Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.
What closes soonest 1 open window
Observations close 16 Sept 20264 days left
SD26B/0370W — application received — Conversion of existing attic space comprising of modification of existing roof structure; new access stairs; two roof wi
5 weeks from receipt (12 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 313 m away
R2 — Existing residentialsouth dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028
RES: To protect and/or improve residential amenity
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels
This site is on an RZLT map — the draft map 2027 and the final map 2026 (0.6 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs; two roof windows to the front and flat roof dormer to the rear.
Demolition of existing garage and outbuilding. Erection of a single storey extension to the front and two storey extension to the side and rear of the existing house to include: Kitchen / dining / living room, utility room, home office at ground floor; enlarged bedrooms and additional bathroom at first floor and a new bedroom in the roof space. There will be roof windows to the front and rear.
SD26B/0111Wreceived 16 Mar 2026decided 11 May 2026437 m away
Fit out of attic for bedroom, office and ensuite. 4No. new windows to existing dwelling, 1no. window to the front gable, 1No. new rooflight on front roof, 1no. window to side gable and new rooflight to rear.
SD26B/0034Wreceived 27 Jan 2026decided 19 Mar 2026189 m away
Raise the side gable wall to facilitate an attic conversion with dormer window to front, along with a ground floor porch extension at the front, demolition of greenhouse to side & removal of store room & part kitchen to the side/rear & all associated works.
SD26B/0023Wreceived 22 Jan 2026decided 9 Mar 2026421 m away
Demolition of existing garage and outbuilding. Erection of a single storey extension to the front and two storey extension to the side and rear of the existing house to include: Kitchen / dining / living room, utility room, home office at ground floor; enlarged bedrooms and additional bathroom at first floor and a new bedroom in the roof space. There will be roof windows to the side and rear.
SD26B/0010Wreceived 15 Jan 2026decided 20 Jan 2026437 m away
Proposal to plant a hedge (Prunus lusitanica Portuguese laurel), within the border of our front garden, to enclose a green space and separate the garden area/lawn which is closest to the front of the house from the car parking area further from the house.
ED25/0110received 28 Nov 2025decided 10 Dec 2025132 m away
The development shall consist of the phased partial demolition, reconstruction and extension of the existing Bakery Production and distribution complex at their expanded site in Greenhills Industrial Estate. The overall development shall consist of a number of consecutive phases designed and implemented to ensure the maintenance of the ongoing operations of the facility namely: 1) Area 1 a. Demolition of the existing Varian brushes building which forms part of the expanded site. b. Creation external staff parking area constructed the North Eastern End of the site along with a new Public footpath and cycleway constructed around the Northern Boundary and providing access from St James Road into and through Greenhills Industrial estate. c. New Boundary wall formed with a brickwork wall with piers and Steel fence to match existing. d. Van Loading Building measuring 3082m2 on plan with a height of circa 5m at eaves level. The building shall be formed with a curved green roof with Solar panels and a step at the external elevation to reduce massing to the surrounding properties. The building shall be externally clad with Insulated Microrib panel which shall be augmented on the Southern and South Eastern elevations with Acoustic protection to minimise the operational noise at the boundary. 2) Area 2 a. Demolition of the existing centrally located two storey Office & Welfare accommodation and Van loading canopies. b. Construction of new Welfare Accommodation housing the Staff facilities including Staff Entrance, bike parking, Changing areas, toilets, canteen and office. Facility shall be formed in a Two storey concrete building clad with rendered blockwork to a parapet level and punctuated with windows along the Northern elevation. The footprint shall measure 829m2 and the overall height to parapet shall be 11m2. The roof shall house a mixture of green roof and solar panels. c. Reroofing and expansion of existing Packing operations to the South and adjoining the New Welfare Accommodation. Construction shall be of Structural Steel lattice girders supporting a mixture of Trapezoidal Insulated roof panels and built up insulated roof system. The Southern wall shall be externally clad with Insulated Microrib panel which shall be augmented on the Southern and South Eastern elevations with Acoustic protection to minimise the operational noise at the boundary. The extended Packing area shall measure 1273m2 on plan with a general height above floor level of 10.5m. 3) Area 3 a. Construction of new Bakery Facility on the site of the existing Car Park and loading area at the North Western edge of the site, directly adjoining the existing facility. The bakery shall measure 3007m2 and shall be 11m high at the boundary stepping up to 14m on the Bakery proper and 18m on the North Western Corner. The facility shall be completed with a mixture of rendered blockwork and brick work panels with high level windows into the Production area. The bakery shall be constructed of Structural Steel lattice girders supporting Trapezoidal Insulated roof panels solar panels. b. Demolition of the existing services area at the Western boundary. c. A three storey Plant and Process Area shall be constructed on the Western elevation and shall be constructed in a Concrete frame and clad with insulated Cavity walls finished with a mixture of Brick and Plastered blockwork external Elevations. The construction shall be completed with a tower structure in the North Western Corner. Roof Construction shall be an insulated built up system supported from a precast concrete superstructure. d. Reroofing of the existing batch and Multiplant Bakery areas to the South and adjoining the New Bakery. The existing low double pitch roofs shall be removed and a new higher Structural Steel lattice girder structure supporting a mixture of Trapezoidal Insulated roof panels and built up insulated roof system installed along with Solar Panels. e. Reroofing and regeneration of the existing Pan Plant located on the Southern boundary to consist of the replacement of the existing external envelope of the building. 4) Area 4 a. Demolition of the existing Administration office and Silo Enclosure. b. Construction of a new three Storey Office block with ground floor covered car parking. The building shall be completed in a concrete frame and precast concrete floors. The facility shall be completed with a mixture of rendered blockwork and brick work panels with strip windows to the Western elevation. c. Realignment of the existing Flour Silos and the installation of four additional silos which hall shall be contained within a Micro rib clad steel Enclosure for visual purposes. d. Alterations to existing boundary and the creation of a new car park and Intake Vehicle unloading area including the relocation of the existing entrance gates and the addition of a new gateway specifically for the office area. e. Redefinition of the existing boundary treatments and improvements to the existing internal estate footpath network with increased definition of cyclist facilities and road separation. Improved lighting installations to the environs of the development and adjoining areas. f. Installation of Sustainable surface water drainage and retention systems to all upgraded areas.
SD25A/0139Wreceived 19 Nov 2025decided 8 Dec 2025498 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 14 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 00:59 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.