PlanningRegister.ie
Planning report · South Dublin County Council · 500 m around the house · the last 12 months · 21 Oct 2026, 23:19

Whitehall Road West

53.31327, -6.31991

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (97%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Whitehall Road WestBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2000: 4 files on Whitehall Road West2001: 9 files on Whitehall Road West2002: 6 files on Whitehall Road West2003: 5 files on Whitehall Road West2004: 1 file on Whitehall Road West2005: 5 files on Whitehall Road West2006: 2 files on Whitehall Road West2008: 2 files on Whitehall Road West2009: 1 file on Whitehall Road West2010: 2 files on Whitehall Road West2011: 2 files on Whitehall Road West2012: 1 file on Whitehall Road West2013: 4 files on Whitehall Road West2014: 2 files on Whitehall Road West2016: 2 files on Whitehall Road West2017: 1 file on Whitehall Road West2018: 3 files on Whitehall Road West2019: 1 file on Whitehall Road West2020: 5 files on Whitehall Road West2021: 1 file on Whitehall Road West2022: 3 files on Whitehall Road West2023: 5 files on Whitehall Road West2024: 3 files on Whitehall Road West2025: 7 files on Whitehall Road West2026: 4 files on Whitehall Road West81 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 5
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RES: To protect and/or improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 5 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Plateco ZN Limited (863 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Radon grid squares7
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM) · fetched 19 Oct 2026, 23:51
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93–100% by type. A new house in a garden is harder: 83% approved, and 1 in 2 is asked for more information.

Single-storey rear143 decided · more info asked 17%
99% · council 94%
Two-storey rear59 decided · more info asked 25%
97% · council 94%
Two-storey side41 decided · more info asked 24%
98% · council 94%
Single-storey side28 decided · more info asked 14%
93% · council 95%
Attic or dormer452 decided · more info asked 15%
96% · council 95%
First-floor52 decided · more info asked 15%
98% · council 92%
Garage conversion54 decided · more info asked 15%
100% · council 99%
Porch or front23 decided · more info asked 22%
100% · council 95%
New house in a garden or site65 decided · more info asked 49%
83% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 917 nearby, 4,865 council-wide

Figure 3

Whitehall Road West, file by file since 2000

26 of 28 decided extensions on the road were approved. New houses in side gardens or on sites: 4 of 7.

81 planning files on Whitehall Road West since 2000, by kind and decision.20002002200420062008201020122014201620182020202220242026Extensions, atticsNo. 5 · 2000 · attic conversion / dormer · approved · S00A/0368No. 2 · 2001 · single-storey rear · approved · S01A/0109No. 176A · 2001 · single-storey side · refused · S01B/0240No. 180 · 2002 · single-storey rear · refused · SD02A/0467No. 118 · 2002 · two-storey side · approved · SD02B/0170No. 5 · 2002 · attic conversion / dormer · approved · SD02B/0518No. 182 · 2003 · single-storey rear · approved · SD03A/0003No. 1 · 2005 · two-storey side · approved · SD05B/0787No. 2 · 2006 · rear · approved · SD06A/0105No. 181 · 2008 · garage conversion · approved · SD08B/0731No. 134 · 2009 · two-storey side · approved · SD09B/0126No. 1 · 2011 · single-storey rear · approved · SD11A/0044No. 176 · 2013 · single-storey rear · approved · SD13B/0186No. 161 · 2013 · two-storey rear · approved · SD13B/0274No. 126 · 2014 · single-storey side · approved · SD14B/0238No. 144 · 2018 · two-storey side · approved · SD18B/0049No. 167 · 2018 · two-storey rear · approved · SD18B/0065No. 34 · 2020 · attic conversion / dormer · approved · SD20B/0169No. 166 · 2023 · first-floor · approved · SD23B/0065No. 70 · 2024 · attic conversion / dormer · approved · SD24B/0013No. 78 · 2024 · single-storey side · approved · SD24B/0216No. 173 · 2024 · attic conversion / dormer · approved · SD24B/0432WNo. 3 · 2025 · attic conversion / dormer · approved · SD25A/0095WNo. 122 · 2025 · attic conversion / dormer · approved · SD25B/0010WNo. 148 · 2025 · attic conversion / dormer · approved · SD25B/0080WNo. 157A · 2025 · attic conversion / dormer · approved · SD25B/0227WNo. 166 · 2025 · attic conversion / dormer · approved · SD25B/0515WNo. 34 · 2026 · single-storey rear · approved · SD26B/0120WNo. 126 · 2026 · rear · undecided · SD26B/0386WPorches, roofs, otherNo. 2 · 2000 · other work · approved · S00A/0079No. 34 · 2000 · other work · refused · S00A/0819No. 68 · 2000 · other work · approved · S00B/0024No. 182 · 2001 · other work · refused · S01A/0059No. 34 · 2001 · other work · refused · S01A/0104No. 188 · 2001 · other work · approved · S01A/0715No. 2 · 2001 · other work · approved · S01A/0783No. 2 · 2001 · other work · approved · S01B/0017No. 172 · 2001 · other work · approved · S01B/0535No. 174 · 2001 · other work · approved · S01B/0599No. 188 · 2002 · other work · refused · S02A/0159No. 5 · 2002 · other work · refused · S02B/0035No. 110 · 2002 · other work · approved · SD02A/0260No. 188 · 2003 · other work · approved · SD03A/0426No. 180 · 2003 · other work · approved · SD03A/0514No. 180 · 2003 · other work · approved · SD03A/0602No. 188 · 2005 · other work · approved · SD05A/0168No. 178 · 2005 · other work · withdrawn or invalid · SD05A/0555No. 178 · 2005 · other work · refused · SD05A/0693No number · 2006 · other work · approved · SD06A/0518No. 16 · 2008 · other work · approved · SD08B/0686No. 20 · 2010 · other work · approved · SD10B/0037No. 26 · 2010 · other work · approved · SD10B/0262No. 3 · 2011 · other work · refused · SD11A/0112No number · 2012 · other work · approved · SD12A/0199No number · 2013 · other work · refused · SD13A/0158No. 5150 · 2013 · other work · withdrawn or invalid · SD13A/0216No. 5150 · 2014 · other work · approved · SD14A/0064No number · 2016 · other work · refused · SD16A/0062No. 66 · 2016 · other work · refused · SD16A/0167No. 90 · 2017 · other work · refused · SD17B/0147No. 160 · 2018 · other work · approved · SD18B/0252No. 3 · 2019 · other work · refused · SD19A/0316No. 21 · 2020 · other work · approved · SD20A/0306No number · 2021 · other work · approved · SD21A/0251No number · 2022 · other work · approved · SD22A/0059No. 21 · 2022 · other work · approved · SD22A/0145No. 186 · 2022 · other work · withdrawn or invalid · SD22A/0364No. 3 · 2023 · other work · refused · SD23A/0112No. 76 · 2023 · other work · approved · SD23B/0247No. 188 · 2025 · other work · approved · SD25A/0263WNo. 186 · 2025 · other work · withdrawn or invalid · SD25A/0315WNo. 186 · 2026 · other work · undecided · SD26A/0021WNo. 178C · 2026 · other work · undecided · SD26A/0240WNew house in a side gardenNo. 1 · 2003 · new house · refused · SD03A/06791No. 1 · 2004 · new house · refused · SD04A/04871No. 144 · 2005 · new house · refused · SD05A/0075144No. 188 · 2020 · new house · withdrawn or invalid · SD20A/0214188No. 188 · 2020 · new house · approved · SD20A/0254No. 157 · 2020 · new house · approved · SD20A/0271No. 76 · 2023 · new house · approved · SD23A/016576No. 188 · 2023 · new house · approved · SD23A/0172
ApprovedRefusedWithdrawn or invalid

81 files with "Whitehall Road West" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2000–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

1 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Rear10—
Single-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 72 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 126 days; Appeal window: 4 weeks; If appealed: +122 days; Building starts: 112 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–55 (n=782)55 daysIf more info asked (1 in 6)With further information: median 126 days (n=156)126 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 122 days (n=120, all appeals within 1.5 km)+122 daysBuilding startsStart notice: median 112 days after permission (n=420)112 days after permissionSigned off352 days after the start, for the few who file. 50% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated938 decided home extensions, 425 start notices, 120 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    17 of 44 appealed refusals became permissions. 7 of 78 appealed approvals were reversed.

    Refusals appealed44 decided
    17 became permissions
    Approvals appealed78 decided
    7 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months

    1 of 1 changed the council's decision

    • 500645 Granted · 59, Dangan Park, Kimmage Road West, Dublin 12, D12 YA06 · 369 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher21 Oct 2026, 01:40open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Question 4

    What's changing around you?

    Street map around Whitehall Road West with 15 numbered planning items
    ⌖ the houseDerelict buildingApprovedNo decision yet
    1. 1No Address DS1412Derelict building · 444 m
    2. 254 Hillsbrook Avenue, Perrystown SD26B/0342WApproved · 218 m
    3. 341A, Dangan Park SD26B/0232WApproved · 219 m
    4. 4126, Whitehall Road West SD26B/0386WNo decision yet · 249 m
    5. 516, Gleann Na Smol SD26B/0079Approved · 252 m
    6. 628, Cherryfield Avenue SD26B/0063WApproved · 253 m
    7. 773, Beechfield Road SD25B/0706WApproved · 255 m
    8. 834, Whitehall Road West SD26B/0120WApproved · 256 m
    9. 938 Cherryfield Drive, Walkinstown SD25B/0650WApproved · 269 m
    10. 1040, Cherryfield Avenue SD25B/0622WApproved · 271 m
    11. 1195, Beechfield Rd SD26B/0382WNo decision yet · 309 m
    12. 121, Hillsbrook Drive SD25B/0650Approved · 311 m
    13. 1314, Cherry Grove SD25B/0710WApproved · 313 m
    14. 14Former Submarine Bar Public House, Cromwellsfort Road SD26A/0234WNo decision yet · 328 m
    15. 1549 Hillsbrook Avenue, Dublin 12 SD26B/0408WNo decision yet · 331 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 174 permissions since 2016, 74 show a start notice and 4 have a completion certificate. Most owners opt out of sign-off.

    215 applications lodged within 500 m. Council: 173 approved, 20 refused. After appeals: 174 approved. Of those: 4 signed off, 43 built with the owner's opt-out, 27 started, 93 with no start notice found, 7 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT173: lodged → approved20: lodged → refused15: lodged → withdrawn or invalid7: lodged → undecided168: approved → approved14: refused → refused15: withdrawn or invalid → withdrawn7: undecided → undecided3 approved by the council, refused after an appeal2 approved by the council, withdrawn or invalid after an appeal6 refused by the council, approved after an appeal93: approved → no start notice found43: approved → built, owner opted out27: approved → started, not signed off4: approved → signed off7: approved → ran out215 lodged215 lodged173 approved173 approved20 refused20 refused15 withdrawn or invalid15 withdrawn or invalid7 undecided7 undecided174 approved174 approved17 refused17 refused17 withdrawn17 withdrawn7 undecided7 undecided93 no start notice found93 no start notice found43 built, owner opted out43 built, owner opted out27 started, not signed off27 started, not signed off4 signed off4 signed off7 ran out7 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured215 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 1 within 500 m

      Derelict building 1

      • 1No Address · derelict since Nov 2024 · 444 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 21 Oct 2026, 02:35
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
      Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
      Council meetings (ModernGov)Public21 Oct 2026, 02:35open
      National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
      Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
      Figure 8

      Applications within 500 m, by year

      Between 10 and 33 a year; busiest 2025. 90% of decisions were approvals.

      2016: 4, 2017: 10, 2018: 11, 2019: 18, 2020: 23, 2021: 22, 2022: 25, 2023: 26, 2024: 26, 2025: 33, 2026: 170102030402016: 4 approved4’16*2017: 6 approved2017: 4 refused10’172018: 11 approved11’182019: 11 approved2019: 3 refused2019: 4 withdrawn or invalid18’192020: 22 approved2020: 1 refused23’202021: 18 approved2021: 3 refused2021: 1 withdrawn or invalid22’212022: 22 approved2022: 2 refused2022: 1 withdrawn or invalid25’222023: 20 approved2023: 2 refused2023: 4 withdrawn or invalid26’232024: 23 approved2024: 2 refused2024: 1 withdrawn or invalid26’242025: 28 approved2025: 3 refused2025: 2 withdrawn or invalid33’252026: 8 approved2026: 2 withdrawn or invalid2026: 7 undecided17’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 29 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 21 Oct 2026, 02:27
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
      Building work nearby 11 in the last 12 months
      11 no sign-off needed
      • 2 Muckross Avenue, Dublin 12, Dublin, D12 K129 · 23 Sept 2026 · short notice no sign-off needed · SD24B/0116 · 334 m
      • 73 Beechfield Road, Dublin 12, Dublin, D12 YK07 · 29 Jun 2026 · short notice no sign-off needed · SD25B/0706W · 266 m
      • 170 Kimmage Road West, Dublin 12, D12 AC80 · 26 Jun 2026 · start notice, opted out no sign-off needed · WEB1568/26 · 465 m
      • 17 Greentrees Park, Dublin 12, Dublin, D12 WF29 · 22 Jun 2026 · start notice, opted out no sign-off needed · SD25B/0481 · 472 m
      • 40 Cherryfield Avenue, Dublin 12, Dublin, D12 Y0P0 · 10 Jun 2026 · short notice no sign-off needed · SD25B/0622W · 285 m
      • 28 Shelton Park, Kimmage, South Dublin, D12 RW27 · 27 Apr 2026 · start notice, opted out no sign-off needed · SD25B/0463W · 379 m
      • 10 Muckross Green, South Dublin, D12 XY38 · 15 Apr 2026 · start notice, opted out no sign-off needed · SD25B/0649 · 408 m
      • 11 Greentrees Park, Dublin, South Dublin, D12 EHC5 · 23 Mar 2026 · short notice no sign-off needed · SD25B/0653W · 478 m
      • 38 Rockfield Avenue, Perrystown, South Dublin, D12 EV22 · 13 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · SD25A/0176W · 433 m
      • 18 Muckross Green, Perrystown, South Dublin, D12 WN59 · 13 Jan 2026 · short notice no sign-off needed · SD25B/0498W · 450 m
      • Former Lighting & Electrical Distribution Group Ltd Factory Complex, Moeran Road, Walkinstown, Dublin 12, Dublin, Dublin 12, D12 XV07 · 3 Nov 2025 · 50 homes · short notice no sign-off needed · 3978/24 · 438 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 21 Oct 2026, 01:58
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
      Homes coming 0 not started
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 21 Oct 2026, 02:27
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
      National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
      Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Little John Centre2020 built (2025-Q1)351 m
      Carlisle, Kimmage Road West145— (2025-Q3)375 m
      Lighting & Electrical Distribution Group Ltd Factory Complex50—411 m
      Former Lighting & Electrical Distribution Group Factory59—411 m
      Tymon North——738 m
      Glebe House and Coruba House Site146146 not started (2026-Q2)767 m
      Crumlin Delivery Service Unit53—824 m
      Former Eircom Training Centre376—895 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Wonder Years · Crèche8 May 2023 · report · Tusla Early Years Inspectorate187 m
      Happy Phases Pre- School · Crèche1 Apr 2026 · report · Tusla Early Years Inspectorate426 m
      Cocoon Childcare - Kimmage · Crèche24 Apr 2026 · report · Tusla Early Years Inspectorate599 m
      Amazing Minds Montessori · Crèche22 Sept 2025 · report · Tusla Early Years Inspectorate692 m
      Evergreen Montessori · Crèche17 Sept 2025 · report · Tusla Early Years Inspectorate786 m
      Ups A Daisy Childcare · Crèche7 Aug 2025 · report · Tusla Early Years Inspectorate837 m
      Chestnut Daycare · Crèche3 Dec 2024 · report · Tusla Early Years Inspectorate863 m
      Small Wonders Montessori & Afterschool Centre · Crèche24 Feb 2026 · report · Tusla Early Years Inspectorate919 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 02:27
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
      National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register14 Oct 2026, 23:20open
      How busy is this area Busier than most of South Dublin County Council.
      Homes approved
      Here145
      Council middle0
      Homes started
      Here232
      Council middle4
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
      National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      88% of homes built before 1971 (council 18%). 84% owner-occupied (council 67%).

      Homes built before 1971
      88% · council 18%
      Homes built since 2001
      1% · council 27%
      Owner-occupied
      84% · council 67%
      Rented
      9% · council 29%
      Children under 15
      14% · council 21%
      Aged 65 and over
      23% · council 13%
      Households with 2+ cars
      36% · council 40%
      Work mainly from home
      16% · council 10%
      This small area (300 people)South Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267156008

      Bus
      16 m
      Quarry Drive · 150, 82 · busiest stop within 500 m: 11 an hour at peak
      Radon
      1 in 5
      homes here likely high (EPA). Test it
      Flood
      Within 500 m
      OPW flood map area, not beside the house
      Nearest school
      141 m
      St Damiens Ns, 231 pupils
      Homes sold nearby
      76
      in 3 years, 23 new (Property Price Register)
      Schools, stops and the council

      Schools

      • St Damiens Ns · primary · 231 pupils · 141 m
      • Holy Spirit Junior Primary School · primary · 270 pupils · 749 m
      • Holy Spirit Senior Primary School · primary · 269 pupils · 814 m

      Stops 51

      • Quarry Drive · 150, 82 · 6/hour at peak · 16 m
      • Quarry Drive · 150, 82 · 8/hour at peak · 48 m
      • Limekiln Lane · 150, 82 · 8/hour at peak · 155 m
      • Ashleaf SC · 150, 82 · 8/hour at peak · 308 m
      • Muckross Avenue · 150, 82 · 6/hour at peak · 345 m
      • Ashleaf · 150, 82 · 6/hour at peak · 350 m
      • Ashleaf · F3 · 4/hour at peak · 369 m
      • Cherry Grove · 27, F3 · 4/hour at peak · 377 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Damiens Ns · 141 m-0.4% pupils (231)
      • Holy Spirit Junior Primary School · 749 m-2.5% pupils (270) · temporary classrooms 2024, approved
      • Holy Spirit Senior Primary School · 813 m+1.1% pupils (269) · temporary classrooms 2024, approved

      Open consultations

      Council meetings 25 items

      Public land

      • Dublin City Council · 0.15 ha · 194 m
      • Dublin City Council · 2.76 ha · 237 m
      • Dublin City Council · 0.56 ha · 290 m
      • Dublin City Council · 0.17 ha · 290 m
      • Dublin City Council · 0.98 ha · 343 m
      • Dublin City Council · 2.56 ha · 409 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 21 Oct 2026, 02:35
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
      Council consultation portalsPublic21 Oct 2026, 01:42open
      Council meetings (ModernGov)Public21 Oct 2026, 02:35open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. High radon area (1 in 5 homes): has it been tested?
        Ask for: Radon test results.
        Seller
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Roebuck
      Electoral division
      Terenure-Greentrees
      Electoral area
      Rathfarnham-Templeogue
      Council
      South Dublin County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
      • 1 site nearby could change: 1 derelict.
      • Ashleaf (bus 150, 27) 451 m away: 14 an hour at morning peak; 103 from all stops within 500 m.
      • Here (2022 census): 84% owner-occupied (council 66%); 2% of homes empty (council 4%); most built 1946–1960; 42% drive to work (council 54%); population up 3% since 2016.
      • 2 home extensions within 250 m since 2026.
      • Around here the council decides in a median 54 days (about 8 weeks); 1 in 5 is asked for more information.
      • Homes started within 1 km: 53 in the last year, 21 three years before.
      • 29 applications nearby in the last 12 months; 94% approved (council 88%); 7% for work already built (council 15%).
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 29
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.021 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public21 Oct 2026
      www2.courts.ie—© the publisher21 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public21 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.021 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence21 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 21 Oct 2026, 23:19 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.