PlanningRegister.ie
Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 22:55

Rock Hill

53.30218, -6.17832

Homes here mostly date from before 1919. 6 planning files on this house, the latest from 2025. Home extensions nearby almost always get approved (96%). 98 homes approved 280 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 6 planning files on this house, the latest from 2025.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 6 planning files on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Rock HillBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2025: V/050/25 · new house, withdrawn or invalid2026: D25A/0483/WEB · demolition, approved2025: D25A/0415/WEB · we fad saoil, approved2025: D24A/0851/WEB · change of use, approved2024: D24A/0836/WEB · change of use, withdrawn or invalid2023: D23A/0159 · change of use, approved2021: 2 files on Rock Hill2022: 2 files on Rock Hill2024: 2 files on Rock Hill2025: 3 files on Rock Hill9 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    V/050/25 · new house · other decision
    approved?started?signed off?
  2. 2026
    D25A/0483/WEB · demolition · approved 2026 · not started, runs out 2031
    approvedstartedsigned off
  3. 2025
    D25A/0415/WEB · we fad saoil · approved 2025 · not started, runs out 2030
    approvedstartedsigned off
  4. 2025
    D24A/0851/WEB · change of use · approved 2025 · not started, runs out 2030
    approvedstartedsigned off
  5. 2024
    D24A/0836/WEB · change of use · withdrawn
    approved?started?signed off?
  6. 2023
    D23A/0159 · change of use · approved 2023 · not started, runs out 2028
    approvedstartedsigned off
On this site
M3
Zoning · Neighbourhood centre
Yes
Protected or listed · a protected building (Former Post Office); in a conservation area (Blackrock Village)
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningM3 · Neighbourhood centre
What it says

Objective DC: DC To protect, provide for and-or improve mixed-use district centre facilities.

A local centre: shops, services and apartments over them, serving the surrounding housing.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningM3 · Neighbourhood centre
What it says

Objective DC: DC To protect, provide for and-or improve mixed-use district centre facilities.

A local centre: shops, services and apartments over them, serving the surrounding housing.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Protected buildingOn this site Former Post Office
Conservation areaOn this site Blackrock Village
Radon1 in 10 homes have high radon (EPA)

Not on this site: heritage inventory, monument zone, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Conservation areas2Blackrock Village; Sydney Avenue, Blackrock
Natural heritage areas1South Dublin Bay
Radon grid squares4
Protected buildings128Blackrock Railway Station; Lios an Uisce
EU nature sites1South Dublin Bay SAC
Monuments2Cross; R149443
EU bird sites1South Dublin Bay and River Tolka Estuary SPA
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), Architectural Conservation Areas, EPA radon map, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Natural Heritage Areas (NPWS), Special Areas of Conservation (NPWS), Sites and Monuments Record, Special Protection Areas (NPWS) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
Special Areas of Conservation (NPWS)CC BY 4.027 Sept 2026, 19:27open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Special Protection Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

This is a protected building: almost any change, inside or out, needs permission.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 94–100% by type. A new house in a garden is harder: 65% approved, and 1 in 5 is asked for more information.

Single-storey rear63 decided · more info asked 8%
100% · council 96%
Two-storey rear34 decided · more info asked 9%
94% · council 92%
Two-storey side10 decided · more info asked 10%
100% · council 95%
Attic or dormer84 decided · more info asked 7%
94% · council 94%
Garage conversion10 decided · more info asked 10%
100% · council 99%
Porch or front10 decided · more info asked 0%
100% · council 98%
New house in a garden or site26 decided · more info asked 19%
65% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 237 nearby, 3,504 council-wide

Figure 3

Rock Hill, file by file since 2021

9 planning files on Rock Hill since 2021, by kind and decision.202120222023202420252026Extensions, atticsPorches, roofs, otherNo. 23 · 2021 · other work · approved · D21A/0729No. 6 · 2021 · other work · approved · D21A/1074No. 6 · 2022 · other work · approved · D22A/0268No. 23 · 2022 · other work · approved · D22A/0751No number · 2024 · other work · approved · D24A/0800/WEBNo. 50 · 2024 · other work · approved · D24A/1000/WEBNo. 30 · 2025 · other work · approved · D25A/0057/WEBNo. 11 · 2025 · other work · approved · D25A/0415/WEBNo. 11 · 2025 · other work · approved · D25A/0483/WEBNew house in a side garden
ApprovedRefusedWithdrawn or invalid

9 files with "Rock Hill" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 3 within 250 m · 1 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

2 approved1 refused
KindAppliedApprovedRefused
Single-storey rear211
First-floor11—

Refused within 100 m 1 in the last 12 months

  • D26A/0130/WEB · single-storey rear extension · refused 16 Apr 2026 · 49 m appeal invalid
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 3

How long, and what if someone objects?

Figure 4

A home extension's journey here

A decision takes 51 days. 1 in 10 is asked for more information, which adds about 60 days. Building starts about 6 months after permission.

Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 10): 110 days; Appeal window: 4 weeks; If appealed: +139 days; Building starts: 180 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 49–54 (n=252)51 daysIf more info asked (1 in 10)With further information: median 110 days (n=29)110 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 139 days (n=72, all appeals within 1.5 km)+139 daysBuilding startsStart notice: median 180 days after permission (n=133)180 days after permissionSigned off356 days after the start, for the few who file. 64% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated281 decided home extensions, 134 start notices, 72 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 5

What appeals changed

11 of 30 appealed refusals became permissions. 5 of 44 appealed approvals were reversed.

Refusals appealed30 decided
11 became permissions
Approvals appealed44 decided
5 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 3 in the last 12 months
  • 501719 Pending · 9-11, Rock Hill, Blackrock, Dublin, A94P5C7 · 9 m
  • 501674 Pending · 5, Mount Merrion Avenue, Blackrock, Dublin, A94W9P2 (Protected… · 413 m
  • 501341 Invalid · 1, Brusna Cottages, Blackrock, Co. Dublin (ACA) · 49 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Courts Service legal diary (judicial reviews)© the publisher30 Oct 2026, 23:12open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 4

What's changing around you?

Street map around Rock Hill with 15 numbered planning items
⌖ the houseOpen for commentsWindow closingApproved, not startedDerelict buildingAppealRefusedBuilding startedApprovedNo decision yet
  1. 1Lands at and between, Carrickmines 220kV Substation D26A/0763/WEBNo decision yet · 178 m
  2. 220 Sweetman's Avenue, Blackrock D26A/0757/WEBNo decision yet · 260 m
  3. 34, Anglesea Avenue D26B/0463/WEBNo decision yet · 488 m
  4. 486 Carysfort Avenue, Blackrock D26A/0612/WEBApproved · 490 m
  5. 5Frascati Centre D21A/0996Approved, no sign building has started · 280 m
  6. 6DERELICT, WAVERLY LODGE DS: 1696Derelict building · 436 m
  7. 79-11, Rock Hill 501719Appeal: no decision yet · 9 m
  8. 81, Brusna Cottages D26A/0130/WEBRefused · 49 m
  9. 97 George's Avenue, Blackrock D25A/0352/WEBBuilding started · 69 m
  10. 1037 Main Street, Blackrock D26A/0345/WEBBuilding started · 141 m
  11. 1140 Main Street, Blackrock D25A/0734Building started · 174 m
  12. 12Tropical Medical Bureau, 3 Bath Place D25A/0898/WEBApproved · 46 m
  13. 13National Mobility Hubs Pilot: Dún Laoghaire-Rathdown, 73 Locations Across the Council's Administrative Area PC/IC/01/26No decision yet · 63 m
  14. 1424, Idrone Terrace D25A/0872/WEBApproved · 91 m
  15. 1515, Idrone Terrace D26A/0214/WEBApproved · 158 m
Figure 6

What happens to applications within 500 m

Permission isn't building. Of 108 permissions since 2016, 42 show a start notice and 11 have a completion certificate.

153 applications lodged within 500 m. Council: 108 approved, 14 refused. After appeals: 108 approved. Of those: 11 signed off, 9 built with the owner's opt-out, 22 started, 64 with no start notice found, 2 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT108: lodged → approved14: lodged → refused20: lodged → withdrawn or invalid11: lodged → undecided105: approved → approved9: refused → refused20: withdrawn or invalid → withdrawn11: undecided → undecided2 approved by the council, undecided after an appeal1 approved by the council, withdrawn or invalid after an appeal3 refused by the council, approved after an appeal1 refused by the council, undecided after an appeal1 refused by the council, withdrawn or invalid after an appeal64: approved → no start notice found9: approved → built, owner opted out22: approved → started, not signed off11: approved → signed off2: approved → ran out153 lodged153 lodged108 approved108 approved14 refused14 refused20 withdrawn or invalid20 withdrawn or invalid11 undecided11 undecided108 approved108 approved9 refused9 refused22 withdrawn22 withdrawn14 undecided14 undecided64 no start notice found64 no start notice found9 built, owner opted out9 built, owner opted out22 started, not signed off22 started, not signed off11 signed off11 signed off2 ran out2 ran out

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured153 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 7

The next 30 days

4 deadlines within 500 m; the first closes 4 Nov 2026.

4 deadlines in the next 30 days: 2026-11-04 D26A/0612/WEB: GRANT PERMISSION & GRANT RETENTION — The development will consists of: revise permitted development approved under P; 2026-11-09 D26B/0463/WEB: REQUEST ADDITIONAL INFORMATION — The development will consist of the construction of a single storey extension t; 2026-11-13 D26A/0757/WEB: application received — The proposed development will consist of: • Construction of a first floor extens; 2026-11-16 D26A/0763/WEB: application received — The development will consist of the provision of: a c. 7.03km underground cabletoday5 Nov10 Nov15 Nov20 Nov25 Nov30 NovD26A/0612/WEB: GRANT PERMISSION & GRANT RETENTION — The development will consists of: revise permitted development approved under P · 490 m away · 2026-11-04D26B/0463/WEB: REQUEST ADDITIONAL INFORMATION — The development will consist of the construction of a single storey extension t · 488 m away · 2026-11-09D26A/0757/WEB: application received — The proposed development will consist of: • Construction of a first floor extens · 260 m away · 2026-11-13D26A/0763/WEB: application received — The development will consist of the provision of: a c. 7.03km underground cable · 178 m away · 2026-11-16
Comments closeTime to appeal ends
  • Time to appeal ends 4 Nov 20264 days left
    4D26A/0612/WEB · GRANT PERMISSION & GRANT RETENTION — The development will consists of: revise permitted development approved under P
    €220 to An Coimisiún Pleanála (€110 observer) · 490 m away
  • Time to appeal ends 9 Nov 20269 days left
    3D26B/0463/WEB · REQUEST ADDITIONAL INFORMATION — The development will consist of the construction of a single storey extension t
    €220 to An Coimisiún Pleanála (€110 observer) · 488 m away
  • Comments close 13 Nov 202613 days left
    2D26A/0757/WEB · application received — The proposed development will consist of: • Construction of a first floor extens
    €20 to the council · 260 m away
  • Comments close 16 Nov 202616 days left
    1D26A/0763/WEB · application received — The development will consist of the provision of: a c. 7.03km underground cable
    €20 to the council · 178 m away

Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

Figure 8

Approved, stalled or planned, not built yet

98 homes 280 m away were approved May 2023 with no start notice yet; the permission runs to May 2028. BusConnects Core Bus Corridors is planned 182 m away.

Frascati Centre · 98 homes: 98 homes approved May 2023, not started; BusConnects Core Bus…: core bus corridor (DLR County Development Plan 2022-2028)2023202420252026202720282029Frascati Centre · 98 homes280 m · D21A/099698 homes approved May 2023, not started98 homes approved May 2023, not startedBusConnects Core Bus…182 m · plannedcore bus corridor (DLR County Development Plan 2022-2028)today

Each row is a dated fact from a public register: no score and no forecast.

Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

Sites that could change 2 within 500 m

Derelict building 1

  • 6DERELICT, WAVERLY LODGE · listed as derelict · 436 m

Approved, not started 1

Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
Council meetings (ModernGov)Public31 Oct 2026, 02:21open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Figure 9

Applications within 500 m, by year

Between 20 and 34 a year; busiest 2025. 89% of decisions were approvals.

2021: 29, 2022: 20, 2023: 22, 2024: 28, 2025: 34, 2026: 200102030402021: 23 approved2021: 4 refused2021: 1 withdrawn or invalid2021: 1 undecided29’21*2022: 15 approved2022: 2 refused2022: 1 withdrawn or invalid2022: 2 undecided20’222023: 21 approved2023: 1 undecided22’232024: 17 approved2024: 3 refused2024: 7 withdrawn or invalid2024: 1 undecided28’242025: 24 approved2025: 4 refused2025: 6 withdrawn or invalid34’252026: 8 approved2026: 1 refused2026: 5 withdrawn or invalid2026: 6 undecided20’26*
ApprovedRefusedWithdrawn or invalidUndecided

2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

Measuredcouncil register via NPAD

Open for comments €20 to comment

Every application within 500 m 30 in the last 12 months

See every application on the map

How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Building work nearby 14 in the last 12 months
3 signed off as finished8 not signed off3 no sign-off needed
  • Normal Unit No. D2, Frascati Centre, Frascati Road, Blackrock, Dublin, A94 Y2W6 · 26 Oct 2026 · 7-day notice not signed off · P/1560/26 · 279 m
  • Frascati Shopping Centre, Frascati Road, Blackrock, Dublin · 24 Sept 2026 · 7-day notice not signed off · D25A/0073/WEB · 292 m
  • 1037 Main Street, Blackrock, Dublin, A94 X0P4 · 3 Sept 2026 · 7-day notice not signed off · D26A/0345/WEB · 141 m
  • 7 Maretimo Gardens West, Blackrock, Dublin, A94 F7H7 · 19 Aug 2026 · 7-day notice not signed off · D24A/0258 · 401 m
  • 1140 Main Street, Blackrock, Dublin, A94 P2C9 · 24 Jul 2026 · 3 homes · start notice not signed off · D25A/0734 · 174 m
  • 97 George's Avenue, Blackrock, Dublin · 21 Jul 2026 · 7-day notice not signed off · D25A/0352/WEB · 69 m
  • Blackrock Shopping Centre, Rock Hill, Blackrock, Co. Dublin, Blackrock, Dún Laoghaire-Rathdown, A94 C2N7 · 13 Apr 2026 · short notice no sign-off needed · D24A/0800/WEB · 58 m
  • 14 Idrone Lane, Blackrock, Dún Laoghaire-Rathdown, A94 ED35 · 12 Mar 2026 · 1 homes · 7-day notice not signed off · SI75 EXEMPT. SA/60058 · 84 m
  • 20 Idrone Terrace, Blackrock, Dún Laoghaire-Rathdown, A94 NN93 · 4 Feb 2026 · 1 homes · short notice no sign-off needed · D25A/0291/WEB · 126 m
  • 21A Sydney Avenue, Dublin, Dún Laoghaire-Rathdown, A94 EW74 · 28 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0144/WEB · 498 m
  • Unit G01 Frascati SC Blackrock, Dublin, Dun Laoghaire Rathdwon, Dublin, Dún Laoghaire-Rathdown, A94 V0T0 · 22 Jan 2026 · start notice signed off · D24A/0262/WEB · 209 m
  • Unit D3, Frascati SC, Blackrock, Dublin, Dun Laoghaire Rathdown, Dublin, Dún Laoghaire-Rathdown, A94 V0T0 · 5 Jan 2026 · start notice signed off · 21A/0468 · 209 m
  • Unit 3 /6 Rock Hill Blackrock Village Centre, Blackrock village, Dún Laoghaire-Rathdown, A94 TK22 · 18 Dec 2025 · 7-day notice not signed off · D22A/0268 · 110 m
  • Unit G29 Frascati SC Blackrock, Dublin, Dunlaoghaire Rathdown, Dublin, Dún Laoghaire-Rathdown, A94 Y2W6 · 3 Dec 2025 · start notice signed off · 232 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Homes coming 98 not started
How we work this out
Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
Named places nearby: estate, schemes, crèches, schools

Named places estate, developments, inspections

Developments within 1.0 km

SchemeHomesProgressDistance
Frascati Centre3939 not started (2026-Q2)207 m
4.56 ha at St. Teresa's House and St. Teresa's Lodge291291 not started (2026-Q2)498 m
Temple Hill and Temple Road——499 m
3.9 ha at ‘St. Teresa’s House’ and ‘St. Teresa’s Lodge’ Temp——499 m
Merrion at——698 m
Chesterfield——698 m
Merrion——698 m
Cross Avenue246246 built (2025-Q1)799 m

Crèches and schools inspected

NameLatest inspectionDistance
Blackrock Community Playgroup · Crèche7 Dec 2023 · report · Tusla Early Years Inspectorate194 m
Little Apples Academy · Crèche25 Aug 2025 · report · Tusla Early Years Inspectorate225 m
Coco's Creche & Montessori · Crèche15 May 2026 · report · Tusla Early Years Inspectorate631 m
How we work this out
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
Tusla early years registerPublic register28 Oct 2026, 23:19open
How busy is this area About as busy as most of Dún Laoghaire-Rathdown County Council.
Homes approved
Here498
Council middle44
Homes started
Here82
Council middle92
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 5

What's the area like?

Figure 10

This street block against the council

74% of homes built before 1971 (council 38%). 41% owner-occupied (council 68%).

Homes built before 1971
74% · council 38%
Homes built since 2001
2% · council 25%
Owner-occupied
41% · council 68%
Rented
48% · council 29%
Children under 15
10% · council 18%
Aged 65 and over
20% · council 17%
Households with 2+ cars
19% · council 39%
Work mainly from home
16% · council 19%
This small area (177 people)Dún Laoghaire-Rathdown

MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267021013/267026008

Rail noise
60–64 dB
day–night average (EPA 2022)
Bus
21 m
Blackrock Main St · 7, 7A, 7n · busiest stop within 500 m: 14 an hour at peak
Planned
182 m
BusConnects Core Bus Corridors, Merrion to Blackrock
Radon
1 in 10
homes here likely high (EPA). Test it
Flood
Within 500 m
OPW flood map area, not beside the house
Nearest school
386 m
Benincasa Special School, 35 pupils
Homes sold nearby
30
in 3 years, 1 new (Property Price Register)
Schools, stops and the council

Schools

  • Benincasa Special School · primary · 35 pupils · 386 m
  • Carysfort Ns · primary · 583 pupils · 647 m
  • Dominican College · postprimary · 521 pupils · 760 m
  • Blackrock College · postprimary · 1041 pupils · 818 m
  • Booterstown NS · primary · 85 pupils · 865 m

Stops 30

  • Blackrock Main St · 7, 7A, 7n, 84n, L26, S6 · 10/hour at peak · 21 m
  • Blackrock Station · 114, L26, S6 · 7/hour at peak · 34 m
  • Blackrock · DART, Dublin - Drogheda/Dundalk, Dublin - Europort, Dublin - Maynooth · 14/hour at peak · 69 m
  • Patrick's Row · 7A · 2/hour at peak · 179 m
  • Frascati SC · 4, 702 · 4/hour at peak · 180 m
  • Frascati Road · 114, L26, S6 · 7/hour at peak · 193 m
  • Frascati SC · 4, 7, 702, 7A, 7E, S6 · 14/hour at peak · 209 m
  • Blackrock Park · 7, 7A, 7n, 84n, S6 · 8/hour at peak · 253 m

Schools growing or shrinking planning in 3 years · pupils last year

  • Benincasa Special School · 386 m-16.7% pupils (35)
  • Carysfort Ns · 647 m-0.9% pupils (583)
  • Dominican College · 760 m+2.6% pupils (521) · 3 classrooms 2025, approved with conditions · an extension 2024, approved
  • Blackrock College · 818 m-1.1% pupils (1,041) · an extension 2024, approved
  • Booterstown NS · 865 m-7.6% pupils (85)

Council meetings 3 items

Public land

  • Dún Laoghaire-Rathdown County Council · 0.16 ha · 18 m
  • Dún Laoghaire-Rathdown County Council · 0.25 ha · 177 m
  • Dún Laoghaire-Rathdown County Council · 0.27 ha · 193 m
  • Dún Laoghaire-Rathdown County Council · 0.2 ha · 198 m
  • The Office of Public Works · 0.11 ha · 243 m
  • An Post · 0.17 ha · 403 m
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Council consultation portalsPublic31 Oct 2026, 01:06open
Council meetings (ModernGov)Public31 Oct 2026, 02:21open
Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
cso_saps_2022CC BY 4.0—open
National Transport AuthorityCC BY 4.0——
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
EPA strategic noise mapsCC BY 4.0——
Fingal County CouncilCC BY 4.0——
Question 6

What to ask, and who

  1. Demolition (D25A/0483/WEB) approved 2026, not started: still planned?
    Ask for: The grant, and whether it stays with the house.
    Seller · solicitor
  2. We fad saoil (D25A/0415/WEB) approved 2025, not started: still planned?
    Ask for: The grant, and whether it stays with the house.
    Seller · solicitor
  3. Change of use (D24A/0851/WEB) approved 2025, not started: still planned?
    Ask for: The grant, and whether it stays with the house.
    Seller · solicitor
  4. Protected building: what changes would you be allowed?
    Ask for: A section 57 declaration from the council.
    Council
  5. In a conservation area: which outside changes need permission?
    Ask for: The council's guidance for the area.
    Council
  6. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.
    Seller · solicitor
Reference

Where this is, the terms, the sources

Townland
Blackrock
Electoral division
Blackrock-Central
Electoral area
Blackrock
Council
Dun Laoghaire-Rathdown County Council
Everything we found, as a list 8 lines
  • 6 applications on this site; latest V/050/25, other decision.
  • Zoned M3 (neighbourhood centre); protected building; in a conservation area; no vacant land tax; high radon area.
  • 2 sites nearby could change: 1 derelict, 1 approved scheme.
  • 2 applications open for comments nearby; nearest closes 16 Nov 2026.
  • 1 application refused within 100 m since 2025; latest a single-storey rear extension (2026).
  • 98 homes approved nearby, not started; largest 98 at Frascati Centre.
  • Frascati SC (bus 4, 7) 209 m away: 14 an hour at morning peak; 96 from all stops within 500 m. Planned: BusConnects Core Bus Corridors 182 m away, core bus corridor (DLR County Development Plan 2022-2028).
  • Noise from rail mapped at 60–64 dB (day-evening-night average, EPA 2022).
What the terms mean 10 terms
  • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
  • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
  • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
  • Approved (Grant of permission): The council said yes, usually with conditions.
  • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
  • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
  • Conservation area (Architectural Conservation Area (ACA)): A street or area whose character is protected.
  • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
  • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
  • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 35
SourcePublisherLicenceFetched
EPA strategic noise maps—CC BY 4.0—
Fingal County Council—CC BY 4.0—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
National Transport Authority—CC BY 4.0—
services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
www2.courts.ie—© the publisher30 Oct 2026
cso.ie—CC BY 4.0—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
esbnetworks.ie—© the publisher · flag only11 Sept 2026
transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
lda.ieLand Development AgencyCC BY 4.011 Sept 2026
meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
gov.ieDepartment of EducationCC BY 4.027 Oct 2026
gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
Measured
counted from a public register
Calculated
a rate or median we worked out from those counts
Our classification
we sorted it by reading each description
Estimate
inferred from another source (census, map data)
Rule summary
the law, simplified: check before relying on it
How we work this out
Generated 31 Oct 2026, 22:55 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.