What closes soonest 1 open window
Observations close 16 Sept 20263 days left
SD26B/0370W — application received — Conversion of existing attic space comprising of modification of existing roof structure; new access stairs; two roof wi
5 weeks from receipt (12 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 343 m away
R2 — Existing residentialsouth dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028
RES: To protect and/or improve residential amenity
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
An OPW flood extent intersects this area. The OPW's map is licensed CC-BY-NC-ND, so we show a flag only — see the extent at floodinfo.ie.
Designation
Count
Examples
NIAH-recorded building
1
Catholic Church of the Holy Spirit
Radon risk area
4
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels
This site is on an RZLT map — the draft map 2027 and the final map 2026 (0.6 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs; two roof windows to the front and flat roof dormer to the rear.
Demolition of existing garage and outbuilding. Erection of a single storey extension to the front and two storey extension to the side and rear of the existing house to include: Kitchen / dining / living room, utility room, home office at ground floor; enlarged bedrooms and additional bathroom at first floor and a new bedroom in the roof space. There will be roof windows to the front and rear.
SD26B/0111Wreceived 16 Mar 2026decided 11 May 2026465 m away
Fit out of attic for bedroom, office and ensuite. 4No. new windows to existing dwelling, 1no. window to the front gable, 1No. new rooflight on front roof, 1no. window to side gable and new rooflight to rear.
SD26B/0034Wreceived 27 Jan 2026decided 19 Mar 2026188 m away
Raise the side gable wall to facilitate an attic conversion with dormer window to front, along with a ground floor porch extension at the front, demolition of greenhouse to side & removal of store room & part kitchen to the side/rear & all associated works.
SD26B/0023Wreceived 22 Jan 2026decided 9 Mar 2026444 m away
Demolition of existing garage and outbuilding. Erection of a single storey extension to the front and two storey extension to the side and rear of the existing house to include: Kitchen / dining / living room, utility room, home office at ground floor; enlarged bedrooms and additional bathroom at first floor and a new bedroom in the roof space. There will be roof windows to the side and rear.
SD26B/0010Wreceived 15 Jan 2026decided 20 Jan 2026465 m away
Proposal to plant a hedge (Prunus lusitanica Portuguese laurel), within the border of our front garden, to enclose a green space and separate the garden area/lawn which is closest to the front of the house from the car parking area further from the house.
ED25/0110received 28 Nov 2025decided 10 Dec 2025106 m away
Synthetic Grass Sports Pitch
The proposals are: The construction of a synthetic grass 3G all-weather sports pitch. Perimeter fencing and ball stop fencing at rear of each goal. 6 no. floodlighting columns. A single storey pavilion building consisting of two individual team changing rooms, club storage area and ancillary facilities. All associated ancillary works in adjacent areas including but not limited to foul & surface water drainage and utility supplies. Realignment of existing footpath over a length of 112 metres. All related hard and soft landscape works including connecting footpaths and associated planting. Storage Areas. CCTV.
PT8SD292received 17 Sept 2025147 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 15 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 05:36 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.