Planning report · South Dublin County Council · 500 m around the house · the last 12 months · 20 Oct 2026, 23:48

Commons Road, Clondalkin

53.31402, -6.39896

Homes here mostly date from the 1950s. 1 planning file on this house, the latest from 2001. Home extensions nearby almost always get approved (91%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed. 1 planning file on this house, the latest from 2003.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960. 1 planning file on this house.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Commons RoadBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2003: S01B/0411 · garden room, approved1999: 1 file on Commons Road2000: 2 files on Commons Road2001: 2 files on Commons Road2002: 2 files on Commons Road2004: 2 files on Commons Road2005: 1 file on Commons Road2007: 1 file on Commons Road2008: 1 file on Commons Road2009: 2 files on Commons Road2010: 1 file on Commons Road2011: 1 file on Commons Road2012: 2 files on Commons Road2016: 1 file on Commons Road2020: 1 file on Commons Road2026: 1 file on Commons Road21 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2003
    S01B/0411 · garden room · approved 2003 · built? unknown
    approvedstarted?signed off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RES: To protect and/or improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Heritage inventory5 within 100 m house; house
Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings7house
Radon grid squares3
Monuments5Ritual site - holy well; Inscribed stone
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 83–100% by type. A new house in a garden is harder: 69% approved, and 1 in 2 are asked for more information.

Single-storey rear44 decided · more info asked 18%
93% · council 94%
Two-storey rear15 decided · more info asked 27%
93% · council 94%
Two-storey side12 decided · more info asked 42%
83% · council 94%
Single-storey side10 decided · more info asked 10%
90% · council 95%
Attic or dormer103 decided · more info asked 16%
93% · council 95%
First-floor11 decided · more info asked 9%
91% · council 92%
Garage conversion14 decided · more info asked 7%
100% · council 99%
New house in a garden or site26 decided · more info asked 50%
69% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 235 nearby, 4,676 council-wide

Figure 3

Commons Road, file by file since 1999

6 of 6 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 2.

21 planning files on Commons Road since 1999, by kind and decision.19992001200320052007200920112013201520172019202120232025Extensions, atticsNo. 28 · 2004 · two-storey rear · approved · SD04B/0264No. 42 · 2004 · two-storey rear · approved · SD04B/0544No number · 2009 · attic conversion / dormer · approved · SD09A/0373No. 39 · 2009 · single-storey side · approved · SD09B/0084No number · 2010 · attic conversion / dormer · approved · SD10B/0103No. 52 · 2026 · single-storey rear · approved · SD26B/0031WPorches, roofs, otherNo number · 1999 · other work · approved · S99A/0847No number · 2000 · other work · refused · S00A/0157No number · 2000 · other work · approved · S00A/0865No number · 2001 · other work · withdrawn or invalid · S01A/0774No number · 2002 · other work · withdrawn or invalid · SD02A/0460No number · 2002 · other work · withdrawn or invalid · SD02A/0678No. 45 · 2005 · other work · approved · SD05A/0496No number · 2007 · other work · refused · SD07A/0271No. 26A · 2008 · other work · approved · SD08A/0683No number · 2011 · other work · refused · SD11A/0222No. 26A · 2012 · other work · refused · SD12A/0037No. 26A · 2012 · other work · approved · SD12A/0215No number · 2016 · other work · approved · SD16A/0189New house in a side gardenNo number · 2001 · new house · refused · S01A/0239No. 35 · 2020 · new house · approved · SD20A/005235
ApprovedRefusedWithdrawn or invalid

21 files with "Commons Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 1999–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

2 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear32—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 92 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 145 days; Appeal window: 4 weeks; If appealed: +136 days; Building starts: 152 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–55 (n=220)55 daysIf more info asked (1 in 6)With further information: median 145 days (n=44)145 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 136 days (n=58, all appeals within 1.5 km)+136 daysBuilding startsStart notice: median 152 days after permission (n=110)152 days after permissionSigned off460 days after the start, for the few who file. 45% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated264 decided home extensions, 110 start notices, 58 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    17 of 33 appealed refusals became permissions. 1 of 25 appealed approvals were reversed.

    Refusals appealed33 decided
    17 became permissions
    Approvals appealed25 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 500810 Other · Tralee, St. John's Avenue, Dublin 22, D22 RY66. · 194 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher20 Oct 2026, 01:39open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 4

    What's changing around you?

    Street map around Commons Road, Clondalkin with 11 numbered planning items
    ⌖ the houseWindow closingAppealBuilding startedNo decision yetApproved
    1. 1Moyle Park College, Convent Road SD26A/0196WNo decision yet · 417 m
    2. 2Tralee, St. John's Avenue 500810Appeal: other outcome · 194 m
    3. 352 Commons Road, Dublin 22 SD26B/0031WBuilding started · 107 m
    4. 45a Convent View Cottages, Boot Road SD26B/0393WNo decision yet · 30 m
    5. 5No. 52, Commons Road SD26B/0031WApproved · 95 m
    6. 6118, Rockfield Drive SD25B/0623WApproved · 227 m
    7. 7100 Boot Road, Clondalkin SD25A/0316WApproved · 253 m
    8. 8SDCC Lands @28 Locations PT8SD422No decision yet · 305 m
    9. 924, St Brigid's Road SD25B/0717WApproved · 406 m
    10. 1048 St Brigid's Drive, Dublin 5 WEB3046/26No decision yet · 413 m
    11. 114 St. Johns Road West, Clondalkin SD26B/0328WApproved · 415 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 88 permissions since 2016, 36 show a start notice and 8 have a completion certificate.

    114 applications lodged within 500 m. Council: 84 approved, 16 refused. After appeals: 88 approved. Of those: 8 signed off, 17 built with the owner's opt-out, 11 started, 47 with no start notice found, 5 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT84: lodged → approved16: lodged → refused10: lodged → withdrawn or invalid4: lodged → undecided81: approved → approved8: refused → refused10: withdrawn or invalid → withdrawn4: undecided → undecided3 approved by the council, withdrawn or invalid after an appeal7 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal47: approved → no start notice found17: approved → built, owner opted out11: approved → started, not signed off8: approved → signed off5: approved → ran out114 lodged114 lodged84 approved84 approved16 refused16 refused10 withdrawn or invalid10 withdrawn or invalid4 undecided4 undecided88 approved88 approved8 refused8 refused14 withdrawn14 withdrawn4 undecided4 undecided47 no start notice found47 no start notice found17 built, owner opted out17 built, owner opted out11 started, not signed off11 started, not signed off8 signed off8 signed off5 ran out5 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured114 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 5 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-05 SD26A/0196W: Request Additional Information — Construction of a new single-storey school building(230sq.m.), soft play area (100sq.m.), and all associated site works today25 Oct30 Oct4 Nov9 Nov14 Nov19 NovSD26A/0196W: Request Additional Information — Construction of a new single-storey school building(230sq.m.), soft play area (100sq.m.), and all associated site works · 417 m away · 2026-11-05
    Time to appeal ends
    • Time to appeal ends 5 Nov 202616 days left
      1SD26A/0196W · Request Additional Information — Construction of a new single-storey school building(230sq.m.), soft play area…
      €220 to An Coimisiún Pleanála (€110 observer) · 417 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Applications within 500 m, by year

    Between 6 and 20 a year; busiest 2021. 84% of decisions were approvals.

    2016: 1, 2017: 6, 2018: 9, 2019: 11, 2020: 14, 2021: 20, 2022: 7, 2023: 14, 2024: 14, 2025: 12, 2026: 6051015202016: 1 approved1’16*2017: 5 approved2017: 1 refused6’172018: 6 approved2018: 3 refused9’182019: 9 approved2019: 2 refused11’192020: 11 approved2020: 1 refused2020: 2 withdrawn or invalid14’202021: 17 approved2021: 2 refused2021: 1 withdrawn or invalid20’212022: 5 approved2022: 2 refused7’222023: 7 approved2023: 2 refused2023: 5 withdrawn or invalid14’232024: 10 approved2024: 2 refused2024: 2 withdrawn or invalid14’242025: 11 approved2025: 1 refused12’252026: 2 approved2026: 4 undecided6’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 10 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Building work nearby 4 in the last 12 months
    4 no sign-off needed
    • 352 Commons Road, Dublin 22, Dublin, D22 K2E4 · 21 Sept 2026 · start notice, opted out no sign-off needed · SD26B/0031W · 107 m
    • 118 Boot Road, Clondalkin, Dublin, D22 K5P6 · 17 Mar 2026 · start notice, opted out no sign-off needed · SD25B/0623W · 233 m
    • 97 Saint John's Wood, Dublin, D22 XY97 · 12 Feb 2026 · start notice, opted out no sign-off needed · SD25B/0232W · 409 m
    • Saint John's Road, Clondalkin, South Dublin, d22x3f9 · 19 Nov 2025 · start notice, opted out no sign-off needed · SD25B/0040W · 354 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 20 Oct 2026, 01:45
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    SDCC Lands @28 Locations——305 m
    St. Johns Road Development4444 built (2026-Q2)312 m
    Corkagh Park——467 m
    Clondalkin Leisure Centre——790 m
    Former Clondalkin Paper Mills Pitch and Putt Club99—861 m
    Clondalkin Enterprise Centre86—976 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Little Gems Childcare · Crèche12 Nov 2025 · report · Tusla Early Years Inspectorate188 m
    Bright Sparks Montessori & Daycare · Crèche21 Aug 2025 · report · Tusla Early Years Inspectorate521 m
    Alpine Kidz · Crèche11 Dec 2024 · report · Tusla Early Years Inspectorate732 m
    footprints montessori & afterschool · Crèche22 Oct 2025 · report · Tusla Early Years Inspectorate869 m
    The Village Day Care & Montessori School Ltd · Crèche23 Apr 2026 · report · Tusla Early Years Inspectorate916 m
    Castle Kids Montessori · Crèche6 Jun 2025 · report · Tusla Early Years Inspectorate978 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of South Dublin County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here53
    Council middle5
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    51% of homes built before 1971 (council 18%). 70% owner-occupied (council 67%).

    Homes built before 1971
    51% · council 18%
    Homes built since 2001
    13% · council 27%
    Owner-occupied
    70% · council 67%
    Rented
    24% · council 29%
    Children under 15
    22% · council 21%
    Aged 65 and over
    13% · council 13%
    Households with 2+ cars
    31% · council 40%
    Work mainly from home
    8% · council 10%
    This small area (273 people)South Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267053012

    Road noise
    60–64 dB
    day–night average (EPA 2022)
    Bus
    318 m
    Saint John's Avenue · 13, 51D, 69 · busiest stop within 500 m: 6 an hour at peak
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Nearest school
    220 m
    Sacred Heart NS, 463 pupils
    Homes sold nearby
    41
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Sacred Heart NS · primary · 463 pupils · 220 m
    • Scoil Naomh Seosamh · primary · 360 pupils · 451 m
    • Scoil Mhuire · primary · 292 pupils · 529 m
    • Scoil Naomh Aine · primary · 222 pupils · 565 m
    • Scoil Naomh Ide · primary · 252 pupils · 593 m
    • Moyle Park College · postprimary · 763 pupils · 705 m
    • Coláiste Bríde · postprimary · 993 pupils · 729 m
    • S N Naomh Eoin · primary · 91 pupils · 909 m

    Stops 43

    • Saint John's Avenue · 13, 51D, 69, 69n · 6/hour at peak · 318 m
    • Brideswell Commons · UM08 · 0/hour at peak · 368 m
    • Oak Way · 69X · 0/hour at peak · 404 m
    • St John's Park East · 13, 51D, 69, 69n, UM08 · 6/hour at peak · 417 m
    • St John's Park East · 13, 51D, 69, UM08 · 6/hour at peak · 418 m
    • Boot Road · 13, 51D, 69, 69n · 6/hour at peak · 425 m
    • Boot Road · 13, 51D, 69 · 6/hour at peak · 436 m
    • Newlands X · 68, UM08, W2 · 4/hour at peak · 464 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Sacred Heart NS · 220 m+0.7% pupils (463)
    • Scoil Naomh Seosamh · 451 m-3.7% pupils (360)
    • Scoil Mhuire · 529 m-3.6% pupils (292)
    • Scoil Naomh Aine · 565 m-1.3% pupils (222)
    • Scoil Naomh Ide · 593 m+0.8% pupils (252)
    • Moyle Park College · 705 m-0.4% pupils (763)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.26 ha · 60 m
    • Dublin City Council · 0.16 ha · 62 m
    • Dublin City Council · 0.23 ha · 82 m
    • Dublin City Council · 1.65 ha · 82 m
    • Dublin City Council · 0.65 ha · 182 m
    • Dublin City Council · 2 ha · 228 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 20 Oct 2026, 02:32
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Council consultation portalsPublic20 Oct 2026, 01:41open
    Council meetings (ModernGov)Public20 Oct 2026, 02:32open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Garden room (S01B/0411) approved 2003: built as approved?
      Ask for: The grant and an opinion of compliance.
      Seller · solicitor
    2. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Clondalkin
    Electoral division
    Clondalkin Village
    Electoral area
    Clondalkin
    Council
    South Dublin County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest S01B/0411, approved 2003, built? unknown.
    • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
    • Nothing nearby looks set to change.
    • St John's Park East (bus 13, 51D) 417 m away: 6 an hour at morning peak; 43 from all stops within 500 m.
    • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 70% owner-occupied (council 66%); 6% of homes empty (council 4%); most built 1946–1960; 45% drive to work (council 54%); population up 3% since 2016.
    • 3 home extensions within 250 m since 2025. Most were single-storey rear extensions.
    • Around here the council decides in a median 55 days (about 8 weeks); 1 in 10 is asked for more information.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.020 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public20 Oct 2026
    www2.courts.ie—© the publisher20 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public20 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.020 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence20 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 20 Oct 2026, 23:48 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.