PlanningRegister.ie
Planning report · South Dublin County Council · 500 m around the house · the last 12 months · 24 Oct 2026, 07:49

Kimmage Road West, Crumlin

53.31455, -6.31327

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (97%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Kimmage Road WestBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2021: 1 file on Kimmage Road West2022: 3 files on Kimmage Road West2023: 2 files on Kimmage Road West2024: 4 files on Kimmage Road West2025: 7 files on Kimmage Road West2026: 7 files on Kimmage Road West24 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RES: To protect and/or improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Leo Laboratories Limited (792 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Radon grid squares6
Monuments4House - 17th/18th century; Windmill
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 89–100% by type. A new house in a garden is harder: 86% approved, and 1 in 3 is asked for more information.

Single-storey rear113 decided · more info asked 16%
100% · council 96%
Two-storey rear50 decided · more info asked 20%
96% · council 99%
Two-storey side27 decided · more info asked 26%
93% · council 94%
Single-storey side19 decided · more info asked 16%
89% · council 94%
Attic or dormer327 decided · more info asked 12%
98% · council 98%
First-floor36 decided · more info asked 22%
94% · council 92%
Garage conversion46 decided · more info asked 17%
98% · council 99%
Porch or front15 decided · more info asked 13%
100% · council 96%
New house in a garden or site37 decided · more info asked 35%
86% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 670 nearby, 2,898 council-wide

Figure 3

Kimmage Road West, file by file since 2021

13 of 13 decided extensions on the road were approved.

24 planning files on Kimmage Road West since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 82 · 2022 · attic conversion / dormer · approved · 4466/22No. 163 · 2022 · attic conversion / dormer · approved · SD22B/0133No. 143 · 2022 · single-storey rear · approved · SD22B/0173No. 61 · 2023 · single-storey rear · approved · SD23B/0394No. 110 · 2024 · single-storey rear · approved · 4358/24No. 20 · 2024 · garage conversion · approved · SD24B/0166No. 61 · 2024 · two-storey side · approved · SD24B/0190No. 91 · 2025 · garage conversion · withdrawn or invalid · 3453/25No. 91 · 2025 · garage conversion · approved · SD25B/0648No. 198 · 2025 · single-storey rear · approved · WEB2375/25No. 91 · 2026 · garage conversion · approved · SD26B/0160No. 55 · 2026 · single-storey rear · approved · SD26B/0299WNo. 63 · 2026 · two-storey rear · undecided · SD26B/0423WNo. 198 · 2026 · attic conversion / dormer · withdrawn or invalid · WEB1547/26No. 170 · 2026 · attic conversion / dormer · approved · WEB1568/26No. 198 · 2026 · attic conversion / dormer · withdrawn or invalid · WEB1618/26No. 198 · 2026 · attic conversion / dormer · approved · WEB2381/26Porches, roofs, otherNo. 59 · 2021 · other work · approved · SD21B/0448No. 188 · 2023 · other work · approved · 3089/23No. 88 · 2024 · other work · approved · 3488/24No. 54 · 2025 · other work · approved · 3085/25No. 59 · 2025 · other work · refused · SD25A/0269WNo. 171 · 2025 · other work · approved · SD25B/0697WNo. 88 · 2025 · two-storey rear · approved · WEB2172/25New house in a side garden
ApprovedRefusedWithdrawn or invalid

24 files with "Kimmage Road West" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 5 within 250 m · 1 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

5 of 5 approved (100%) · most common: dormer or attic

5 approved
KindAppliedApprovedRefused
Dormer or attic33—
Garage conversion11—
Single-storey rear11—

Refused within 100 m 1 in the last 12 months

How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 24 Oct 2026, 02:29
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 3

How long, and what if someone objects?

Figure 4

A home extension's journey here

A decision takes 55 days. 1 in 7 is asked for more information, which adds about 70 days. Building starts about 4 months after permission.

Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 125 days; Appeal window: 4 weeks; If appealed: +132 days; Building starts: 108 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 51–55 (n=588)55 daysIf more info asked (1 in 7)With further information: median 125 days (n=107)125 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 132 days (n=85, all appeals within 1.5 km)+132 daysBuilding startsStart notice: median 108 days after permission (n=324)108 days after permissionSigned off342 days after the start, for the few who file. 54% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated695 decided home extensions, 332 start notices, 85 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 5

What appeals changed

8 of 27 appealed refusals became permissions. 6 of 59 appealed approvals were reversed.

Refusals appealed27 decided
8 became permissions
Approvals appealed59 decided
6 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 1 in the last 12 months

1 of 1 changed the council's decision

  • 500645 Granted · 59, Dangan Park, Kimmage Road West, Dublin 12, D12 YA06 · 95 m report
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 24 Oct 2026, 02:29
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Courts Service legal diary (judicial reviews)© the publisher23 Oct 2026, 23:01open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 4

What's changing around you?

Street map around Kimmage Road West, Crumlin with 15 numbered planning items
⌖ the houseDerelict buildingRefusedBuilding startedApprovedNo decision yet
  1. 111 Royston Dublin 12 D12NE45 DS1615Derelict building · 132 m
  2. 259, Dangan Park SD25A/0269WRefused · 95 m
  3. 3170 Kimmage Road West, Dublin 12 WEB1568/26Building started · 119 m
  4. 428 Shelton Park, Kimmage SD25B/0463WBuilding started · 169 m
  5. 536, Shelton Park SD26B/0332Approved · 95 m
  6. 6171, Kimmage Road West SD25B/0697WApproved · 176 m
  7. 75, Shelton Park SD25B/0708Approved · 202 m
  8. 810, Muckross Green SD25B/0649Approved · 204 m
  9. 941A, Dangan Park SD26B/0232WApproved · 223 m
  10. 1034, Whitehall Road West SD26B/0120WApproved · 258 m
  11. 11198, Kimmage Road West WEB2381/26Approved · 283 m
  12. 1291, Kimmage Road West SD26B/0160Approved · 287 m
  13. 13Former Submarine Bar Public House, Cromwellsfort Road SD26A/0234WNo decision yet · 307 m
  14. 1454 Hillsbrook Avenue, Perrystown SD26B/0342WApproved · 318 m
  15. 151, Hillsbrook Drive SD25B/0650Approved · 328 m
Figure 6

What happens to applications within 500 m

Permission isn't building. Of 99 permissions since 2016, 50 show a start notice and 2 have a completion certificate. Most owners opt out of sign-off.

116 applications lodged within 500 m. Council: 97 approved, 7 refused. After appeals: 99 approved. Of those: 2 signed off, 31 built with the owner's opt-out, 17 started, 46 with no start notice found, 3 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT97: lodged → approved7: lodged → refused8: lodged → withdrawn or invalid4: lodged → undecided96: approved → approved4: refused → refused8: withdrawn or invalid → withdrawn4: undecided → undecided1 approved by the council, refused after an appeal3 refused by the council, approved after an appeal46: approved → no start notice found31: approved → built, owner opted out17: approved → started, not signed off2: approved → signed off3: approved → ran out116 lodged116 lodged97 approved97 approved7 refused7 refused8 withdrawn or invalid8 withdrawn or invalid4 undecided4 undecided99 approved99 approved5 refused5 refused8 withdrawn8 withdrawn4 undecided4 undecided46 no start notice found46 no start notice found31 built, owner opted out31 built, owner opted out17 started, not signed off17 started, not signed off2 signed off2 signed off3 ran out3 ran out

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured116 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 7

The next 30 days

Nothing closes within 500 m in the next 30 days.

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 1 within 500 m

    Derelict building 1

    • 111 Royston Dublin 12 D12NE45 · derelict since Jun 2023 · 132 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 24 Oct 2026, 02:46
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    Council meetings (ModernGov)Public24 Oct 2026, 02:46open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 8

    Applications within 500 m, by year

    Between 17 and 24 a year; busiest 2023. 93% of decisions were approvals.

    2021: 20, 2022: 18, 2023: 24, 2024: 17, 2025: 22, 2026: 1501020302021: 15 approved2021: 2 refused2021: 3 withdrawn or invalid20’21*2022: 17 approved2022: 1 withdrawn or invalid18’222023: 23 approved2023: 1 refused24’232024: 15 approved2024: 1 refused2024: 1 withdrawn or invalid17’242025: 19 approved2025: 2 refused2025: 1 withdrawn or invalid22’252026: 8 approved2026: 1 refused2026: 2 withdrawn or invalid2026: 4 undecided15’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 25 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    Building work nearby 9 in the last 12 months
    1 not signed off8 no sign-off needed
    • 47 Hillsbrook Drive, Dublin · 29 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · SD25A/0059W · 223 m
    • 35 Muckross Green, Dublin 12, Dublin · 30 Sept 2026 · 2 homes · start notice not signed off · SD25A/0164 · 286 m
    • 73 Beechfield Road, Dublin 12, Dublin, D12 YK07 · 29 Jun 2026 · short notice no sign-off needed · SD25B/0706W · 466 m
    • 3170 Kimmage Road West, Dublin 12, D12 AC80 · 26 Jun 2026 · start notice, opted out no sign-off needed · WEB1568/26 · 119 m
    • 88 Rockfield Avenue, Dublin, D12 DW64 · 12 Jun 2026 · start notice, opted out no sign-off needed · SD25B/0718W · 401 m
    • 428 Shelton Park, Kimmage, South Dublin, D12 RW27 · 27 Apr 2026 · start notice, opted out no sign-off needed · SD25B/0463W · 169 m
    • 5 Shelton Park, Kimmage, South Dublin, D12 RR96 · 16 Apr 2026 · start notice, opted out no sign-off needed · SD25B/0708 · 211 m
    • 10 Muckross Green, South Dublin, D12 XY38 · 15 Apr 2026 · start notice, opted out no sign-off needed · SD25B/0649 · 212 m
    • 18 Muckross Green, Perrystown, South Dublin, D12 WN59 · 13 Jan 2026 · short notice no sign-off needed · SD25B/0498W · 168 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Carlisle, Kimmage Road West145— (2025-Q3)36 m
    Lighting & Electrical Distribution Group Ltd Factory Complex50—520 m
    Former Lighting & Electrical Distribution Group Factory59—520 m
    Little John Centre2020 built (2025-Q1)564 m
    Crumlin Delivery Service Unit53—654 m
    Glebe House and Coruba House Site146146 not started (2026-Q2)722 m
    Ravensdale Close26no activity on site reported (2026-Q2)870 m
    Melville House3232 not started (2026-Q2)954 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Cocoon Childcare - Kimmage · Crèche24 Apr 2026 · report · Tusla Early Years Inspectorate206 m
    Happy Phases Pre- School · Crèche1 Apr 2026 · report · Tusla Early Years Inspectorate218 m
    Wonder Years · Crèche8 May 2023 · report · Tusla Early Years Inspectorate587 m
    Chestnut Daycare · Crèche3 Dec 2024 · report · Tusla Early Years Inspectorate701 m
    Amazing Minds Montessori · Crèche22 Sept 2025 · report · Tusla Early Years Inspectorate711 m
    Ups A Daisy Childcare · Crèche7 Aug 2025 · report · Tusla Early Years Inspectorate853 m
    Crumlin Childcare Centre · Crèche3 Feb 2026 · report · Tusla Early Years Inspectorate984 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 24 Oct 2026, 02:29
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of South Dublin County Council.
    Homes approved
    Here165
    Council middle0
    Homes started
    Here310
    Council middle4
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    84% of homes built before 1971 (council 18%). 91% owner-occupied (council 67%).

    Homes built before 1971
    84% · council 18%
    Homes built since 2001
    0% · council 27%
    Owner-occupied
    91% · council 67%
    Rented
    4% · council 29%
    Children under 15
    16% · council 21%
    Aged 65 and over
    26% · council 13%
    Households with 2+ cars
    37% · council 40%
    Work mainly from home
    21% · council 10%
    This small area (218 people)South Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267156001

    Bus
    60 m
    Royston Village · F3, S4 · busiest stop within 500 m: 14 an hour at peak
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    536 m
    St Damiens Ns, 231 pupils
    Homes sold nearby
    77
    in 3 years, 23 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Damiens Ns · primary · 231 pupils · 536 m
    • Rosary College · postprimary · 250 pupils · 601 m
    • Scoil Úna Naofa · primary · 356 pupils · 748 m
    • Scoil Eoin · primary · 142 pupils · 748 m
    • Our Lady of Hope School · primary · 45 pupils · 843 m

    Stops 58

    • Royston Village · F3, S4 · 10/hour at peak · 60 m
    • Westbrook · F3, S4 · 11/hour at peak · 134 m
    • Westbrook · F3, S4 · 10/hour at peak · 170 m
    • Ashleaf · F3, S4 · 11/hour at peak · 248 m
    • Ashleaf · 150, 82 · 6/hour at peak · 290 m
    • Ashleaf SC · 150, 82 · 8/hour at peak · 296 m
    • L O'Toole Pk · F3, S4 · 11/hour at peak · 303 m
    • Ashleaf · 150, 27, 82, S4 · 14/hour at peak · 346 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Damiens Ns · 536 m-0.4% pupils (231)
    • Rosary College · 601 m+11.1% pupils (250)
    • Scoil Eoin · 748 m+2.9% pupils (142)
    • Scoil Úna Naofa · 748 m-1.4% pupils (356)
    • Our Lady of Hope School · 843 m0% pupils (45)

    Open consultations

    Council meetings 25 items

    Public land

    • Dublin City Council · 3.57 ha · 130 m
    • Dublin City Council · 0.14 ha · 214 m
    • Dublin City Council · 0.7 ha · 220 m
    • Dublin City Council · 0.42 ha · 315 m
    • Dublin City Council · 0.11 ha · 357 m
    • Dublin City Council · 0.32 ha · 416 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 24 Oct 2026, 02:46
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
    Council consultation portalsPublic24 Oct 2026, 01:49open
    Council meetings (ModernGov)Public24 Oct 2026, 02:46open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Crumlin
    Electoral division
    Terenure-Greentrees
    Electoral area
    Rathfarnham-Templeogue
    Council
    South Dublin County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
    • 1 site nearby could change: 1 derelict.
    • 1 application refused within 100 m since 2025; latest a new house (2025), granted on appeal.
    • Ashleaf (bus 150, 27) 346 m away: 14 an hour at morning peak; 107 from all stops within 500 m.
    • Here (2022 census): 91% owner-occupied (council 66%); 3% of homes empty (council 4%); most built 1946–1960; 43% drive to work (council 54%); population up 3% since 2016.
    • 5 home extensions within 250 m since 2025: 5 approved (100%). Most were dormers or attic conversions.
    • Around here the council decides in a median 54 days (about 8 weeks); 1 in 5 is asked for more information.
    • Homes started within 1 km: 94 in the last year, 30 three years before.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.024 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public24 Oct 2026
    www2.courts.ie—© the publisher23 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public24 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.024 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence24 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 24 Oct 2026, 07:49 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.