Dundrum Road
Homes here mostly date from 1919–1945. Home extensions nearby almost always get approved (93%). 934 homes approved 275 m away haven't started.
How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 52 days
- 4Appeal window4 weeks after the decision
- 5AppealHere about 4 months
- 6PermissionLasts 5 years
- 7StartStart notice to the council. Here about 5 months after
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built 1919–45, before planning permission was needed.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
Zoning, protection, tax and flood: the detail
What it says
Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028
What it says
Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028
Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
| Within 500 m | Count | For example |
|---|---|---|
| Heritage inventory buildings | 3 | Central Mental Hospital |
| Radon grid squares | 1 | |
| Protected buildings | 3 | Catholic Chapel; Asylum for Lunatics |
How we work this out
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), National Inventory of Architectural Heritage, Records of Protected Structures · fetched 25 Oct 2026, 23:43
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Development plan zoning (councils) | CC BY 4.0 | 25 Oct 2026, 23:06 | open |
| EPA radon map | CC BY 4.0 | 27 Sept 2026, 19:36 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 25 Oct 2026, 23:43 | open |
| Constraint layers (bundle) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026, 19:37 | open |
| OPW flood maps (CFRAM) | CC BY-NC-ND 4.0 · shown as a yes/no only | 11 Sept 2026, 19:11 | open |
| National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026, 19:35 | open |
| Records of Protected Structures | CC BY 4.0 | 27 Sept 2026, 19:36 | open |
How we work this out
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
Extensions are almost always approved here: 85–100% by type. A new house in a garden is harder: 58% approved, and 1 in 3 is asked for more information.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 634 nearby, 3,892 council-wide
Dundrum Road, file by file since 2021
3 of 4 decided extensions on the road were approved. New houses in side gardens or on sites: 0 of 1.
36 files with "Dundrum Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.
MeasuredOur classificationcouncil register via NPAD · 2021–2026
Extensions and refusals right beside you 4 within 250 m · 0 refused within 100 m
Extensions and refusals near you 4 extensions within 250 m · the last 12 months
| Kind | Applied | Approved | Refused |
|---|---|---|---|
| Single-storey rear | 2 | 2 | — |
| Garage conversion | 1 | 0 | — |
| Two-storey rear | 1 | 1 | — |
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
How long, and what if someone objects?
A home extension's journey here
A decision takes 52 days. 1 in 6 is asked for more information, which adds about 65 days. Building starts about 5 months after permission.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated681 decided home extensions, 353 start notices, 110 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
What appeals changed
11 of 34 appealed refusals became permissions. 7 of 81 appealed approvals were reversed.
Every appeal decided within 1.5 km in 10 years, any kind of development.
CalculatedAn Coimisiún Pleanála cases linked to the council file
Appeals nearby 5 in the last 12 months
None of 2 changed the council's decision
- 502202 Pending · Site of approximately 0.019 Ha at No. 4 Rere of Arbourfield Terrace,… · 399 m
- 501993 Invalid · Rosemount Hall, Rosemount Estate, Dundrum, Dublin 14, D14FP59 · 330 m
- 501620 Open · 81, Churchtown Road Lower, Rathmines Little, Dublin 14, D14CC84 · 339 m
- 324032 Granted with conditions · Lands at 97A Highfield Park (D14P710), 1 Frankfort Castle & 2… · 126 m report
- 500411 Refused · 24, Annaville Park, Dundrum, Dublin 14, D14Y973 · 214 m report
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Courts Service legal diary (judicial reviews) | © the publisher | 31 Oct 2026, 23:12 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
What's changing around you?
- 155, Woodlawn Park D26B/0543
- 26, Larchfield D26B/0455/WEB
- 3Frankfort Castle ABP-311287
- 4former Central Mental Hospital PC/2/2024
- 5DERELICT, 22 WOODLAWN PARK DS: 1685
- 6Lands at 97A Highfield Park (D14P710), 1 Frankfort Castle & 2 Frankfort Castle Dublin 14 324032
- 726 Westbrook Road, Dundrum D25B/0401/WEB
- 82 Westbrook Road, Dublin 14 D26B/0155/WEB
- 942, Westbrook Road D25B/0697/WEB
- 1068, Westbrook Road D25B/0699/WEB
- 11Frankfort Centre, Dundrum Road D26A/0588/WEB
- 12Sommerville House, Dundrum Road LRD26A/0536/WEB
- 1324, Annaville Park D26A/0071/WEB
- 14Highfield Mews, Highfield Park D26A/0568/WEB
- 157 Woodlawn Crescent, Windy Arbour D26B/0423/WEB
What happens to applications within 500 m
Permission isn't building. Of 102 permissions since 2016, 38 show a start notice and 1 has a completion certificate. Most owners opt out of sign-off.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured146 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
The next 30 days
2 deadlines within 500 m; the first closes 4 Nov 2026.
- Time to appeal ends 4 Nov 20263 days left2D26B/0455/WEB · GRANT PERMISSION — The development will consist of a part single-storey, part two-storey extension€220 to An Coimisiún Pleanála (€110 observer) · 289 m away
- Comments close 17 Nov 202616 days left1D26B/0543 · application received — Demolition of conservatory to rear (9.4 sq metres), demolition of garagem wcm ut€20 to the council · 325 m away
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Approved, stalled or planned, not built yet
934 homes 275 m away were approved Dec 2025 with no start notice yet; the permission runs to Dec 2030.
Each row is a dated fact from a public register: no score and no forecast.
Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)
Sites that could change 3 within 500 m
Derelict building 1
- 5DERELICT, 22 WOODLAWN PARK · listed as derelict · 385 m
Approved, not started, approval running out 1
- 3Frankfort Castle · 115 homes approved, not started; runs out Dec 2026 · 175 m
Approved, not started 1
- former Central Mental Hospital · 934 homes approved Dec 2025, not started · 275 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| Derelict sites registers | CC BY 4.0 | 26 Oct 2026, 23:09 | open |
| Council meetings (ModernGov) | Public | 1 Nov 2026, 02:24 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 25 Oct 2026, 23:43 | open |
Applications within 500 m, by year
Between 19 and 26 a year; busiest 2022. 85% of decisions were approvals.
2021 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Open for comments €20 to comment
- 155, Woodlawn Park, Churchtown, Dublin 14, D14F789 comments close 17 Nov 2026Demolition of conservatory to rear (9.4 sq metres), demolition of garagem wcm ut
Every application within 500 m 30 in the last 12 months
See every application on the map
- 55, Woodlawn Park, Churchtown, Dublin 14, D14F789 Withdrawn or not validDemolition of conservatory to rear (9.4 sq metres), demolition of garage, wc, ut
- 40 Woodlawn Park, Churchtown, Dublin 14, D14 KN23 No decision yetPlanning permission is sought for: 1) Demolition of existing single-storey exten
- Eternity House, Rosemount Park, Dublin 14, D14 Y2R3 No decision yetThe development consists of which consists of internal alterations to ground flo
- Lower Ground Floor, Apollo Building, Dundrum Road, Dundrum, Dublin 14, D14 K2F8 No decision yetRetention permission is for Illuminated signage over the front door of the unit
- 26, Larchfield, Dundrum, Dublin 14, D14PR90 ApprovedThe development will consist of a part single-storey, part two-storey extension
- 11Frankfort Centre, Dundrum Road, Dundrum, Dublin 14 ApprovedThe development will consist of: (i) the amalgamation of 3 no. ground floor uni
- 14Highfield Mews, Highfield Park, Dundrum, Dublin, D14N599 Refused1 – Retention permission is sought for the retention of an existing residential
- 157 Woodlawn Crescent, Windy Arbour, Dublin 14, D14X318 ApprovedPermission for: Demolition of chimneys, 4no. dormers and garage. Construction of
- 12Sommerville House, Dundrum Road, Dundrum, Dublin 14 No decision yetDemolition of all structures on the site and site clearance works. The construct
- Site of approximately 0.019 Ha at No. 4 Rere of Arbourfield Terrace, Dundrum Road, Dublin 14, D14FP63 ApprovedThe proposed development will principally consist of: the demolition of the exi
- Site of approximately 0.019 Ha at No. 4 Rere of Arbourfield Terrace, Dundrum Road, Dublin 14, D14 FP63 Withdrawn or not validThe proposed development will principally consist of: the demolition of the exi
- 7, Woodlawn Crescent, Windy Arbour, Dundrum, Dublin 14, D14X318 Withdrawn or not validPermission for: Demolition of chimneys, 4no. dormers and garage. Construction of
- Ardtona House School, Ardtona Avenue, Churchtown, Dublin, D14DR40 Section 5: needs permissionThere are no works proposed or material changes to the school. The proposed deve
- 60, Churchtown Road Lower, Churchtown, Dublin 14, D14VP02 ApprovedThe proposed development will consist of a) first floor extension with roofligh
- 127 Churchtown Road Lower, Churchtown, Dublin 14, D14V324 Approvedproposed removal of existing garage to side of house and the construction of ne
- 4a, Rosemount Estate, Dundrum, DUBLIN, D14KV24 Section 5: exemptAn Exempted Development application was granted for my house in 2002 and it was
- Rosemount Hall, Rosemount Estate, Dundrum, Dublin 14, D14FP59 ApprovedProposed Construction Of 3 No. Dwelling Houses Consisting Of 2 No. Three Bedroo
- 68, Saint Columbanus' Road, Windy Arbour, Dublin 14, D14RX53 Approved1: Partial internal and external alterations of existing two storey end of terra
- National Mobility Hubs Pilot: Dún Laoghaire-Rathdown, 73 Locations Across the Council's Administrative Area, Dún Laoghaire-Rathdown No decision yet73 mobility hub sites across the Council's administrative area
- 81, Churchtown Road Lower, Rathmines Little, Dublin 14, D14CC84 ApprovedConstruction of a three-storey, pitched roof, five-bedroom detached dwelling in
- 6, Frankfort Park, Churchtown Lower, Dublin, D14NP84 ApprovedThe development will consist of the addition of 3 no. single storey car ports t
- 2, Westbrook Road, Highfield Park, Dundrum, Dublin, D14RR50 ApprovedTo construct a single storey extension to the rear of existing dwelling includi
- 1324, Annaville Park, Dundrum, Dublin 14, D14Y973 ApprovedPermission is sought for an extension to the existing two-storey hipped-roof se
- 68, Saint Columbanus' Road, Dundrum, DUBLIN, D14RX53 Section 5: exempt1
- 68, Saint Columbanus' Road, Dundrum, Dublin 14, D14RX53 RefusedFull planning permission for; 1) Partial demolition of existing two storey end o
- 84, Churchtown Road Lower, Churchtown, Dublin 14, D14CK80 Approveda) Demolition of existing (single storey) garage to side/front and removal of ex
- 1068, Westbrook Road, Dundrum, Dublin 14, D14A3A2 Approved(1) The removal of the existing single storey extension to the rear of the house
- 942, Westbrook Road, Dundrum, Dublin 14, D14K403 No decision yetThe development consists of the retention of the following works:- the conversio
- 79, Larchfield Road, Roebuck, Dublin 14, D14HD79 ApprovedSingle-storey, flat-roof extension to the rear of the dwelling.
How we work this out
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
Building work nearby 18 in the last 12 months
- 8 Saint Columbanus' Road, Dublin 14, Dublin, D14 F663 · 1 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · D22A/0053 · 314 m
- 82 Westbrook Road, Dublin 14, Dublin, D14 RR50 · 16 Sept 2026 · 1 homes · short notice no sign-off needed · D26B/0155/WEB · 199 m
- Dundrum Road, Dublin · 14 Aug 2026 · 231 homes · 7-day notice not signed off · PC/H/02/2025 · 306 m
- Dundrum Road, Dublin · 14 Aug 2026 · 231 homes · 7-day notice not signed off · PC/H/02/2025 · 306 m
- Dundrum Road, Dublin · 13 Aug 2026 · 547 homes · 7-day notice not signed off · ABP-320912-24 · 306 m
- 3 Highfield Park, Dublin 14, Dublin, D14 V218 · 13 Aug 2026 · short notice no sign-off needed · D24A/0254 · 234 m
- Dundrum Road, Dublin · 13 Aug 2026 · 547 homes · 7-day notice not signed off · ABP-320912-24 · 306 m
- 41 Woodlawn Park, Dublin 14, Dublin, D14 EP94 · 12 Aug 2026 · 1 homes · short notice no sign-off needed · D22A/0895 · 272 m
- 3 Highfield Park, Dublin 14, Dublin, D14 V218 · 11 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · D24A/0254 · 234 m
- Dundrum Road, Dublin · 11 Aug 2026 · 547 homes · 7-day notice not signed off · ABP-320912-24 · 306 m
- 69 Larchfield Road, Dublin 14, Dublin, D14 PK30 · 21 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · D21B/0657 · 481 m
- 11 Flemingstown Park, Dublin 14, Dublin, D14 WK16 · 29 Jun 2026 · 1 homes · short notice no sign-off needed · D25B/0271/WEB · 439 m
- 726 Westbrook Road, Dundrum, Dublin, D14 K6V9 · 2 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0401/WEB · 135 m
- 24 Annaville Park, Dublin, D14 Y973 · 22 May 2026 · 1 homes · start notice, opted out no sign-off needed · D26A/0071/WEB · 222 m
- 94 Woodlawn Park, D14, Dún Laoghaire-Rathdown, D14 W086 · 12 May 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0573/WEB · 346 m
- 14 Flemingstown Park, Churchtown, Dún Laoghaire-Rathdown, D14 E104 · 12 Jan 2026 · 1 homes · short notice no sign-off needed · D23B/0059 · 402 m
- 57 Woodlawn Park, Dublin, Dún Laoghaire-Rathdown · 24 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · D24A/0877 · 351 m
- 36 Rosemount Estate, Knockatee, Dún Laoghaire-Rathdown · 14 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · D25A/0001/WEB · 420 m
How we work this out
Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
Homes coming 1,049 not started
- 4former Central Mental Hospital · 934 homes · not started · runs out 22 Dec 2030 · 275 m
- Frankfort Castle · 115 homes · runs out soon · runs out 20 Dec 2026 · 175 m
- Moyola Court, Churchtown Lower, Dublin 14 · Completed · 4 homes · 48 m
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
| Social housing construction status report | CC BY-SA 4.0 | 23 Oct 2026, 23:02 | open |
Named places nearby: estate, schemes, crèches, schools
Named places estate, developments, inspections
Developments within 1.0 km
| Scheme | Homes | Progress | Distance |
|---|---|---|---|
| Central Mental Hospital | 934 | 934 not started (2026-Q2) | 76 m |
| c.9.6 ha | — | — | 76 m |
| c.0.9ha at No. 97A Highfield Park | — | — | 126 m |
| 97A Highfield Park | — | — | 126 m |
| Frankfort Centre | 64 | no activity on site reported (2025-Q2) | 166 m |
| Sommerville House | — | — | 178 m |
| 0.79 ha at Sommerville House | — | — | 179 m |
| 2.12 ha at Our Lady's Grove | — | — | 615 m |
Crèches and schools inspected
| Name | Latest inspection | Distance |
|---|---|---|
| Ashgrove Creche and Montessori School · Crèche | 5 Nov 2025 · report · Tusla Early Years Inspectorate | 256 m |
| Ashgrove Creche & Montessori · Crèche | 7 Jul 2025 · report · Tusla Early Years Inspectorate | 446 m |
| Ardtona House School · Crèche | 8 May 2024 · report · Tusla Early Years Inspectorate | 560 m |
| Bright Beginnings Nursery and Creche · Crèche | 4 Feb 2026 · report · Tusla Early Years Inspectorate | 925 m |
How we work this out
Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Dublin housing delivery pipeline | CC BY 4.0 | 26 Oct 2026, 23:00 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
| Department of Education school list | CC BY 4.0 | 27 Oct 2026, 23:04 | open |
| Tusla early years register | Public register | 28 Oct 2026, 23:19 | open |
How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
What's the area like?
This street block against the council
59% of homes built before 1971 (council 38%). 61% owner-occupied (council 68%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267046004/267057001
Schools, stops and the council
Schools
- Our Ladys NS · primary · 176 pupils · 353 m
- Goatstown Stillorgan Primary School · primary · 170 pupils · 657 m
- Gaelscoil na Fuinseoige · primary · 441 pupils · 719 m
- Our Lady's Grove Secondary School · postprimary · 295 pupils · 824 m
- Our lady's Grove Primary School · primary · 409 pupils · 887 m
Stops 45
- Frankfort · 44, 44D · 1/hour at peak · 153 m
- Sommerville · 44, 44D · 1/hour at peak · 167 m
- Dundrum Hospital · 44, 44D · 1/hour at peak · 232 m
- Dundrum Hospital · 44, 44D · 1/hour at peak · 254 m
- Windy Arbour · Green · 19/hour at peak · 392 m
- Rosemount Estate · 44, 44D · 1/hour at peak · 394 m
- Windy Arbour · Green · 22/hour at peak · 401 m
- Rosemount Estate · 44, 44D · 1/hour at peak · 405 m
Schools growing or shrinking planning in 3 years · pupils last year
- Our Ladys NS · 353 m-8.3% pupils (176)
- Goatstown Stillorgan Primary School · 656 m+20.6% pupils (170)
- Gaelscoil na Fuinseoige · 719 m+3.5% pupils (441)
- Our Lady's Grove Secondary School · 824 m-5.4% pupils (295) · an extension 2026, refused
- Our lady's Grove Primary School · 887 m-1.9% pupils (409) · an extension 2026, refused
Council meetings 1 items
- 12 Oct 2026 · 4.01. Proposed disposal of Council owned land at Saint Columbanus Road, Churchtown Lower, Dublin 14…
Public land
- The Office of Public Works · 11.35 ha · 76 m
- Dublin City Council · 2.28 ha · 289 m
- Dún Laoghaire-Rathdown County Council · 0.18 ha · 384 m
- Dublin City Council · 0.5 ha · 422 m
- Dublin City Council · 0.83 ha · 439 m
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Public transport stops and routes (NTA GTFS) | CC BY 4.0 | 25 Oct 2026, 23:02 | open |
| Department of Education school list | CC BY 4.0 | 27 Oct 2026, 23:04 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
| Council consultation portals | Public | 1 Nov 2026, 01:08 | open |
| Council meetings (ModernGov) | Public | 1 Nov 2026, 02:24 | open |
| Land Development Agency public land register | CC BY 4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- Flood risk area within 100 m: can you insure it?InsurerAsk for: A flood-cover quote before sale agreed.
- 115 homes approved 175 m away (Frankfort Castle), not started: what is planned?CouncilAsk for: The planning file for ABP-311287.
- Application 325 m away open for comments until 17 Nov 2026: comment?CouncilAsk for: The plans on the council's website (€20 to comment).
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Townland
- Churchtown Lower
- Electoral division
- Churchtown-Woodlawn
- Electoral area
- Dundrum
- Council
- Dun Laoghaire-Rathdown County Council
Everything we found, as a list 8 lines
- Zoned R2 (existing residential); not protected; no vacant land tax; flood risk area within 100 m.
- 3 sites nearby could change: 1 derelict, 2 approved schemes.
- 1 application open for comments nearby; nearest closes 17 Nov 2026.
- 1,049 homes approved nearby, not started; largest 934 at former Central Mental Hospital.
- Windy Arbour (Luas Green) 401 m away: 22 an hour at morning peak; 50 from all stops within 500 m.
- Here (2022 census): 61% owner-occupied (council 68%); 2% of homes empty (council 6%); most built 1919–1945; 27% drive to work (council 43%); population up 3% since 2016.
- 4 home extensions within 250 m since 2025. Most were single-storey rear extensions.
- The council decides in a median 52 days (about 7 weeks); 1 in 8 is asked for more information.
What the terms mean 9 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
- Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
- Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
- Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 30
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC BY 4.0 | 30 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC BY 4.0 | 1 Nov 2026 |
| data.gov.ie | Various (see each layer) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026 |
| s3.eu-west-1.amazonaws.com | Office of Public Works | CC BY-NC-ND 4.0 · flag only | 11 Sept 2026 |
| services-eu1.arcgis.com | National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026 |
| gis.epa.ie | Environmental Protection Agency | CC BY 4.0 | 27 Sept 2026 |
| services.arcgis.com | Local authorities (Record of Protected Structures) | CC BY 4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | Local authorities (consultation portals) | Public | 1 Nov 2026 |
| www2.courts.ie | — | © the publisher | 31 Oct 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC BY 4.0 | 26 Oct 2026 |
| services.arcgis.com | Dublin local authorities (housing delivery pipeline) | CC BY 4.0 | 26 Oct 2026 |
| esbnetworks.ie | — | © the publisher · flag only | 11 Sept 2026 |
| transportforireland.ie | National Transport Authority | CC BY 4.0 | 25 Oct 2026 |
| lda.ie | Land Development Agency | CC BY 4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | Public | 1 Nov 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC BY 4.0 | 1 Nov 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC BY 4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC BY 4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | © PSRA, PSI licence | 1 Nov 2026 |
| services.arcgis.com | Local authorities (RZLT maps) | CC BY 4.0 | 25 Oct 2026 |
| gov.ie | Department of Education | CC BY 4.0 | 27 Oct 2026 |
| gov.ie | Department of Housing | CC BY-SA 4.0 | 23 Oct 2026 |
| tusla.ie | Tusla (Early Years Inspectorate) | Public register | 28 Oct 2026 |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC BY 4.0 | 25 Oct 2026 |