Andrews College · postprimary · 1011 pupils · 934 m
    • Our Lady Of Mercy Convent School · primary · 247 pupils · 958 m

    Stops 44

    • Greenfield Road · 47 · 137 m
    • Greenfield Road · 47 · 150 m
    • Mather Road North · 47 · 239 m
    • Mather Road North · 47 · 260 m
    • Booterstown Avenue · 116, 118, 47, 7B, 7D, E1 · 27/hour at peak · 282 m
    • Deer Park · 47 · 293 m
    • Booterstown Avenue · 116, 181, 46n, 47, 7B, 7D · 19/hour at peak · 318 m
    • Greenfield Road · 116, 118, 181, 47, 7B, 7D · 27/hour at peak · 323 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • S N San Treasa · 422 m+1.2% pupils (430)
    • Coláiste Eoin · 535 m+1.4% pupils (517)
    • Coláiste Íosagáin · 550 m0% pupils (488)
    • Gaelscoil Laighean · 808 m+23.8% pupils (130)
    • Oatlands College · 826 m-1.7% pupils (623)
    • Oatlands Primary School, An Edmund Rice School · 876 m+1.9% pupils (428)

    Council meetings 2 items

    Public land

    • Dublin City Council · 0.34 ha · 283 m
    • Dún Laoghaire-Rathdown County Council · 10 ha · 313 m
    • Dublin City Council · 0.19 ha · 382 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 449 m away open for comments until 26 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Mount Merrion or Callary
    Electoral division
    Stillorgan-Mount Merrion
    Electoral area
    Stillorgan
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 2 sites nearby could change: 1 derelict, 1 approved scheme.
    • 3 applications open for comments nearby; nearest closes 26 Nov 2026.
    • 68 homes approved nearby, not started; largest 68 at Fosters Avenue.
    • St Thomas Road (bus 116, 118) 490 m away: 28 an hour at morning peak; 122 from all stops within 500 m. Planned: BusConnects Core Bus Corridors 282 m away, core bus corridor (DLR County Development Plan 2022-2028).
    • Here (2022 census): 92% owner-occupied (council 68%); 5% of homes empty (council 6%); most built 1919–1945; 50% drive to work (council 43%); population up 3% since 2016.
    • 2 home extensions within 250 m since 2025.
    • Around here the council decides in a median 53 days (about 8 weeks); 1 in 14 is asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 20:00 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.