What closes soonest 1 open window
Observations close 16 Sept 20264 days left
SD26B/0370W — application received — Conversion of existing attic space comprising of modification of existing roof structure; new access stairs; two roof wi
5 weeks from receipt (12 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 375 m away
R2 — Existing residentialsouth dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028
RES: To protect and/or improve residential amenity
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Circle Paints Manufacturing Ireland Limited; Just The Plating Company Limited; CCM Limited T/A Kenn Truss
NIAH-recorded building
1
Catholic Church of the Holy Spirit
Radon risk area
8
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels
This site is on an RZLT map — the draft map 2027 and the final map 2026 (0.04 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs; two roof windows to the front and flat roof dormer to the rear.
(1) Demolition of all existing industrial and warehouse structures on site (579.1 sq.m) and associated site clearance works; (2) Construction of part 6, part 7, part 10 storey over basement mixed use block providing 99 no. apartments, comprising 49 no. one-bed units and 50 no. two-bed units, with balconies on all elevations; (3) Provision of a commercial unit (148.2sqm) fronting onto Greenhills Road at ground floor level along with a designated set down area/loading bay; (4) Provision of 87.2 sq.m of designated indoor residential amenity space at the ground floor level; (5) Provision of 1,127 sq.m of Communal Open Space to the rear of the site; (6) An access ramp to facilitate vehicular access to the basement car park which will provide 38 no. car parking spaces; A further 2 no. accessible car parking spaces are provided at ground level, resulting in a total of 40 no car parking spaces; (7) A total of 204 no. bicycle parking spaces (comprising 150 no. long stay and 54 no. short stay) at ground and basement level; (8) Provision of 68m of footpath along the Greenhills Road frontage, and a pedestrian crossing across the Greenhills Road; (9) All enabling and associated site development and works including landscaping, footpaths, boundary treatments, lighting, water and utility services and connections, bin stores, plant and all ancillary development and works above and below ground.
Phase 1: Partial removal of approved shed to rear & construction of a ground floor extension to the rear, and attic conversion with dormer to the rear, amendment of roof to create side gable. Phase 2: removal of remainder of shed & car garage to rear & construction modular garden room containing an office /den /gym with amended rear boundary and access associated site works.
SD26B/0244Wreceived 20 May 2026decided 9 Jul 2026486 m away
Permission to amend the existing main roof from hipped to gable with attic-level gable window and the construction of a dormer window in the main roof to the rear of the house.
SD26B/0221Wreceived 8 May 2026decided 19 Jun 2026483 m away
The development shall consist of the Demolition of the existing centrally located Single Storey industrial unit and ancillary offices housing the operations of AE Doors and the construction of a new three-storey Office and Welfare block housing the Staff facilities including Staff Entrance, bike parking, changing areas, toilets, canteen and office facilities. The development shall be formed in a three-storey steel and precast concrete structure clad with rendered blockwork to a parapet level and punctuated with Vertical Strip fenestration on the North and West Elevation with a full elevation of curtain walling on the North West Elevation incorporating vertical brise soleil. Ground floor shall house the Welfare facilities with two storeys of office above. Each floor shall measure 745 sqm giving an overall building floor area of 2,235 sqm. The overall height to parapet shall be 12m, giving a level of 67.59m OD. The roof shall support an extensive green roof. Some local car and bike parking shall be provided however the majority shall be housed with the wider Brennans site. A new boundary wall shall define the site and shall be set back to improve the footpath width. Local Landscaping shall be installed within the boundary incorporating the maximum permissible Suds infrastructure.
SD25A/0299Wreceived 8 Dec 2025decided 9 Feb 2026241 m away
Proposal to plant a hedge (Prunus lusitanica Portuguese laurel), within the border of our front garden, to enclose a green space and separate the garden area/lawn which is closest to the front of the house from the car parking area further from the house.
ED25/0110received 28 Nov 2025decided 10 Dec 2025490 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 18 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 12 Sept 2026, 19:17 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.