What closes soonest 1 open window
Observations close 25 Sept 202611 days left
SD26A/0202W — application received — Construction of a single storey ground floor detached auxiliary dwelling with one bedroom a kitchen a living room and ba
5 weeks from receipt (21 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 919 m away
An OPW flood extent intersects this area. The OPW's map is licensed CC-BY-NC-ND, so we show a flag only — see the extent at floodinfo.ie.
Designation
Count
Examples
NIAH-recorded building
8
Mooreen House; Belgard Cottage; Belgard Castle
Radon risk area
4
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels
Construction of a single storey ground floor detached auxiliary dwelling with one bedroom a kitchen a living room and bathroom in the rear garden of the principal house together with connection to all public services and all associated site development works.
New pedestrian side access gate to the rear garden and the construction of a single-storey mono-pitch front porch extension with relocation of the existing front entrance door.
SD26B/0305Wreceived 19 Jun 2026decided 7 Aug 2026827 m away
Retention of existing timber fence to the front, and two internal boundary walls within the front and side garden, each incorporating a pedestrian gate. Retention of pitched-roof shed to the rear of the property. Permission for a new front vehicular access with dropped kerb, including partial removal of the existing front boundary wall. Infill of existing open-walled front porch to provide new front entrance door.
SD25B/0638Wreceived 7 Nov 2025decided 12 Jan 2026634 m away
The proposed development will consist of: Changes to existing hotel signage with the erection of 6no. signs and all other associated site development works. Sign No.1 (4.5m x 1.5m) is a high level sign to replace the existing sign on the northern elevation. Sign No.2 (4.1m x 1.4m) is a high level sign to replace existing on the southern elevation. Sign No.3 (4.5m x 1.5m) is a high level sign to replace existing on the western elevation. Sign No.4 (3.9m x 0.3m) is a low level sign above the main entrance of hotel to replace existing. Sign No.5 comprises 2no. new circular panel signs (600mm x 600mm each), either side of the main hotel entrance. All signs are to be internally illuminated by means of LEDs, giving face illumination only.
SD25A/0224Wreceived 18 Sept 2025decided 11 Nov 2025957 m away
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
SD25B/0507Wreceived 22 Aug 2025decided 16 Oct 2025933 m away
The proposed development will consist of: Changes to existing hotel signage with the erection of 6no. signs and all other associated site development works. Sign No.1 (6.1m x 2.1m) is a high level sign to replace the existing sign on the northern elevation. Sign No.2 (4.6m x 2.1m) is a high level sign to replace existing on the southern elevation. Sign No.3 (5.3m x 2.2m) is a high level sign to replace existing on the western elevation. Sign No.4 (3.9m x 0.3m) is a low level sign above the main entrance of hotel to replace existing. Sign No.5 comprises 2no. new circular panel signs (600mm x 600mm each), either side of the main hotel entrance. All signs are to be internally illuminated by means of LEDs, giving face illumination only.
SD25A/0092Wreceived 17 Apr 2025decided 11 Jun 2025957 m away
for the construction of first floor side extension over previously converted garage, construction of new dormer structure to the rear and conversion of attic space to home office and a games room . Works at first floor will consist of construction of bedroom with en-suite and associated works.
SD24B/0582Wreceived 20 Dec 2024decided 20 Feb 2025906 m away
The construction of a two storey, mixed use, development consisting of a public house at ground floor level with a gross floor area of 359sqms. The public house includes internal bin storage and other ancillary rooms.
The construction of 4 residential apartments (Gross floor area 374sqms) at first floor consisting of 2no. one bed units; 1no. two bed unit; and, 1no. 3 bed unit. All apartments have private space in the form of balconies with a common area at first floor for access to each apartment with access to this common area off the internal entrance lobby; internal, residential, bike storage room and bin storage room at ground floor level.
The proposed development includes communal amenity spaces located to the west of the block and at first floor level; parking of 8 spaces including 1 no mobility space, 2 electric vehicle spaces and is accessed via a new vehicle entrance from the Old Belgard Road.
New boundary treatments proposed along with a drop off area and wider soft and hard landscaping including a plaza area which ties into the public footpath on the Old Belgard Road; external bike parking areas within these external spaces; and, a connecting footpath to the established local centre to the north. Associated mechanical plant, PV panels at roof level, groundworks, landscaping, drainage including SUDS measures, lighting, engineering and ancillary works necessary to facilitate the development.
SD24A/0155Wreceived 3 Dec 2024decided 18 Dec 20244 units769 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
No publishable utility-capacity record within the radius. 12 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Dublin City Council — Dublin city and suburbs
0.66 hafolio DN61092F355 m awayas of 1 Jul 2023
Dublin City Council — Dublin city and suburbs
0.52 hafolio DN9417F413 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.55 hafolio DN176373F413 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.19 hafolio DN36863F455 m awayas of 1 Jul 2023
Dublin City Council — Dublin city and suburbs
0.5 hafolio DN18547N612 m awayas of 1 Jul 2023
Dublin City Council — Dublin city and suburbs
0.37 hafolio DN4105N638 m awayas of 1 Jul 2023
South Dublin County Council — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 14 Sept 2026, 17:23 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.