Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 5 Nov 2026, 10:12

Sydney Avenue

53.29909, -6.18321

Homes here mostly date from 1919–1945. Home extensions nearby almost always get approved (98%). 98 homes approved 224 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Sydney AvenueBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2022: 1 file on Sydney Avenue2024: 2 files on Sydney Avenue2025: 5 files on Sydney Avenue8 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
Yes
Protected or listed · a protected building (House Terrace); in a conservation area (Sydney Avenue, Blackrock)
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Protected buildingOn this site House Terrace; House Terrace
Conservation areaOn this site Sydney Avenue, Blackrock
Radon1 in 20 homes have high radon (EPA)

Not on this site: heritage inventory, monument zone, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Conservation areas3Blackrock Village; Sydney Avenue, Blackrock
Radon grid squares3
Protected buildings186Blackrock Railway Station; Lios an Uisce
Monuments2Cross; R149443
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), Architectural Conservation Areas, EPA radon map, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Sites and Monuments Record · fetched 1 Nov 2026, 23:58
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

This is a protected building: almost any change, inside or out, needs permission.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 96–100% by type. A new house in a garden is harder: 70% approved, and 1 in 6 is asked for more information.

Single-storey rear82 decided · more info asked 10%
100% · council 96%
Two-storey rear46 decided · more info asked 11%
96% · council 92%
Two-storey side16 decided · more info asked 6%
100% · council 95%
Single-storey side13 decided · more info asked 0%
100% · council 96%
Attic or dormer124 decided · more info asked 8%
96% · council 94%
First-floor17 decided · more info asked 12%
100% · council 90%
Garage conversion18 decided · more info asked 6%
100% · council 99%
Porch or front16 decided · more info asked 0%
100% · council 98%
New house in a garden or site30 decided · more info asked 17%
70% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 362 nearby, 3,892 council-wide

Figure 3

Sydney Avenue, file by file since 2022

3 of 3 decided extensions on the road were approved.

8 planning files on Sydney Avenue since 2022, by kind and decision.20222023202420252026Extensions, atticsNo. 20 · 2022 · two-storey rear · approved · D22A/0633No. 12 · 2024 · two-storey rear · approved · D24A/0099/WEBNo. 21 · 2025 · two-storey rear · withdrawn or invalid · D25A/0104/WEBNo. 21 · 2025 · two-storey rear · approved · D25A/0144/WEBPorches, roofs, otherNo. 430 · 2024 · other work · approved · D24A/0031No. 18 · 2025 · other work · refused · D25A/0022/WEBNo. 42 · 2025 · other work · approved · D25A/0620/WEBNo. 48 · 2025 · other work · approved · D25A/1002/WEBNew house in a side garden
ApprovedRefusedWithdrawn or invalid

8 files with "Sydney Avenue" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

1 approved2 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear21—
Dormer or attic10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 51 days. 1 in 10 is asked for more information, which adds about 61 days. Building starts about 6 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 10): 112 days; Appeal window: 4 weeks; If appealed: +134 days; Building starts: 172 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 49–54 (n=366)51 daysIf more info asked (1 in 10)With further information: median 112 days (n=39)112 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 134 days (n=81, all appeals within 1.5 km)+134 daysBuilding startsStart notice: median 172 days after permission (n=190)172 days after permissionSigned off356 days after the start, for the few who file. 63% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated405 decided home extensions, 191 start notices, 81 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    12 of 33 appealed refusals became permissions. 6 of 51 appealed approvals were reversed.

    Refusals appealed33 decided
    12 became permissions
    Approvals appealed51 decided
    6 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 6 in the last 12 months

    None of 2 changed the council's decision

    • 501719 Pending · 9-11, Rock Hill, Blackrock, Dublin, A94P5C7 · 455 m
    • 501674 Pending · 5, Mount Merrion Avenue, Blackrock, Dublin, A94W9P2 (Protected… · 329 m
    • 500969 Refused · Land to the rear of, Carysfort House, Carysfort Avenue, Blackrock,… · 488 m report
    • 324043 Granted with conditions · In the townland of Merrion, Chesterfield, Cross Avenue, Blackrock,… · 399 m report
    • 501341 Invalid · 1, Brusna Cottages, Blackrock, Co. Dublin (ACA) · 420 m
    • 324038 Invalid · In the townland of Merrion, Chesterfield, Cross Avenue, Blackrock,… · 399 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher4 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 4

    What's changing around you?

    Street map around Sydney Avenue with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingDerelict buildingApproved, not startedBuilding startedOtherApprovedNo decision yet
    1. 1Lands at and between, Carrickmines 220kV Substation D26A/0763/WEBNo decision yet · 199 m
    2. 233 Waltham Terrace, Blackrock D26A/0740/WEBNo decision yet · 354 m
    3. 320 Sweetman's Avenue, Blackrock D26A/0757/WEBNo decision yet · 427 m
    4. 44, Anglesea Avenue D26B/0463/WEBNo decision yet · 178 m
    5. 5DERELICT, WAVERLY LODGE DS: 1696Derelict building · 179 m
    6. 6Frascati Centre D21A/0996Approved, no sign building has started · 224 m
    7. 76 Anglesea Avenue, Blackrock D25B/0096/WEBBuilding started · 177 m
    8. 8Frascati Shopping Centre, Frascati Road D25A/0073/WEBBuilding started · 192 m
    9. 9Site to the rear of 39 Georges Avenue, Blackrock V/093/25Section 5: exempt · 13 m
    10. 1065, Carysfort Avenue D26A/0308/WEBApproved · 194 m
    11. 11Presbyterian Church, Saint Andrew's Church REF13126Section 5: needs permission · 217 m
    12. 1223 Green Road, Blackrock D26A/0616/WEBApproved · 221 m
    13. 1386 Carysfort Avenue, Blackrock D26A/0612/WEBApproved · 228 m
    14. 1448, Sydney Avenue D25A/1002/WEBApproved · 238 m
    15. 15Rear of No. 4 Prince Edward Terrace Lower, Carysfort Avenue & fronting to Brookfield Terrace D26A/0337/WEBNo decision yet · 324 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 154 permissions since 2016, 71 show a start notice and 15 have a completion certificate.

    208 applications lodged within 500 m. Council: 154 approved, 19 refused. After appeals: 154 approved. Of those: 15 signed off, 26 built with the owner's opt-out, 30 started, 80 with no start notice found, 3 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT154: lodged → approved19: lodged → refused23: lodged → withdrawn or invalid12: lodged → undecided151: approved → approved14: refused → refused23: withdrawn or invalid → withdrawn12: undecided → undecided1 approved by the council, undecided after an appeal1 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal3 refused by the council, approved after an appeal1 refused by the council, undecided after an appeal1 refused by the council, withdrawn or invalid after an appeal80: approved → no start notice found26: approved → built, owner opted out30: approved → started, not signed off15: approved → signed off3: approved → ran out208 lodged208 lodged154 approved154 approved19 refused19 refused23 withdrawn or invalid23 withdrawn or invalid12 undecided12 undecided154 approved154 approved15 refused15 refused25 withdrawn25 withdrawn14 undecided14 undecided80 no start notice found80 no start notice found26 built, owner opted out26 built, owner opted out30 started, not signed off30 started, not signed off15 signed off15 signed off3 ran out3 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured208 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    4 deadlines within 500 m; the first closes 9 Nov 2026.

    4 deadlines in the next 30 days: 2026-11-09 D26A/0740/WEB: application received — Permission is sought for the restoration and refurbishment of the existing semi-; 2026-11-09 D26B/0463/WEB: REQUEST ADDITIONAL INFORMATION — The development will consist of the construction of a single storey extension t; 2026-11-13 D26A/0757/WEB: application received — The proposed development will consist of: • Construction of a first floor extens; 2026-11-16 D26A/0763/WEB: application received — The development will consist of the provision of: a c. 7.03km underground cabletoday10 Nov15 Nov20 Nov25 Nov30 Nov5 DecD26A/0740/WEB: application received — Permission is sought for the restoration and refurbishment of the existing semi- · 354 m away · 2026-11-09D26B/0463/WEB: REQUEST ADDITIONAL INFORMATION — The development will consist of the construction of a single storey extension t · 178 m away · 2026-11-09D26A/0757/WEB: application received — The proposed development will consist of: • Construction of a first floor extens · 427 m away · 2026-11-13D26A/0763/WEB: application received — The development will consist of the provision of: a c. 7.03km underground cable · 199 m away · 2026-11-16
    Comments closeTime to appeal ends
    • Comments close 9 Nov 20264 days left
      2D26A/0740/WEB · application received — Permission is sought for the restoration and refurbishment of the existing semi-
      €20 to the council · 354 m away
    • Time to appeal ends 9 Nov 20264 days left
      4D26B/0463/WEB · REQUEST ADDITIONAL INFORMATION — The development will consist of the construction of a single storey extension t
      €220 to An Coimisiún Pleanála (€110 observer) · 178 m away
    • Comments close 13 Nov 20268 days left
      3D26A/0757/WEB · application received — The proposed development will consist of: • Construction of a first floor extens
      €20 to the council · 427 m away
    • Comments close 16 Nov 202611 days left
      1D26A/0763/WEB · application received — The development will consist of the provision of: a c. 7.03km underground cable
      €20 to the council · 199 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    98 homes 224 m away were approved May 2023 with no start notice yet; the permission runs to May 2028. BusConnects Core Bus Corridors is planned 268 m away.

    Frascati Centre · 98 homes: 98 homes approved May 2023, not started; BusConnects Core Bus…: core bus corridor (DLR County Development Plan 2022-2028)2023202420252026202720282029Frascati Centre · 98 homes224 m · D21A/099698 homes approved May 2023, not started98 homes approved May 2023, not startedBusConnects Core Bus…268 m · plannedcore bus corridor (DLR County Development Plan 2022-2028)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 2 within 500 m

    Derelict building 1

    • 5DERELICT, WAVERLY LODGE · listed as derelict · 179 m

    Approved, not started 1

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
    Council meetings (ModernGov)Public5 Nov 2026, 02:33open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
    Figure 9

    Applications within 500 m, by year

    Between 28 and 40 a year; busiest 2024. 89% of decisions were approvals.

    2021: 44, 2022: 28, 2023: 36, 2024: 40, 2025: 40, 2026: 20010203040502021: 37 approved2021: 5 refused2021: 2 withdrawn or invalid44’21*2022: 23 approved2022: 2 refused2022: 1 withdrawn or invalid2022: 2 undecided28’222023: 32 approved2023: 2 refused2023: 1 withdrawn or invalid2023: 1 undecided36’232024: 28 approved2024: 3 refused2024: 8 withdrawn or invalid2024: 1 undecided40’242025: 27 approved2025: 5 refused2025: 7 withdrawn or invalid2025: 1 undecided40’252026: 7 approved2026: 2 refused2026: 4 withdrawn or invalid2026: 7 undecided20’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 31 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Building work nearby 16 in the last 12 months
    3 signed off as finished6 not signed off7 no sign-off needed
    • Normal Unit No. D2, Frascati Centre, Frascati Road, Blackrock, Dublin, A94 Y2W6 · 26 Oct 2026 · 7-day notice not signed off · P/1560/26 · 215 m
    • 8Frascati Shopping Centre, Frascati Road, Blackrock, Dublin · 24 Sept 2026 · 7-day notice not signed off · D25A/0073/WEB · 192 m
    • 37 Main Street, Blackrock, Dublin, A94 X0P4 · 3 Sept 2026 · 7-day notice not signed off · D26A/0345/WEB · 443 m
    • 12 Brookfield Avenue, Blackrock, Dublin, A94 WN67 · 10 Aug 2026 · 1 homes · short notice no sign-off needed · D25A/0758/WEB · 299 m
    • 7 George's Avenue, Blackrock, Dublin · 21 Jul 2026 · 7-day notice not signed off · D25A/0352/WEB · 407 m
    • 76 Anglesea Avenue, Blackrock, Dún Laoghaire-Rathdown, A94 F4E4 · 2 Jun 2026 · 1 homes · short notice no sign-off needed · D25B/0096/WEB · 177 m
    • Blackrock Shopping Centre, Rock Hill, Blackrock, Co. Dublin, Blackrock, Dún Laoghaire-Rathdown, A94 C2N7 · 13 Apr 2026 · short notice no sign-off needed · D24A/0800/WEB · 456 m
    • 54 Waltham Terrace, Blackrock, Dún Laoghaire-Rathdown, A94 X7V0 · 24 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0519/WEB · 493 m
    • 14 Idrone Lane, Blackrock, Dún Laoghaire-Rathdown, A94 ED35 · 12 Mar 2026 · 1 homes · 7-day notice not signed off · SI75 EXEMPT. SA/60058 · 488 m
    • 16 Green Road, Blackrock, Dublin · 6 Mar 2026 · start notice, opted out no sign-off needed · D25B/0363 · 163 m
    • 23 Brooklawn, Blackrock, Dún Laoghaire-Rathdown · 10 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0432 · 302 m
    • 21A Sydney Avenue, Dublin, Dún Laoghaire-Rathdown, A94 EW74 · 28 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0144/WEB · 38 m
    • Unit G01 Frascati SC Blackrock, Dublin, Dun Laoghaire Rathdwon, Dublin, Dún Laoghaire-Rathdown, A94 V0T0 · 22 Jan 2026 · start notice signed off · D24A/0262/WEB · 289 m
    • Unit D3, Frascati SC, Blackrock, Dublin, Dun Laoghaire Rathdown, Dublin, Dún Laoghaire-Rathdown, A94 V0T0 · 5 Jan 2026 · start notice signed off · 21A/0468 · 289 m
    • Unit 3 /6 Rock Hill Blackrock Village Centre, Blackrock village, Dún Laoghaire-Rathdown, A94 TK22 · 18 Dec 2025 · 7-day notice not signed off · D22A/0268 · 397 m
    • Unit G29 Frascati SC Blackrock, Dublin, Dunlaoghaire Rathdown, Dublin, Dún Laoghaire-Rathdown, A94 Y2W6 · 3 Dec 2025 · start notice signed off · 296 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Homes coming 98 not started
    • Alto Apartments, Frascati Centre, Blackrock, Co. Dublin (Phase 1)* · Completed · 3 homes · 380 m
    • Crofters Quarter, Deansgrange Road, Deansgrange, Blackrock, Co. Dublin (Phase 1)* · Completed · 120 homes · 380 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Frascati Centre8282 not started (2026-Q2)123 m
    Merrion——399 m
    Merrion at——399 m
    Cross Avenue246246 built (2025-Q1)537 m
    4.56 ha at St. Teresa's House and St. Teresa's Lodge291291 not started (2026-Q2)548 m
    Temple Hill and Temple Road——549 m
    3.9 ha at ‘St. Teresa’s House’ and ‘St. Teresa’s Lodge’ Temp——549 m
    Chesterfield3333 not started (2025-Q2)888 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Coco's Creche & Montessori · Crèche15 May 2026 · report · Tusla Early Years Inspectorate163 m
    Blackrock Community Playgroup · Crèche7 Dec 2023 · report · Tusla Early Years Inspectorate518 m
    Little Apples Academy · Crèche25 Aug 2025 · report · Tusla Early Years Inspectorate540 m
    Our World Montessori Ltd. · Crèche29 Apr 2026 · report · Tusla Early Years Inspectorate825 m
    Simbas Childcare Limited · Crèche27 May 2024 · report · Tusla Early Years Inspectorate945 m
    Coco's Childcare · Crèche26 Feb 2026 · report · Tusla Early Years Inspectorate964 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.02 Nov 2026, 23:01open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register4 Nov 2026, 23:36open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here750
    Council middle33
    Homes started
    Here139
    Council middle81
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    68% of homes built before 1971 (council 38%). 69% owner-occupied (council 68%).

    Homes built before 1971
    68% · council 38%
    Homes built since 2001
    5% · council 25%
    Owner-occupied
    69% · council 68%
    Rented
    23% · council 29%
    Children under 15
    21% · council 18%
    Aged 65 and over
    15% · council 17%
    Households with 2+ cars
    29% · council 39%
    Work mainly from home
    22% · council 19%
    This small area (322 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267021007

    Bus
    233 m
    Carysfort Avenue · 114, L26 · busiest stop within 500 m: 14 an hour at peak
    Planned
    268 m
    BusConnects Core Bus Corridors, Blackrock to Merrion
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    221 m
    Carysfort Ns, 583 pupils
    Homes sold nearby
    103
    in 3 years, 45 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Carysfort Ns · primary · 583 pupils · 221 m
    • Benincasa Special School · primary · 35 pupils · 354 m
    • Dominican College · postprimary · 521 pupils · 514 m
    • Booterstown NS · primary · 85 pupils · 544 m
    • Blackrock College · postprimary · 1041 pupils · 695 m

    Stops 32

    • Carysfort Avenue · 114, L26 · 3/hour at peak · 233 m
    • Frascati Road · 114, L26 · 3/hour at peak · 237 m
    • Frascati SC · 4, 7, 702, 7A, 7E, S6 · 14/hour at peak · 289 m
    • UCD Smurfit · 114, L26 · 3/hour at peak · 294 m
    • Frascati SC · 4, 702 · 4/hour at peak · 295 m
    • UCD Smurfit · 114, L26 · 3/hour at peak · 318 m
    • Sydney Avenue · S6 · 4/hour at peak · 319 m
    • Sydney Avenue · S6 · 4/hour at peak · 333 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Carysfort Ns · 221 m-0.9% pupils (583)
    • Benincasa Special School · 354 m-16.7% pupils (35)
    • Dominican College · 514 m+2.6% pupils (521) · 3 classrooms 2025, approved with conditions · an extension 2024, approved
    • Booterstown NS · 544 m-7.6% pupils (85)
    • Blackrock College · 695 m-1.1% pupils (1,041) · an extension 2024, approved

    Council meetings 3 items

    Public land

    • University College Dublin · 0.7 ha · 202 m
    • University College Dublin · 0.82 ha · 232 m
    • Dún Laoghaire-Rathdown County Council · 0.27 ha · 254 m
    • University College Dublin · 1.6 ha · 255 m
    • Dún Laoghaire-Rathdown County Council · 0.25 ha · 268 m
    • University College Dublin · 1.37 ha · 291 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Council consultation portalsPublic5 Nov 2026, 01:15open
    Council meetings (ModernGov)Public5 Nov 2026, 02:33open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Protected building: what changes would you be allowed?
      Ask for: A section 57 declaration from the council.
      Council
    2. In a conservation area: which outside changes need permission?
      Ask for: The council's guidance for the area.
      Council
    3. 98 homes approved 224 m away (Frascati Centre), not started: what is planned?
      Ask for: The planning file for D21A/0996.
      Council
    4. Application 199 m away open for comments until 16 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    5. Decision 178 m away can be appealed until 9 Nov 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Blackrock
    Electoral division
    Blackrock-Central
    Electoral area
    Blackrock
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); protected building; in a conservation area; no vacant land tax.
    • 2 sites nearby could change: 1 derelict, 1 approved scheme.
    • 3 applications open for comments nearby; nearest closes 16 Nov 2026.
    • 98 homes approved nearby, not started; largest 98 at Frascati Centre.
    • Frascati SC (bus 4, 7) 289 m away: 14 an hour at morning peak; 104 from all stops within 500 m. Planned: BusConnects Core Bus Corridors 268 m away, core bus corridor (DLR County Development Plan 2022-2028).
    • Here (2022 census): 68% owner-occupied (council 68%); 8% of homes empty (council 6%); most built 1919–1945; 30% drive to work (council 43%); population up 1% since 2016.
    • 3 home extensions within 250 m since 2026. Most were single-storey rear extensions.
    • Around here the council decides in a median 51 days (about 7 weeks); 1 in 8 is asked for more information.
    What the terms mean 10 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Conservation area (Architectural Conservation Area (ACA)): A street or area whose character is protected.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 32
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
    www2.courts.ie—© the publisher4 Nov 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.02 Nov 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 5 Nov 2026, 10:12 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.