R2 — Existing residentialsouth dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028
RES: To protect and/or improve residential amenity
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
gates/railings/walls; Tynan Memorial Cross; demesne walls/gates/railings
Radon risk area
3
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels
This site is on an RZLT map — the draft map 2027 and the final map 2026 (0.02 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
New pedestrian side access gate to the rear garden and the construction of a single-storey mono-pitch front porch extension with relocation of the existing front entrance door.
SD26B/0305Wreceived 19 Jun 2026decided 7 Aug 20260 m away
Construction of a two-storey extension above existing rear extension and new single storey extension to rear and side of existing dwelling. All other associated ancillary site works.
SD26B/0233Wreceived 15 May 2026decided 7 Jul 2026468 m away
Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout.
Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.
SD26A/0046Wreceived 19 Feb 2026decided 14 Apr 2026325 m away
Demolition and removal of existing single and two storey showroom extensions (485 sq Mts) to front elevation (facing Belgard Road) and side elevation (facing Cookstown Estate Road), along with removal of projecting canopy on this side elevation, re-fenestration to front facade (facing Belgard Road) along with a section of side facade (facing Cookstown Estate Road), to include fitting of new curtain walling with matching entrance doors along new wall cladding and new illuminated building signage and required site works.
SD25A/0232Wreceived 27 Nov 2025decided 10 Dec 2025435 m away
Retention of existing timber fence to the front, and two internal boundary walls within the front and side garden, each incorporating a pedestrian gate. Retention of pitched-roof shed to the rear of the property. Permission for a new front vehicular access with dropped kerb, including partial removal of the existing front boundary wall. Infill of existing open-walled front porch to provide new front entrance door.
SD25B/0638Wreceived 7 Nov 2025decided 12 Jan 2026176 m away
Change of use, and associated internal works, of part of the existing building (167 sq.m. approx.) from warehouse to part workshop/light industrial (89 sq.m. approx.) and part water sampling hub (78 sq.m. approx.) to facilitate the overall use of the building as an Uisce Éireann Operations Centre; the provision of a window and security shutter on the north eastern façade of the building; the provision of a wash bay and 4 No. materials bunkers in external yard area; 2 No. replacement vehicular gates; a new pedestrian gate; Uisce Éireann signage on front (southwest) elevation; external air handling unit on northwestern side of building; and associated site development and drainage works.
SD25A/0144Wreceived 24 Sept 2025decided 21 Oct 2025403 m away
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
SD25B/0507Wreceived 22 Aug 2025decided 16 Oct 2025287 m away
Planning permission is sought for 1 no. Outdoor Padel tennis court facilities with protected screening around playing surface , permission sought for this outdoor playing facility for a period of 5 years only and all associated site works
SD25A/0190Wreceived 16 Aug 2025decided 10 Oct 2025430 m away
Planning permission is sought for 2 no. Outdoor Padel tennis court facilities with protected screening around both playing surface , permission also sort to operate a social wine service at existing ancillary cafe located internally and all associated site works
SD25A/0083Wreceived 6 Apr 2025decided 27 May 2025430 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
310 THE CRESCENT, BELGARD HEIGHTS, TALLAGHT DUBLIN 24
16 Dec 2024
€520,000
—
—
—
—
—
—
255 m
8 GARRYNISK SQ, OLD BELGARD RD, TALLAGHT DUBLIN 24
4 Dec 2024
€330,000
—
—
—
—
—
—
252 m
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 11 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Dublin City Council — Dublin city and suburbs
0.56 hafolio DN18547N121 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
2.72 hafolio DN23088F159 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
1.35 hafolio DN23088F226 m awayas of 1 Apr 2023
South Dublin County Council — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 09:16 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.