About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels
Retention of existing timber fence to the front, and two internal boundary walls within the front and side garden, each incorporating a pedestrian gate. Retention of pitched-roof shed to the rear of the property. Permission for a new front vehicular access with dropped kerb, including partial removal of the existing front boundary wall. Infill of existing open-walled front porch to provide new front entrance door.
SD25B/0638Wreceived 7 Nov 2025decided 12 Jan 2026476 m away
Demolition of an existing electrical switch room, boiler rooms and existing single storey office building and two associated modern extensions at the rear of the existing Coach House and Stables Buildings; Works to the Coach House and Stables Buildings (currently in office use) include the removal of existing modern interventions (internally & externally) and to restore the buildings to their earlier character when used as stables and coach house; Works include replacement of modern windows and doors with historically accurate ones, lime rendering of external walls, replacement of concrete roof tiles with natural slate and of modern gutters and downpipes; Some modern wall opes will be closed as blind windows; Internally, modern office layouts will be removed and replaced with earlier stables and loft layouts; The change of use of the buildings from office to exhibition/display spaces; Works to the derelict Gardener's Cottage will include its reconstruction based on photographic evidence to reflect its earlier appearance, while the modern windows and door will be removed from the adjacent Cart House to return it to its earlier form, all for use as exhibition/display spaces; Works to the existing two storey Finance Building include altering its south-eastern fa9ade to align with a new courtyard dividing wall, replacing the existing facade with a new glazing system along with solid elements of render, stone & zinc cladding; The internal layout will be reordered to change the use of the ground floor from office to exhibition spaces with retained office and meeting spaces on the 1st floor in a revised layout; A new plant area enclosure with PV array at roof level; The ancillary building to its west will be redeveloped to include a kitchen area on the ground floor and WC facilities at first floor level with new areas of roof and wall in zinc cladding; An existing single storey storage building will be redeveloped and extended for use as a staff office with meeting room, kitchenette, storage room, and WC spaces; A new exhibition building (Machinery Shed) will be constructed, south of the Coach House, white forming a new courtyard between the two buildings; This two-storey pitched roof building will house refurbished antique farm machinery in an exhibition of early farm equipment; The first-floor mezzanine will contain an audio-visual display area and open landings overlooking the ground floor exhibition space; The building will have a PV array at roof level; This building and adjacent landscaped areas will replace an existing car park area of 35 spaces; A new substation, switch room building with back-up generator enclosure will also be constructed as part of the works; All associated site works, plant spaces, civil and utility works and landscaping form part of the application; Belgard Castle is a Protected Structure Ref. 206 and a Recorded Monument - Ref. SMR DU021-026.
SD23A/0061received 24 Aug 2023decided 20 Sept 202335 m away
Removal of the three existing grounds keeping sheds and a portacabin unit and replacement of these with a new single building facility in the same location to contain all staff and storage requirements for the groundskeeping and maintenance of the Belgard Castle Estate; The proposed building is 795sq.m in area and consists of areas for storage of machinery ground maintenance equipment, general storerooms and a mechanical and electrical plant room; A part mezzanine floor will provide for additional storage space at first floor; Staff facilities to be provided include for an office area, a canteen, changing/locker rooms with toilets and showers; Externally there will a vehicle and equipment wash area, general hardstanding and staff car parking; Associated civil works include connections to a rainwater storage and connection to a RW soakaway, and a connection to the existing mains for foul water services; The building will be clad in green corrugated sheeting, while burnt timber sheeting will clad the staff area, which will also have a sedum green room. A roof mounted PV array, heat pump technology, rainwater storage and all associated site works also form part of the application; Belgard Castle is a protected structure Ref 206, and a recorded monument - reference SMR DU021-026
SD23A/0036received 27 Jun 2023decided 24 Jul 2023116 m away
The erection of a replacement glasshouse superstructure onto an existing masonry base. Formation of pad footings for the glasshouse support frame. Associated electrical, plumbing & rainwater drainage works associated with the glasshouse.
ED23/0007received 28 Feb 2023decided 23 Mar 20230 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
8 EXCHANGE HALL, THE EXCHANGE, BELGARD SQ NORTH DUBLIN 24
19 Jun 2024
€225,000
—
—
—
—
—
—
277 m
224 THE AVENUE, BELGARD HEIGHTS, DUBLIN 24
30 May 2024
€322,000
—
—
—
—
—
—
499 m
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
No publishable utility-capacity record within the radius. 2 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 15 Sept 2026, 00:55 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.