- Concrete Pumping Ltd, Greenhills Road, Walkinstown, Dublin 12 Referral
(1) Demolition of all existing industrial and warehouse structures on site (579.1 sq.m) and associated site clearance works; (2) Construction of part 6, part 7, part 10 storey over basement mixed use block providing 99 no. apartments, comprising 49 no. one-bed units and 50 no. two-bed units, with balconies on all elevations; (3) Provision of a commercial unit (148.2sqm) fronting onto Greenhills Road at ground floor level along with a designated set down area/loading bay; (4) Provision of 87.2 sq.m of designated indoor residential amenity space at the ground floor level; (5) Provision of 1,127 sq.m of Communal Open Space to the rear of the site; (6) An access ramp to facilitate vehicular access to the basement car park which will provide 38 no. car parking spaces; A further 2 no. accessible car parking spaces are provided at ground level, resulting in a total of 40 no car parking spaces; (7) A total of 204 no. bicycle parking spaces (comprising 150 no. long stay and 54 no. short stay) at ground and basement level; (8) Provision of 68m of footpath along the Greenhills Road frontage, and a pedestrian crossing across the Greenhills Road; (9) All enabling and associated site development and works including landscaping, footpaths, boundary treatments, lighting, water and utility services and connections, bin stores, plant and all ancillary development and works above and below ground.
SD26A/0184Wreceived 28 Jul 2026393 m away
- 2, Tibradden Close, Walkinstown, Dublin 12, D12 X82F Grant permission
Widening of vehicular entrance from 2.7m to 5m wide, remove grass verge on public footpath and dish accordingly.
SD26B/0182received 24 Jun 2026decided 16 Jul 2026489 m away
- 64, St. Columbas Rd, Greenhills, Dublin 12, D12 X2Y7 Grant permission
Conversion of existing attic space to become habitable space and erection of a dormer to rear and all associated site works to facilitate same.
SD26B/0179Wreceived 17 Apr 2026decided 8 Jun 2026360 m away
- 10, Wilkins View, Limekilnfarm, Dublin 12, D12 ET02 Grant permission
Fit out of attic for bedroom, office and ensuite. 4No. new windows to existing dwelling, 1no. window to the front gable, 1No. new rooflight on front roof, 1no. window to side gable and new rooflight to rear.
SD26B/0034Wreceived 27 Jan 2026decided 19 Mar 2026425 m away
- 24, Limekiln Green, Dublin 12, D12 C2N0 Grant permission
The development seeking permission will consist of the widening the existing vehicular entrance at the front of the property to 3.5m in width.
SD25B/0707Wreceived 18 Dec 2025decided 17 Feb 2026464 m away
- Unit 10, Greenhills Industrial Estate, Greenhills Road, Walkinstown, Dublin 12, D12 HY24 Grant permission
The development shall consist of the Demolition of the existing centrally located Single Storey industrial unit and ancillary offices housing the operations of AE Doors and the construction of a new three-storey Office and Welfare block housing the Staff facilities including Staff Entrance, bike parking, changing areas, toilets, canteen and office facilities. The development shall be formed in a three-storey steel and precast concrete structure clad with rendered blockwork to a parapet level and punctuated with Vertical Strip fenestration on the North and West Elevation with a full elevation of curtain walling on the North West Elevation incorporating vertical brise soleil. Ground floor shall house the Welfare facilities with two storeys of office above. Each floor shall measure 745 sqm giving an overall building floor area of 2,235 sqm. The overall height to parapet shall be 12m, giving a level of 67.59m OD. The roof shall support an extensive green roof. Some local car and bike parking shall be provided however the majority shall be housed with the wider Brennans site. A new boundary wall shall define the site and shall be set back to improve the footpath width. Local Landscaping shall be installed within the boundary incorporating the maximum permissible Suds infrastructure.
SD25A/0299Wreceived 8 Dec 2025decided 9 Feb 2026423 m away
- 5, Temple Manor Close, Greenhills, Dublin 12, D12EV12 Declared exempt
Proposal to plant a hedge (Prunus lusitanica Portuguese laurel), within the border of our front garden, to enclose a green space and separate the garden area/lawn which is closest to the front of the house from the car parking area further from the house.
ED25/0110received 28 Nov 2025decided 10 Dec 2025309 m away
- Brennans Bakeries, Greenhills Industrial Estate, Greenhills Road, Walkinstown, Dublin 12, D12 XR92. Grant permission
The development shall consist of the phased partial demolition, reconstruction and extension of the existing Bakery Production and distribution complex at their expanded site in Greenhills Industrial Estate. The overall development shall consist of a number of consecutive phases designed and implemented to ensure the maintenance of the ongoing operations of the facility namely: 1) Area 1 a. Demolition of the existing Varian brushes building which forms part of the expanded site. b. Creation external staff parking area constructed the North Eastern End of the site along with a new Public footpath and cycleway constructed around the Northern Boundary and providing access from St James Road into and through Greenhills Industrial estate. c. New Boundary wall formed with a brickwork wall with piers and Steel fence to match existing. d. Van Loading Building measuring 3082m2 on plan with a height of circa 5m at eaves level. The building shall be formed with a curved green roof with Solar panels and a step at the external elevation to reduce massing to the surrounding properties. The building shall be externally clad with Insulated Microrib panel which shall be augmented on the Southern and South Eastern elevations with Acoustic protection to minimise the operational noise at the boundary. 2) Area 2 a. Demolition of the existing centrally located two storey Office & Welfare accommodation and Van loading canopies. b. Construction of new Welfare Accommodation housing the Staff facilities including Staff Entrance, bike parking, Changing areas, toilets, canteen and office. Facility shall be formed in a Two storey concrete building clad with rendered blockwork to a parapet level and punctuated with windows along the Northern elevation. The footprint shall measure 829m2 and the overall height to parapet shall be 11m2. The roof shall house a mixture of green roof and solar panels. c. Reroofing and expansion of existing Packing operations to the South and adjoining the New Welfare Accommodation. Construction shall be of Structural Steel lattice girders supporting a mixture of Trapezoidal Insulated roof panels and built up insulated roof system. The Southern wall shall be externally clad with Insulated Microrib panel which shall be augmented on the Southern and South Eastern elevations with Acoustic protection to minimise the operational noise at the boundary. The extended Packing area shall measure 1273m2 on plan with a general height above floor level of 10.5m. 3) Area 3 a. Construction of new Bakery Facility on the site of the existing Car Park and loading area at the North Western edge of the site, directly adjoining the existing facility. The bakery shall measure 3007m2 and shall be 11m high at the boundary stepping up to 14m on the Bakery proper and 18m on the North Western Corner. The facility shall be completed with a mixture of rendered blockwork and brick work panels with high level windows into the Production area. The bakery shall be constructed of Structural Steel lattice girders supporting Trapezoidal Insulated roof panels solar panels. b. Demolition of the existing services area at the Western boundary. c. A three storey Plant and Process Area shall be constructed on the Western elevation and shall be constructed in a Concrete frame and clad with insulated Cavity walls finished with a mixture of Brick and Plastered blockwork external Elevations. The construction shall be completed with a tower structure in the North Western Corner. Roof Construction shall be an insulated built up system supported from a precast concrete superstructure. d. Reroofing of the existing batch and Multiplant Bakery areas to the South and adjoining the New Bakery. The existing low double pitch roofs shall be removed and a new higher Structural Steel lattice girder structure supporting a mixture of Trapezoidal Insulated roof panels and built up insulated roof system installed along with Solar Panels. e. Reroofing and regeneration of the existing Pan Plant located on the Southern boundary to consist of the replacement of the existing external envelope of the building. 4) Area 4 a. Demolition of the existing Administration office and Silo Enclosure. b. Construction of a new three Storey Office block with ground floor covered car parking. The building shall be completed in a concrete frame and precast concrete floors. The facility shall be completed with a mixture of rendered blockwork and brick work panels with strip windows to the Western elevation. c. Realignment of the existing Flour Silos and the installation of four additional silos which hall shall be contained within a Micro rib clad steel Enclosure for visual purposes. d. Alterations to existing boundary and the creation of a new car park and Intake Vehicle unloading area including the relocation of the existing entrance gates and the addition of a new gateway specifically for the office area. e. Redefinition of the existing boundary treatments and improvements to the existing internal estate footpath network with increased definition of cyclist facilities and road separation. Improved lighting installations to the environs of the development and adjoining areas. f. Installation of Sustainable surface water drainage and retention systems to all upgraded areas.
SD25A/0139Wreceived 19 Nov 2025decided 8 Dec 2025368 m away
- Lands located at the former Chadwicks Builders Merchant site, South of Greenhills Road, North of the existing access road serving Greenhills Industrial Estate,, Greenhills Industrial Estate, Walkinstown, Dublin 12, D12 HD51, D12 N523,, D12 C602 Grant permission
i. The demolition of the former Chadwicks Builders Merchant development comprising 1 no. two storey office building and 9 no. storage/warehouse buildings ranging in height from 3m - 9.9m as follows: Building A (8,764 sq.m.), Building B (1,293 sq.m.), Building C (two-storey office building) (527 sq.m.), Building D (47 sq.m.), Building E (29 sq.m.), Building F (207 sq.m.), Building G (101 sq.m.), Building H (80 sq.m.), Building I (28 sq.m.), and Building J (44 sq.m.), in total comprising 11,120 sq.m.; (ii) the construction of a mixed-use residential and commercial development comprising 588 no. residential apartment units (291 no. one-beds, 238 no. two-beds and 59 no. three-beds), 1 no. 570.91 sq.m. (443 sq.m. indoor space) childcare facility and 6 no. no. commercial/retail units in 4 no. blocks (A-D) ranging in height from 5 to 12 storeys as follows: a. Block A comprises 170 no. apartments (103 no. 1 bed-units, 59 no. 2 bed-units and 8 no. 3- bed units) measuring 8 storeys in height. b. Block B comprises 197 no. apartments (89 no. 1 bed-units, 92 no. 2 bed-units and 16 no. 3 bed-units) measuring 10 storeys in height. c. Block C comprises 81 no. apartments (44 no. 1-bed units, 16 no. 2-bed units and 21 no. 3-bed units) measuring 12 storeys in height. d. Block D comprises 140 no. apartments (55 no. 1 bed-units, 71 no. 2 bed-units and 14 no. 3 bed-units) measuring 8 storeys in height. All apartments will be provided with private balconies/terraces; (iii) provision of indoor communal residential amenity (614.14 sq.m.) at ground and first floors of Block A, B & C, ; (iv) the construction of 1 no. childcare facility comprising 443 sq.m. with dedicated outdoor play area (128 sq.m.) located at ground floor of Block B; (v) the construction of 6 no. commercial units at ground floor level of Blocks A, B and D, and 1 no. commercial unit at first floor level of Block A as follows: Block A has 1 no. unit at ground floor comprising 455.8 sq.m. and 1 no. unit at first floor level comprising 160.79 sq.m., Block B has 1 no. unit at ground floor comprising 190.96 sq.m. and Block D has 4 no. units at ground floor comprising 361.6 sq.m., 232.3 sq.m., 238 sq.m. and 174.9 sq.m.; (vi) the construction of 4 no. vehicular entrances; a primary entrance via vehicular ramp from the north (access from Greenhills Road) and 3 no. secondary entrances from the south for access, emergency access and services (access from the existing road to the south of the site) with additional pedestrian accesses proposed along Greenhills Road; (vii) provision of 270 no. car parking spaces comprising 240 no. standard spaces (including 6 no. car club spaces) and 13 no. mobility spaces, and 8 no. motorbike spaces located at surface level and within undercroft car parks within Blocks A, B , C and D, 17 no. commercial/ unloading/ drop-off parking spaces at ground level; (viii) provision of 1,269 no. bicycle parking spaces comprising 952 no. residents' bicycle spaces, 10 no. cargo/accessible bicycle spaces in 14 no. bicycle storerooms in surface and undercroft parking areas and 307 no. visitors' bicycle spaces located externally at ground floor level throughout the development; (ix) provision of outdoor communal amenity space (3,130.3 sq.m) comprising landscaped courtyards that include play areas, seating areas, grass areas, planting and scented gardens located on podiums at first floor level; provision of communal amenity roof gardens in Block A & B with seating area and planting (746.1 sq.m.) and inclusion of centrally located public open space (6,650 sq.m.) adjacent to Blocks A, B, C and D comprising grassed areas, planting, seating areas, play areas, water feature, flexible use space and incidental open space/public realm; (x) provision of toucan crossing and all associated road markings and signage from the subject site to a new footpath on northern side of Greenhills Road; (xi) development also includes landscaping and infrastructural works, foul and surface water drainage, bin storage, ESB substations, plant rooms, pv panels, boundary treatments, internal roads, cycle paths and footpaths and all associated site works to facilitate the development. This application is accompanied by an Environmental Impact Assessment Report (EIAR).
LRD25A/0005Wreceived 28 Oct 2025decided 15 Dec 2025588 units393 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.