The modification of the site entrance on the northern boundary, including the replacement of the existing gates with new wider gates and associated changes to the carriageway and perimeter security fencing. The construction of a new, single storey security building and the construction of a new vehicular security enclosure with new security fencing and a second set of matching inner gates. The rearrangement of the two existing accessible parking spaces and the relocation of 7 car parking spaces to the southern boundary of the site, retaining 24 car parking spaces on the site overall as per PP SD17A/0448. Relocating the existing bicycle shelter and all associated ancillary site works. The total area of the proposed new security building is 50.75 sqm.
SD26A/0134Wreceived 8 Jun 2026decided 4 Aug 2026490 m away
We are looking at having external insulation wrap put on our scout hall. The wrap will be 150mm thick and will finish off in a grey colour similar to the existing block work colour. All external work will include new window sills, flashing, new waste pipes & moving of existing gas pipes.
ED26/0051received 25 May 2026decided 22 Jun 2026154 m away
Retention Permission for existing Marshals Hut 8.8M2 and Revised operating hours: Monday 07:30-17:30, Tuesday 07:30-23:30, Wednesday 07:30-23:00, Thursday 07:30-23:00, Friday 07:30-21:00, Saturday 08:00-19:30, Sunday & Bank Holidays - CLOSED, together with all associated works.
SD25A/0105Wreceived 2 May 2025decided 26 Jun 2025433 m away
Retention of existing detached single storey self - Service Laundry Kiosk as constructed along with Retention of associated signage and logos on existing Kiosk and all associated site works
SD25A/0049received 6 Mar 2025decided 24 Mar 2025472 m away
A proposed Sports Changing Rooms Pavilion at Tymon Park South, in the townland of Tymon North. In accordance with the
requirements of the above, notice is hereby given that South Dublin County Council proposes:
• One single storey pavilion building consisting of two individual team changing
rooms each with one WC area, one club storage area, and one plant room, all with individual access.
• 2 No. Storage facility for equipment with a Plant room.
• Ancillary landscaping works adjacent to the pavilion building.
• All associated ancillary works in adjacent areas including but not limited to foul & surface water drainage and utility supplies.
• CCTV.
The proposal has undergone Appropriate Assessment Screening under the Habitats Directive (92/43/EEC) and screening for
Environmental Impact Assessment (EIA) under the EIA Directive 2014/52/EU. The Planning Authority has made a preliminary
examination of the nature, size and location of the proposed development. The authority has concluded that there is no real
likelihood of signifi cant e ects on the environment arising from the proposed development and a determination has been made
that an EIA is not required
SD248/0008received 28 Sept 2024decided 9 Dec 20240 m away
Upgrading and modernisation of Castletymon Shopping Centre and its environs. This will involve improvements within and around the shopping centre and along the roadway from the new Library / Bancroft Park and Tymon Park / National Basketball Arena. South Dublin County Council, In conjunction with the National Transport Authority, is actively trying to develop an improved cycle network throughout the county. This new network is intended to provide more sustainable transport options for commuters as well as active travel benefits for local communities. The proposed route no. 27 of the Cycle South Dublin is the Castletymon Road Cycle Scheme. It will provide cycle connectivity from Greenhills's Road to Tallaght Main Street and has a length of 1.8m. Under this scheme South Dublin County Council proposed to construct 250m length of cycleway as a first stage of this network. This provides a better active travel link to Castletymon shopping centre, local amenities, NBA arena, schools, and parks within the length of the road. Scheme objectives: The Castletymon Shopping Centre District Centre Enhancement Programme has a number of objectives; To modernise and support local businesses; To enhance pedestrian and cycle facilities to and within the centre; To create links to and between the shopping centre, Bancroft Park and Tymon Park; To create more amenity space within the centre; To widen pedestrian areas in front of the shops footpaths; To combat anti-social behaviour; To modernise the look and support local businesses; To create a vibrant and distinctive place. Works include: Working with traders regarding the scheme and shopfront upgrades; Narrowing the carriageway; Provision of new cycle way; Creation of a landscaped plaza with street furniture; Rationalisation of the carpark layout; Improvement to the rear pedestrian access to the shopping centre; Upgrade works to the façade of the shopping centre; Commission of Art in the form of a Mural; Persons wishing to inspect drawings and particulars of the proposed development can do so as follows: ONLINE: Visit our virtual consultation room www.DCEPconsultation.com during the period from 9th November 2021 to 4th January 2022. IN PERSON: Due to Covid-19 restrictions, plans and particulars of the proposed development will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy, only by appointment, at County Hall, Tallaght, Dublin 24 during office hours from 9th November 2021 to 4th January 2022. Appointments can be made by contacting the Planning Department by email at planningdept@sdublincoco.ie or by phoning (01) 4149000. NOTE: South Dublin County Council would like to encourage submissions or observations noting elements of the scheme that they support and want to ensure are retained during the detailed design. Please make your submission by one medium only. All submissions should include your name and a contact address. It should be noted that the Freedom of Information Act, 1997-2006 (as amended) applies to all records held by South Dublin County Council. Submissions and observations with respect to the proposed development dealing with the proper planning and sustainable development of the area in which the proposed development will be situated, may be made in writing up to 5.00pm on the 4th January 2022 and may be submitted: ONLINE: www.dcepconsultation.com or http://consult.sdublincoco.ie In writing: Post to Senior Engineer, Roads Maintenance, LUPT, South Dublin County Council, County Hall, Tallaght, Dublin 24 YNN5.
SD218/0010received 9 Nov 2021decided 14 Feb 2022403 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 11 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Electricity Supply Board — Dublin city and suburbs
0.44 hafolio DN192F64 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
21.17 hafolio DN3445N341 m awayas of 1 Apr 2023
South Dublin County Council — Dublin city and suburbs
0.47 hafolio DN113077F341 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
4.85 hafolio DN4659N428 m awayas of 1 Apr 2023
South Dublin County Council — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 12:37 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.