PlanningRegister.ie
Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 16 Oct 2026, 09:05

Trimbleston

53.29994, -6.23211

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (91%). A building site 360 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of TrimblestonBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2006: 2 files on Trimbleston2008: 1 file on Trimbleston2009: 1 file on Trimbleston2014: 1 file on Trimbleston2016: 1 file on Trimbleston2017: 1 file on Trimbleston2022: 1 file on Trimbleston2023: 1 file on Trimbleston2025: 3 files on Trimbleston12 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Conservation areas1Castle Cottages, Roebuck Road, Clonskeagh
Radon grid squares1
Protected buildings4Little Sisters of the Poor / Holy Family Residence (formerly Hermitage); Glenard (Friarland)
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Architectural Conservation Areas, Records of Protected Structures · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 78–98% by type. A new house in a garden is harder: 61% approved, and 1 in 3 is asked for more information.

Single-storey rear157 decided · more info asked 19%
94% · council 96%
Two-storey rear76 decided · more info asked 24%
83% · council 90%
Two-storey side35 decided · more info asked 29%
97% · council 94%
Single-storey side28 decided · more info asked 21%
96% · council 96%
Attic or dormer329 decided · more info asked 16%
91% · council 92%
First-floor45 decided · more info asked 16%
78% · council 89%
Garage conversion54 decided · more info asked 11%
98% · council 99%
Porch or front28 decided · more info asked 7%
96% · council 98%
New house in a garden or site57 decided · more info asked 37%
61% · council 62%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 809 nearby, 6,622 council-wide

Figure 3

Trimbleston, file by file since 2006

4 of 4 decided extensions on the road were approved.

12 planning files on Trimbleston since 2006, by kind and decision.20062008201020122014201620182020202220242026Extensions, atticsNo. 166 · 2009 · two-storey rear · approved · D09B/0284No. 185 · 2022 · attic conversion / dormer · approved · D22B/0471No. 07 · 2023 · side · approved · D23A/0565No. 204 · 2025 · attic conversion / dormer · withdrawn or invalid · D25B/0042/WEBNo. 204 · 2025 · attic conversion / dormer · withdrawn or invalid · D25B/0048/WEBNo. 204 · 2025 · attic conversion / dormer · approved · D25B/0165/WEBPorches, roofs, otherNo number · 2006 · other work · approved · D06A/1510No. 19 · 2006 · other work · approved · D06A/1635No. 20 · 2008 · other work · approved · D08B/0147No. 07 · 2014 · other work · approved · D14A/0001No. 07 · 2016 · other work · refused · D16A/0592No. 07 · 2017 · other work · approved · D17A/0305New house in a side garden
ApprovedRefusedWithdrawn or invalid

12 files with "Trimbleston" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2006–2026

Extensions and refusals right beside you 4 within 250 m · 0 refused within 100 m

Extensions and refusals near you 4 extensions within 250 m · the last 12 months

1 approved1 refused2 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear301
Dormer or attic11—

On Trimbleston: 11 extensions in 10 years, 92% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 6 is asked for more information, which adds about 64 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 6): 118 days; Appeal window: 4 weeks; If appealed: +134 days; Building starts: 144 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 50–55 (n=712)52 daysIf more info asked (1 in 6)With further information: median 118 days (n=158)118 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 134 days (n=180, all appeals within 1.5 km)+134 daysBuilding startsStart notice: median 144 days after permission (n=462)144 days after permissionSigned off414 days after the start, for the few who file. 67% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated870 decided home extensions, 465 start notices, 180 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    31 of 64 appealed refusals became permissions. 10 of 122 appealed approvals were reversed.

    Refusals appealed64 decided
    31 became permissions
    Approvals appealed122 decided
    10 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 501426 Pending · 16 The Grove, Goatstown Road, Dublin 14, D14Y5H0 · 208 m
    • 500339 Withdrawn · 46, Saint Aidan's Drive, Goatstown, Dublin 14, D14PP80 · 225 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Courts Service legal diary (judicial reviews)© the publisher16 Oct 2026, 01:34open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 4

    What's changing around you?

    Street map around Trimbleston with 15 numbered planning items
    ⌖ the houseOpen for commentsBuilding site that stoppedBuilding startedApprovedRefusedOtherNo decision yet
    1. 12, Harlech Grove D26B/0518/WEBNo decision yet · 282 m
    2. 235, Farmhill Road D26B/0519/WEBNo decision yet · 432 m
    3. 3Goatstown Road, Goatstown ABP30943021Building site that stopped · 360 m
    4. 44 Harvard, Ardilea D25A/0383/WEBBuilding started · 105 m
    5. 533 Harlech Crescent, Dublin 14 D26A/0127Building started · 193 m
    6. 633, Harlech Crescent D26A/0127Approved · 185 m
    7. 716 The Grove, Goatstown Road D26B/0131/WEBRefused · 208 m
    8. 817 The grove, Goatstown Road REF18425Section 5: needs permission · 214 m
    9. 99 Princeton, Ardilea D26B/0232/WEBApproved · 272 m
    10. 1027, Friarsland Road D26B/0448/WEBNo decision yet · 382 m
    11. 117, The Palms D26B/0033/WEBApproved · 403 m
    12. 125, Salamanca D26A/0484/WEBApproved · 404 m
    13. 1327, Farmhill Road D26B/0135/WEBApproved · 408 m
    14. 146 Friarsland, Roebuck Road D26B/0331/WEBApproved · 415 m
    15. 154, Goatstown Avenue D26B/0348/WEBApproved · 438 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 164 permissions since 2016, 88 show a start notice and 7 have a completion certificate. Most owners opt out of sign-off.

    209 applications lodged within 500 m. Council: 164 approved, 15 refused. After appeals: 164 approved. Of those: 7 signed off, 50 built with the owner's opt-out, 31 started, 76 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT164: lodged → approved15: lodged → refused27: lodged → withdrawn or invalid3: lodged → undecided161: approved → approved12: refused → refused27: withdrawn or invalid → withdrawn3: undecided → undecided3 approved by the council, withdrawn or invalid after an appeal3 refused by the council, approved after an appeal76: approved → no start notice found50: approved → built, owner opted out31: approved → started, not signed off7: approved → signed off209 lodged209 lodged164 approved164 approved15 refused15 refused27 withdrawn or invalid27 withdrawn or invalid3 undecided3 undecided164 approved164 approved12 refused12 refused30 withdrawn30 withdrawn3 undecided3 undecided76 no start notice found76 no start notice found50 built, owner opted out50 built, owner opted out31 started, not signed off31 started, not signed off7 signed off7 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured209 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 29 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-29 D26B/0518/WEB: application received — Development comprising an extension and alterations including partial demolitio; 2026-10-30 D26B/0519/WEB: application received — The development will consist of the removal of the existing side extension andtoday21 Oct26 Oct31 Oct5 Nov10 Nov15 NovD26B/0518/WEB: application received — Development comprising an extension and alterations including partial demolitio · 282 m away · 2026-10-29D26B/0519/WEB: application received — The development will consist of the removal of the existing side extension and · 432 m away · 2026-10-30
    Comments close
    • Comments close 29 Oct 202613 days left
      1D26B/0518/WEB · application received — Development comprising an extension and alterations including partial demolitio
      €20 to the council · 282 m away
    • Comments close 30 Oct 202614 days left
      2D26B/0519/WEB · application received — The development will consist of the removal of the existing side extension and
      €20 to the council · 432 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    1 building site nearby stopped before sign-off.

    Goatstown Road, Goatstown: homes, started Mar 2022, never signed off2022202320242025202620272028Goatstown Road, Goatstown360 m · ABP30943021homes, started Mar 2022, never signed offhomes, started Mar 2022, never signed offtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 1 within 500 m

    Building site that stopped 1

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    Council meetings (ModernGov)Public16 Oct 2026, 01:42open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
    Figure 9

    Applications within 500 m, by year

    Between 16 and 28 a year; busiest 2025. 92% of decisions were approvals.

    2016: 3, 2017: 17, 2018: 20, 2019: 23, 2020: 17, 2021: 25, 2022: 19, 2023: 16, 2024: 21, 2025: 28, 2026: 2001020302016: 2 approved2016: 1 withdrawn or invalid3’16*2017: 15 approved2017: 2 refused17’172018: 16 approved2018: 1 refused2018: 3 withdrawn or invalid20’182019: 22 approved2019: 1 refused23’192020: 11 approved2020: 2 refused2020: 4 withdrawn or invalid17’202021: 22 approved2021: 1 refused2021: 2 withdrawn or invalid25’212022: 17 approved2022: 2 refused19’222023: 14 approved2023: 2 refused16’232024: 17 approved2024: 2 refused2024: 2 withdrawn or invalid21’242025: 19 approved2025: 1 refused2025: 8 withdrawn or invalid28’252026: 9 approved2026: 1 refused2026: 7 withdrawn or invalid2026: 3 undecided20’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 26 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Building work nearby 15 in the last 12 months
    1 not signed off14 no sign-off needed
    • 46 Saint Aidan's Drive, Dublin 14, Dublin, D14 PP80 · 28 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0513/WEB · 230 m
    • 88 Goatstown Road, Dublin 14, Dublin, D14 K462 · 5 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0489/WEB · 292 m
    • 4 Goatstown Avenue, Dublin 14, Dublin, D14 X674 · 19 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · D26B/0348/WEB · 449 m
    • 10 Roebuck Downs, Dublin 14, Dublin, D14 RK72 · 15 Sept 2026 · 1 homes · short notice no sign-off needed · D21B/0432 · 238 m
    • 9 Princeton, Dublin 14, Dublin, D14 KC67 · 31 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · D26B/0232/WEB · 285 m
    • 28 The Palms, Dublin 14, Dublin, D14 FX31 · 24 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · D26A/0270/WEB · 486 m
    • 85 Mulvey Park, Dublin 14, Dublin, D14 TP68 · 20 Jul 2026 · 1 homes · short notice no sign-off needed · D26A/0007/WEB · 481 m
    • 7 The Palms, Dublin 14, Dublin, D14 TN50 · 25 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · D26B/0033/WEB · 429 m
    • Goatstown Road, Dublin, Dún Laoghaire-Rathdown, 01/03/2027 · 15 Jun 2026 · 7-day notice not signed off · D24A/0133 · 210 m
    • 533 Harlech Crescent, Dublin 14, Dublin, D14 Y997 · 8 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · D26A/0127 · 193 m
    • 44 Harvard, Ardilea, Clonskeagh, Dún Laoghaire-Rathdown, D14 XV77 · 6 May 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0383/WEB · 105 m
    • 21 Roebuck Road, Clonskeagh, Dún Laoghaire-Rathdown, D14 Y579 · 16 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0533/WEB · 427 m
    • 5 Larchfield Park, GOATSTOWN, Dún Laoghaire-Rathdown, D14 X093 · 5 Feb 2026 · 1 homes · short notice no sign-off needed · D23B/0182 · 388 m
    • 34 Harlech Crescent, Dublin, D14 R960 · 3 Nov 2025 · short notice no sign-off needed · D21A/0619 · 206 m
    • 76 Saint Aidan's Drive, Goatstown, Dún Laoghaire-Rathdown, D14 E424 · 20 Oct 2025 · short notice no sign-off needed · D25A/0529/WEB · 380 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 16 Oct 2026, 00:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Homes coming 0 not started
    • Site at Roebuck Road, Clonskeagh, Dublin 14 · Completed · 4 homes · 457 m
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Trimbleston · 17 applications in 10 years · 92% approved · most common: attic conversion / dormer

    Developments within 1.0 km

    SchemeHomesProgressDistance
    2.12 ha at Our Lady's Grove——93 m
    0.34 hectares comprising the car sales premises currently kn——216 m
    Vector Motors——216 m
    approx 0.34 hectares comprising the car sales premises curre——216 m
    car sales premises currently known as Vector Motors——216 m
    1.969 ha site at Our Lady's Grove——233 m
    Central Mental Hospital934934 not started (2026-Q2)478 m
    c.9.6 ha——478 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Ruths Montessori · Crèche7 May 2025 · report · Tusla Early Years Inspectorate185 m
    Flower Childcare Clonskeagh · Crèche27 Apr 2026 · report · Tusla Early Years Inspectorate528 m
    Ardilea Childcare Limited · Crèche31 Mar 2026 · report · Tusla Early Years Inspectorate566 m
    Ashgrove Creche and Montessori School · Crèche5 Nov 2025 · report · Tusla Early Years Inspectorate933 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.012 Oct 2026, 23:02open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here1,312
    Council middle49
    Homes started
    Here723
    Council middle92
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.09 Oct 2026, 23:03open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    58% of homes built before 1971 (council 38%). 84% owner-occupied (council 68%).

    Homes built before 1971
    58% · council 38%
    Homes built since 2001
    14% · council 25%
    Owner-occupied
    84% · council 68%
    Rented
    12% · council 29%
    Children under 15
    23% · council 18%
    Aged 65 and over
    23% · council 17%
    Households with 2+ cars
    42% · council 39%
    Work mainly from home
    19% · council 19%
    This small area (282 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267058002

    Bus
    71 m
    Goatstown Road · 11 · busiest stop within 500 m: 4 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    157 m
    Our lady's Grove Primary School, 409 pupils
    Homes sold nearby
    56
    in 3 years, 3 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Our lady's Grove Primary School · primary · 409 pupils · 157 m
    • Our Lady's Grove Secondary School · postprimary · 295 pupils · 215 m
    • Islamic National School · primary · 414 pupils · 469 m
    • St Kilian's Deutsche Schule · postprimary · 475 pupils · 471 m
    • Goatstown Educate Together Secondary School · postprimary · 366 pupils · 560 m
    • Gaelscoil Laighean · primary · 130 pupils · 912 m
    • Mount Anville Secondary School · postprimary · 726 pupils · 975 m

    Stops 41

    • Goatstown Road · 11 · 4/hour at peak · 71 m
    • Larchfield Road · 11 · 3/hour at peak · 128 m
    • Roebuck Downs · 11 · 3/hour at peak · 190 m
    • Larchfield Road · 11 · 4/hour at peak · 197 m
    • Willowfield Avenue · 11 · 4/hour at peak · 397 m
    • Goatstown Avenue · 11 · 3/hour at peak · 412 m
    • Islamic Centre · 11 · 4/hour at peak · 432 m
    • White Oaks · 11 · 3/hour at peak · 555 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Our lady's Grove Primary School · 157 m-1.9% pupils (409) · an extension 2026, refused
    • Our Lady's Grove Secondary School · 215 m-5.4% pupils (295) · an extension 2026, refused
    • Islamic National School · 469 m-2.1% pupils (414)
    • St Kilian's Deutsche Schule · 471 m-0.6% pupils (475)
    • Goatstown Educate Together Secondary School · 560 m+20.4% pupils (366)
    • Gaelscoil Laighean · 912 m+23.8% pupils (130)

    Open consultations

    Council meetings 2 items

    Public land

    • Health Service Executive · 0.16 ha · 67 m
    • Health Service Executive · 1.82 ha · 75 m
    • Dún Laoghaire-Rathdown County Council · 0.13 ha · 156 m
    • Dublin City Council · 0.22 ha · 166 m
    • Health Service Executive · 0.16 ha · 222 m
    • Dún Laoghaire-Rathdown County Council · 0.13 ha · 223 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Council consultation portalsPublic16 Oct 2026, 01:34open
    Council meetings (ModernGov)Public16 Oct 2026, 01:42open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Planning here goes back to 2007: is the house built as approved?
      Ask for: The original planning grant and an opinion of compliance.
      Solicitor
    2. Application 282 m away open for comments until 29 Oct 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Roebuck
    Electoral division
    Clonskeagh-Roebuck
    Electoral area
    Stillorgan
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 1 site nearby could change: 1 stalled build.
    • 2 applications open for comments nearby; nearest closes 29 Oct 2026.
    • Islamic Centre (bus 11) 432 m away: 4 an hour at morning peak; 23 from all stops within 500 m.
    • Here (2022 census): 84% owner-occupied (council 68%); 11% of homes empty (council 6%); most built 1946–1960; 50% drive to work (council 43%); population up 25% since 2016.
    • 4 home extensions within 250 m since 2025. Most were single-storey rear extensions. 1 single-storey rear extension refused. On Trimbleston: 11 in 10 years, 92% approved.
    • Around here the council decides in a median 53 days (about 8 weeks); 1 in 8 is asked for more information.
    • Homes started within 1 km: 673 in the last year, 21 three years before.
    What the terms mean 10 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.015 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public16 Oct 2026
    www2.courts.ie—© the publisher16 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.012 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public16 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.016 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence16 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 16 Oct 2026, 09:05 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.