Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 09:38

Kimmage Road West, Kimmage Cross Roads

53.31306, -6.30433

Homes here mostly date from 1919–1945. 1 planning file on this house, the latest from 2023. Home extensions nearby almost always get approved (97%). 208 homes approved 186 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed. 1 planning file on this house, the latest from 2023.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945. 1 planning file on this house.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Kimmage Road WestBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2023: WEB1463/23 · attic or dormer, approved2022: 1 file on Kimmage Road West2023: 2 files on Kimmage Road West2024: 3 files on Kimmage Road West2025: 4 files on Kimmage Road West2026: 3 files on Kimmage Road West13 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    WEB1463/23 · attic or dormer · approved 2023 · not started, runs out 2028
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Leo Laboratories Limited (322 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Licensed industrial sites1Leo Laboratories Limited
Heritage inventory buildings1Northbrook
Radon grid squares5
Monuments2Windmill; R178425
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 86–100% by type. A new house in a garden is harder: 76% approved, and 1 in 3 is asked for more information.

Single-storey rear114 decided · more info asked 13%
100% · council 97%
Two-storey rear66 decided · more info asked 17%
97% · council 96%
Two-storey side37 decided · more info asked 24%
95% · council 98%
Single-storey side22 decided · more info asked 18%
86% · council 99%
Attic or dormer304 decided · more info asked 11%
97% · council 96%
First-floor36 decided · more info asked 22%
94% · council 94%
Garage conversion53 decided · more info asked 21%
100% · council 99%
Porch or front14 decided · more info asked 7%
100% · council 97%
New house in a garden or site41 decided · more info asked 29%
76% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 687 nearby, 5,771 council-wide

Figure 3

Kimmage Road West, file by file since 2022

8 of 8 decided extensions on the road were approved.

13 planning files on Kimmage Road West since 2022, by kind and decision.20222023202420252026Extensions, atticsNo. 82 · 2022 · attic conversion / dormer · approved · 4466/22No. 61 · 2023 · single-storey rear · approved · SD23B/0394No. 58 · 2023 · first-floor · approved · WEB1463/23No. 110 · 2024 · single-storey rear · approved · 4358/24No. 61 · 2024 · two-storey side · approved · SD24B/0190No. 91 · 2025 · garage conversion · withdrawn or invalid · 3453/25No. 91 · 2025 · garage conversion · approved · SD25B/0648No. 91 · 2026 · garage conversion · approved · SD26B/0160No. 55 · 2026 · single-storey rear · approved · SD26B/0299WNo. 63 · 2026 · two-storey rear · undecided · SD26B/0423WPorches, roofs, otherNo. 88 · 2024 · other work · approved · 3488/24No. 54 · 2025 · other work · approved · 3085/25No. 88 · 2025 · two-storey rear · approved · WEB2172/25New house in a side garden
ApprovedRefusedWithdrawn or invalid

13 files with "Kimmage Road West" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 5 within 250 m · 0 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

2 approved2 refused1 no decision or withdrawn
KindAppliedApprovedRefused
Garden room211
Single-storey rear11—
Single-storey side101
Two-storey rear10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 7 is asked for more information, which adds about 70 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 124 days; Appeal window: 4 weeks; If appealed: +132 days; Building starts: 112 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–55 (n=609)55 daysIf more info asked (1 in 7)With further information: median 124 days (n=102)124 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 132 days (n=84, all appeals within 1.5 km)+132 daysBuilding startsStart notice: median 112 days after permission (n=359)112 days after permissionSigned off335 days after the start, for the few who file. 53% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated711 decided home extensions, 367 start notices, 84 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    8 of 28 appealed refusals became permissions. 6 of 57 appealed approvals were reversed.

    Refusals appealed28 decided
    8 became permissions
    Approvals appealed57 decided
    6 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months

    None of 1 changed the council's decision

    • 500668 Granted with conditions · 36 Lavarna Road, Terenure, Dublin 6W · 367 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Kimmage Road West, Kimmage Cross Roads with 14 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedLarge schemeRefusedApprovedNo decision yetOther
    1. 181 St Agnes Park, Kimmage WEB3471/26No decision yet · 483 m
    2. 224 Whitehall Road, Terenure SD26B/0403WRefused · 202 m
    3. 3'Carlisle' ABP-313043Approved, not started, approval runs out within a year · 186 m
    4. 4Ravensdale Close, Kimmage WEB1988/26No decision yet · 282 m
    5. 535 Shelton Drive, Kimmage SD26B/0291WRefused · 174 m
    6. 655 Kimmage Road West, Kimmage SD26B/0299WApproved · 103 m
    7. 7West House, 63 Kimmage Road West SD26B/0423WNo decision yet · 148 m
    8. 84, Fortfield Road WEB1554/26Approved · 318 m
    9. 9285 Cashel Road, Crumlin WEB5898/25Approved · 322 m
    10. 1091, Kimmage Road West SD26B/0160Approved · 324 m
    11. 1114, Shelton Gardens SD26B/0355WNo decision yet · 326 m
    12. 126, Shelton Gardens ED26/0063Section 5: exempt · 337 m
    13. 13318 Cashel Road, Dublin 12 WEB6018/25Approved · 426 m
    14. 145, Shelton Park SD25B/0708Approved · 486 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 93 permissions since 2016, 42 show a start notice and 4 have a completion certificate.

    112 applications lodged within 500 m. Council: 93 approved, 4 refused. After appeals: 93 approved. Of those: 4 signed off, 19 built with the owner's opt-out, 19 started, 50 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT93: lodged → approved4: lodged → refused11: lodged → withdrawn or invalid4: lodged → undecided93: approved → approved4: refused → refused11: withdrawn or invalid → withdrawn4: undecided → undecided50: approved → no start notice found19: approved → built, owner opted out19: approved → started, not signed off4: approved → signed off1: approved → ran out112 lodged112 lodged93 approved93 approved4 refused4 refused11 withdrawn or invalid11 withdrawn or invalid4 undecided4 undecided93 approved93 approved4 refused4 refused11 withdrawn11 withdrawn4 undecided4 undecided50 no start notice found50 no start notice found19 built, owner opted out19 built, owner opted out19 started, not signed off19 started, not signed off4 signed off4 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured112 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    4 deadlines within 500 m; the first closes 4 Nov 2026.

    4 deadlines in the next 30 days: 2026-11-04 WEB3004/26: GRANT RETENTION PERMISSION — The development for which permission for retention is sought consists of a coffee outlet currently operating from a newl; 2026-11-11 WEB3471/26: application received — permission for the construction of, (1) new c.60m2 single storey extension to the front, side and rear, (2) demolition o; 2026-11-18 SD26B/0403W: Refuse Permission — Permission for development consisting of the installation of a bathroom to an existing, permitted single-story ancillary; 2026-11-19 WEB3540/26: application received — The development will consist of the provision of a new vehicular access to the front of the property, including the remotoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecWEB3004/26: GRANT RETENTION PERMISSION — The development for which permission for retention is sought consists of a coffee outlet currently operating from a newl · 483 m away · 2026-11-04WEB3471/26: application received — permission for the construction of, (1) new c.60m2 single storey extension to the front, side and rear, (2) demolition o · 483 m away · 2026-11-11SD26B/0403W: Refuse Permission — Permission for development consisting of the installation of a bathroom to an existing, permitted single-story ancillary · 202 m away · 2026-11-18WEB3540/26: application received — The development will consist of the provision of a new vehicular access to the front of the property, including the remo · 483 m away · 2026-11-19
    Comments closeTime to appeal ends
    • Time to appeal ends 4 Nov 20263 days left
      WEB3004/26 · GRANT RETENTION PERMISSION — The development for which permission for retention is sought consists of a coffee outlet…
      €220 to An Coimisiún Pleanála (€110 observer) · 483 m away
    • Comments close 11 Nov 202610 days left
      1WEB3471/26 · application received — permission for the construction of, (1) new c.60m2 single storey extension to the front, side…
      €20 to the council · 483 m away
    • Time to appeal ends 18 Nov 202617 days left
      2SD26B/0403W · Refuse Permission — Permission for development consisting of the installation of a bathroom to an existing, permitted…
      €220 to An Coimisiún Pleanála (€110 observer) · 202 m away
    • Comments close 19 Nov 202618 days left
      WEB3540/26 · application received — The development will consist of the provision of a new vehicular access to the front of the…
      €20 to the council · 483 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    208 homes 186 m away were approved Sept 2022 with no start notice yet; the permission runs to Sept 2027.

    'Carlisle' · 208 homes: 208 homes approved, not started; runs out Sep 20272022202320242025202620272028'Carlisle' · 208 homes186 m · ABP-313043208 homes approved, not started; runs out Sep 2027208 homes approved, not started; runs out Sep 2027today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 1 within 500 m

    Approved, not started, approval running out 1

    • 'Carlisle' · 208 homes approved, not started; runs out Sep 2027 · 186 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 14 and 24 a year; busiest 2025. 96% of decisions were approvals.

    2021: 17, 2022: 14, 2023: 21, 2024: 22, 2025: 24, 2026: 1401020302021: 17 approved17’21*2022: 13 approved2022: 1 refused14’222023: 20 approved2023: 1 withdrawn or invalid21’232024: 21 approved2024: 1 refused22’242025: 18 approved2025: 6 withdrawn or invalid24’252026: 4 approved2026: 2 refused2026: 4 withdrawn or invalid2026: 4 undecided14’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 24 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 9 in the last 12 months
    2 not signed off7 no sign-off needed
    • 35 Muckross Green, Dublin 12, Dublin · 30 Sept 2026 · 2 homes · start notice not signed off · SD25A/0164 · 491 m
    • 24 Whitehall Road, Dublin 12, Dublin, D12 H7Y3 · 4 Aug 2026 · start notice, opted out no sign-off needed · SD25B/0701W · 211 m
    • 36 Lavarna Road, Dublin 6W, Dublin 6 W, D6W VP48 · 4 Aug 2026 · short notice no sign-off needed · WEB5503/25 · 390 m
    • 57 Fortfield Road, Dublin 6W, Dublin, D6W W318 · 6 Jul 2026 · start notice, opted out no sign-off needed · SD25B/0539 · 443 m
    • 5 Shelton Park, Kimmage, South Dublin, D12 RR96 · 16 Apr 2026 · start notice, opted out no sign-off needed · SD25B/0708 · 496 m
    • 135 Terenure Road West, Terenure, Dublin 6, D6W H104 · 24 Feb 2026 · start notice, opted out no sign-off needed · WEB5454/25 · 440 m
    • 6 Whitehall Gardens, Dublin, South Dublin, D12 T6V0 · 9 Feb 2026 · start notice, opted out no sign-off needed · SD25B/0242 · 314 m
    • 4 Cashel Avenue, Dublin 12, D12 X2N7 · 19 Jan 2026 · short notice no sign-off needed · WEB2647/25 · 415 m
    • 52-54 Kimmage Road West, Dublin, D12 X379 · 11 Nov 2025 · 7-day notice not signed off · 3085/25 · 112 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 208 not started
    • 'Carlisle' · 208 homes · runs out soon · runs out 22 Sept 2027 · 186 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Carlisle, Kimmage Road West208208 not started (2026-Q2)18 m
    Ravensdale Close26no activity on site reported (2026-Q2)282 m
    Fortfield Road LRD284284 not started (2026-Q2)744 m
    Clonmacnoise Grove30no activity on site reported (2026-Q2)998 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Cocoon Childcare - Kimmage · Crèche24 Apr 2026 · report · Tusla Early Years Inspectorate441 m
    Réaltaí Beaga · Crèche30 Sept 2025 · report · Tusla Early Years Inspectorate593 m
    Little People's Montessori School · Crèche13 Nov 2025 · report · Tusla Early Years Inspectorate757 m
    Happy Phases Pre- School · Crèche1 Apr 2026 · report · Tusla Early Years Inspectorate810 m
    Daisy Chain Montessori and Childcare Centre · Crèche26 Jan 2026 · report · Tusla Early Years Inspectorate831 m
    Amazing Minds Montessori · Crèche22 Sept 2025 · report · Tusla Early Years Inspectorate841 m
    Eden Montessori School · Crèche7 Jul 2025 · report · Tusla Early Years Inspectorate909 m
    Horizons Montessori School · Crèche19 Jun 2026 · report · Tusla Early Years Inspectorate939 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Quieter than most of Dublin City Council.
    Homes approved
    Here27
    Council middle50
    Homes started
    Here65
    Council middle105
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    55% owner-occupied (council 47%).

    Homes built before 1971
    51% · council 52%
    Homes built since 2001
    2% · council 19%
    Owner-occupied
    55% · council 47%
    Rented
    44% · council 45%
    Children under 15
    17% · council 15%
    Aged 65 and over
    23% · council 13%
    Households with 2+ cars
    29% · council 19%
    Work mainly from home
    12% · council 12%
    This small area (316 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268094010

    Road noise
    60–64 dB
    day–night average (EPA 2022)
    Bus
    80 m
    Whitehall Rd E · F3, S4 · busiest stop within 500 m: 19 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Yes
    OPW flood map area within 100 m
    Nearest school
    660 m
    Rosary College, 250 pupils
    Homes sold nearby
    46
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Rosary College · postprimary · 250 pupils · 660 m
    • Scoil Eoin · primary · 142 pupils · 801 m
    • Scoil Úna Naofa · primary · 356 pupils · 801 m
    • Our Lady of Hope School · primary · 45 pupils · 877 m

    Stops 55

    • Whitehall Rd E · F3, S4 · 10/hour at peak · 80 m
    • Whitehall Rd E · 15A, F2 · 7/hour at peak · 102 m
    • Kimmage Road West · 15A, F2, F3, S4 · 19/hour at peak · 128 m
    • Whitehall Gdns · 15A, F2 · 8/hour at peak · 266 m
    • Kimmage Road West · 15A, F2, F3, S4 · 17/hour at peak · 272 m
    • Fortfield Rd N · F1 · 4/hour at peak · 290 m
    • Fortfield Rd N · F1 · 4/hour at peak · 304 m
    • L O'Toole Pk · F3, S4 · 11/hour at peak · 316 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Rosary College · 659 m+11.1% pupils (250)
    • Scoil Eoin · 801 m+2.9% pupils (142)
    • Scoil Úna Naofa · 801 m-1.4% pupils (356)
    • Our Lady of Hope School · 877 m0% pupils (45)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.5 ha · 65 m
    • South Dublin County Council · 0.66 ha · 163 m
    • An Post · 0.22 ha · 217 m
    • Dublin City Council · 0.3 ha · 306 m
    • Dublin City Council · 0.42 ha · 373 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Attic or dormer (WEB1463/23) approved 2023, not started: still planned?
      Ask for: The grant, and whether it stays with the house.
      Seller · solicitor
    2. Flood risk area within 100 m: can you insure it?
      Ask for: A flood-cover quote before sale agreed.
      Insurer
    3. 208 homes approved 186 m away ('Carlisle'), not started: what is planned?
      Ask for: The planning file for ABP-313043.
      Council
    4. Application 483 m away open for comments until 11 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    5. Decision 202 m away can be appealed until 18 Nov 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Kimmage E
    Electoral area
    Kimmage-Rathmines
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest WEB1463/23, approved 2023, not started, runs out 2028.
    • Zoned R2 (existing residential); not protected; no vacant land tax; flood risk area within 100 m.
    • 1 site nearby could change: 1 approved scheme.
    • 2 applications open for comments nearby; nearest closes 11 Nov 2026.
    • 208 homes approved nearby, not started; largest 208 at 'Carlisle'.
    • Kimmage Road West (bus 15A, F2) 128 m away: 19 an hour at morning peak; 192 from all stops within 500 m.
    • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 55% owner-occupied (council 47%); 9% of homes empty (council 8%); most built 1919–1945; 40% drive to work (council 28%); population up 3% since 2016.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 31
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 09:38 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.