Shelton Park, Crumlin
Homes here mostly date from the 1950s. 4 planning files on this house, the latest from 2017. Home extensions nearby almost always get approved (96%).
How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 55 days
- 4Appeal window4 weeks after the decision
- 5AppealHere about 4 months
- 6PermissionLasts 5 years
- 7StartStart notice to the council. Here about 4 months after
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built 1946–60, before planning permission was needed. 4 planning files on this house, the latest from 2017.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
- 2017SD17B/0001 · attic or dormer · approved 2017 · started, no sign-off neededapprovedstartedsigned off?
- 2007ED07/0003 · new house · other decisionapproved?started?signed off?
- 2006SD05B/0667 · extension · approved 2006 · built? unknownapprovedstarted?signed off?
- 2004SD04B/0304 · extension · withdrawnapproved?started?signed off?
Zoning, protection, tax and flood: the detail
What it says
RES: To protect and/or improve residential amenity
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028
Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Licensed industrial sites within 1.0 km: Leo Laboratories Limited (834 m)
| Within 500 m | Count | For example |
|---|---|---|
| Radon grid squares | 6 | |
| Monuments | 4 | House - 17th/18th century; Windmill |
How we work this out
Sources: zoning, constraints.epa_licence, constraints.radon, rzlt, constraints, constraints.flood_cfram, constraints.smr · fetched 11 Oct 2026, 23:18
| Source | Licence | Fetched | Link |
|---|---|---|---|
| zoning | CC-BY-4.0 | 11 Oct 2026, 23:18 | open |
| constraints.epa_licence | CC-BY-4.0 | 27 Sept 2026, 19:36 | open |
| constraints.radon | CC-BY-4.0 | 27 Sept 2026, 19:36 | open |
| rzlt | CC-BY-4.0 | 12 Oct 2026, 00:14 | open |
| constraints | mixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false) | 27 Sept 2026, 19:37 | open |
| constraints.flood_cfram | CC-BY-NC-ND-4.0 · not redistributable — shown as a flag only | 11 Sept 2026, 19:11 | open |
| constraints.smr | CC-BY-4.0 | 27 Sept 2026, 19:29 | open |
How we work this out
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
Extensions are almost always approved here: 90–100% by type. A new house in a garden is harder: 83% approved, and 1 in 2 is asked for more information.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 988 nearby, 4,892 council-wide
Shelton Park, file by file since 2000
20 of 21 decided extensions on the road were approved.
24 files with "Shelton Park" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.
MeasuredOur classificationcouncil register via NPAD · 2000–2026
Extensions and refusals right beside you 8 within 250 m · 1 refused within 100 m
Extensions and refusals near you 8 extensions within 250 m · the last 12 months
7 of 8 approved (88%) · most common: dormer or attic
| Kind | Applied | Approved | Refused |
|---|---|---|---|
| Dormer or attic | 3 | 3 | — |
| Garage conversion | 2 | 2 | — |
| Single-storey rear | 2 | 2 | — |
| Side | 1 | 0 | 1 |
Refused within 100 m 1 in the last 12 months
- SD25A/0269W · new house · refused 12 Dec 2025 · 82 m appeal granted inspector's report
How we work this out
How long, and what if someone objects?
A home extension's journey here
A decision takes 55 days. 1 in 6 is asked for more information, which adds about 72 days. Building starts about 4 months after permission.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated1007 decided home extensions, 470 start notices, 129 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
What appeals changed
18 of 46 appealed refusals became permissions. 8 of 85 appealed approvals were reversed.
Every appeal decided within 1.5 km in 10 years, any kind of development.
CalculatedAn Coimisiún Pleanála cases linked to the council file
Appeals nearby 1 in the last 12 months
1 of 1 changed the council's decision
What's changing around you?
- 114, Shelton Gardens SD26B/0355W
- 211 Royston Dublin 12 D12NE45 DS1615
- 359, Dangan Park SD25A/0269W
- 441A, Dangan Park SD25B/0514W
- 5170 Kimmage Road West, Dublin 12 WEB1568/26
- 628 Shelton Park, Kimmage SD25B/0463W
- 736, Shelton Park SD26B/0332
- 8171, Kimmage Road West SD25B/0697W
- 910, Muckross Green SD25B/0649
- 101, Dangan Park SD25A/0177
- 1134, Whitehall Road West SD26B/0120W
- 125, Shelton Park SD25B/0708
- 13198, Kimmage Road West WEB2381/26
- 1454 Hillsbrook Avenue, Perrystown SD26B/0342W
- 1535, Muckross Green SD25A/0164
What happens to applications within 500 m
Permission isn't building. Of 150 permissions since 2016, 70 show a start notice and 5 have a completion certificate. Most owners opt out of sign-off.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured175 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
The next 30 days
1 deadline within 500 m; the first closes 21 Oct 2026.
- Time to appeal ends 21 Oct 20268 days left1SD26B/0355W · Request Additional Information — Two-storey extension to the side and rear; A single-storey extension to the rear;…€220 to An Coimisiún Pleanála (€110 observer) · 387 m away
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Sites that could change 1 within 500 m
Derelict building 1
- 211 Royston Dublin 12 D12NE45 · derelict since Jun 2023 · 175 m
Sources: acp, bcms, derelict, moderngov, npad, rzlt · fetched 9 Oct 2026, 23:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| acp | CC-BY-4.0 | 9 Oct 2026, 23:03 | open |
| bcms | CC-BY-4.0 | 13 Oct 2026, 00:21 | open |
| derelict | CC-BY-4.0 | 12 Oct 2026, 23:08 | open |
| moderngov | public | 13 Oct 2026, 01:29 | open |
| npad | CC-BY-4.0 | 13 Oct 2026, 01:45 | open |
| rzlt | CC-BY-4.0 | 12 Oct 2026, 00:14 | open |
Applications within 500 m, by year
Between 10 and 24 a year; busiest 2023. 92% of decisions were approvals.
2016 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Every application within 500 m 27 in the last 12 months
See every application on the map
- 49 Hillsbrook Avenue, Dublin 12, D12 H36W, D12 H36W No decision yetThe provision of a 3.5m wide vehicular entrance to the front of the property.
- 114, Shelton Gardens, Kimmage, Dublin 12, D12 WE27 No decision yetTwo-storey extension to the side and rear; A single-storey extension to the rear; Refurbishment of existing…
- 1454 Hillsbrook Avenue, Perrystown, Dublin, D12E261 ApprovedConstruction of new driveway to the front of the property; Works will include the dishing of the existing…
- 736, Shelton Park, Kimmage, Dublin 12 ApprovedExtension to the rear of the existing detached dwelling and part conversion of the existing garage &…
- 6, Shelton Gardens, Kimmage, Dublin, D12 VK73 Section 5: exemptConstruction of a single-storey flat roof extension measuring approx. 33m2. Relocation of one existing rear…
- 35 Shelton Drive, Kimmage, Dublin, D12 EK44 RefusedDemolish garage; Construct a single-storey side extension; Add door and windows to the rear extension, and…
- 13198, Kimmage Road West, Dublin 12 ApprovedConversion of existing attic space comprising of modification to the existing roof structure, new access…
- 41A, Dangan Park, Kimmage, Dublin 12, D12A259 ApprovedNew ground floor extension to side/rear of existing dwelling to allow family ancillary accommodation with…
- 91, Kimmage Road West, Dublin 12 ApprovedRetention Planning for the construction of single storey extension to the rear. second storey extension to…
- 250, Captain's Road, Dublin 12, D12E9X4 ApprovedRETENTION: The development consists of the construction of a lean-to timber structure to the (north-west)…
- 1134, Whitehall Road West, Perrystown, Dublin 12, D12C3KR ApprovedThe retention of the single storey side and rear extension with flat roof and roof windows.
- 198, Kimmage Road West, Kimmage, Dublin 12 Withdrawn or not validConversion of existing attic space comprising of modification to the existing roof structure, new access…
- 170 Kimmage Road West, Kimmage, Dublin 12, D12AC80 ApprovedThe development will consist of the construction of a single storey rear extension (64sq.m) for kitchen,…
- 198, Kimmage Road West, Kimmage, Dublin 12, D12 CA33 Withdrawn or not validConversion of existing attic space comprising of modification to the existing roof structure, new access…
- 1, Hillsbrook Drive, Perrystown, Dublin 12 ApprovedA) The construction of a single storey extension to the front. B) The replacement of existing roof and…
- 1535, Muckross Green, Perrystown, Dublin 12 ApprovedThe development shall consist of 2 No.two storey semidi detached dwelling houses in side garden of existing…
- 88, Rockfield Avenue, Perrystown, Dublin 12, D12 DW64 ApprovedPermission for the construction of a brick clad ground floor single-storey extension to the rear with flat…
- 73, Beechfield Road, Walkinstown, Dublin 12, D12 YK07 Approvedplanning permission for conversion of existing attic to non-habitable space including dormer & Velux to front…
- 125, Shelton Park, Kimmage, Dublin 12, D12 RR96 ApprovedDemolish existing attached garage and old kitchen extension to left side of home and rear chimney. Construct…
- 8171, Kimmage Road West, Dublin, 12, D12AC95 ApprovedInternal layout modifications and change of use of existing garage to habitable space, including alteration…
- 101, Dangan Park, Perrystown, Dublin 12, D12 TD61 ApprovedTo convert the existing garage/store to the side of the existing detached bungalow and part existing bungalow…
- 910, Muckross Green, Perrystown, Dublin 12 ApprovedPlanning permission sought for, to demolish existing garage to the side of the existing two storey end of…
- 91, Kimmage Road West, Dublin 12 ApprovedFor the construction of a single-storey extension to the rear, two storey extension to the side, conversion…
- 91 kimmage Road West, Dublin 12, D12X659 Withdrawn or not validRETENTION : Retention planning permission for the construction of a single storey extension to the rear , two…
- 359, Dangan Park, Kimmage Road West, Dublin 12, D12 YA06 RefusedPlanning Permission for (1) The demolition of the existing garage building attached to the side of the…
- 441A, Dangan Park, Kimmage, Dublin 12, D12 A259 RefusedNew ground floor extension to side of existing dwelling to allow family ancillary accommodation with internal…
- 1, Beechfield Close, Dublin, D12CD78 ApprovedPlanning permission for the following: To demolish the existing side extension, construct a new extension to…
How we work this out
Building work nearby 8 in the last 12 months
- 35 Muckross Green, Dublin 12, Dublin · 30 Sept 2026 · 2 homes · start notice not signed off · SD25A/0164 · 306 m
- 73 Beechfield Road, Dublin 12, Dublin, D12 YK07 · 29 Jun 2026 · short notice no sign-off needed · SD25B/0706W · 424 m
- 5170 Kimmage Road West, Dublin 12, D12 AC80 · 26 Jun 2026 · start notice, opted out no sign-off needed · WEB1568/26 · 108 m
- 88 Rockfield Avenue, Dublin, D12 DW64 · 12 Jun 2026 · start notice, opted out no sign-off needed · SD25B/0718W · 404 m
- 628 Shelton Park, Kimmage, South Dublin, D12 RW27 · 27 Apr 2026 · start notice, opted out no sign-off needed · SD25B/0463W · 158 m
- 5 Shelton Park, Kimmage, South Dublin, D12 RR96 · 16 Apr 2026 · start notice, opted out no sign-off needed · SD25B/0708 · 235 m
- 10 Muckross Green, South Dublin, D12 XY38 · 15 Apr 2026 · start notice, opted out no sign-off needed · SD25B/0649 · 208 m
- 18 Muckross Green, Perrystown, South Dublin, D12 WN59 · 13 Jan 2026 · short notice no sign-off needed · SD25B/0498W · 175 m
How we work this out
Source: bcms · fetched 13 Oct 2026, 00:21
| Source | Licence | Fetched | Link |
|---|---|---|---|
| bcms | CC-BY-4.0 | 13 Oct 2026, 00:21 | open |
Homes coming 0 not started
- 21 Whitehall Road West · 14 homes · building started · 352 m
How we work this out
Named places nearby: estate, schemes, crèches, schools
Named places estate, developments, inspections
Developments within 1.0 km
| Scheme | Homes | Progress | Distance |
|---|---|---|---|
| Carlisle, Kimmage Road West | 208 | 208 not started (2026-Q2) | 59 m |
| Lighting & Electrical Distribution Group Ltd Factory Complex | 50 | — | 483 m |
| Former Lighting & Electrical Distribution Group Factory | 59 | — | 483 m |
| Little John Centre | 20 | 20 built (2025-Q1) | 523 m |
| Crumlin Delivery Service Unit | 53 | — | 644 m |
| Glebe House and Coruba House Site | 146 | 146 not started (2026-Q2) | 701 m |
| Tymon North | — | — | 771 m |
| Former Eircom Training Centre | 376 | — | 812 m |
Crèches and schools inspected
| Name | Latest inspection | Distance |
|---|---|---|
| Happy Phases Pre- School · Crèche | 1 Apr 2026 · report · Tusla Early Years Inspectorate | 191 m |
| Cocoon Childcare - Kimmage · Crèche | 24 Apr 2026 · report · Tusla Early Years Inspectorate | 241 m |
| Wonder Years · Crèche | 8 May 2023 · report · Tusla Early Years Inspectorate | 551 m |
| Chestnut Daycare · Crèche | 3 Dec 2024 · report · Tusla Early Years Inspectorate | 691 m |
| Amazing Minds Montessori · Crèche | 22 Sept 2025 · report · Tusla Early Years Inspectorate | 710 m |
| Ups A Daisy Childcare · Crèche | 7 Aug 2025 · report · Tusla Early Years Inspectorate | 828 m |
| Crumlin Childcare Centre · Crèche | 3 Feb 2026 · report · Tusla Early Years Inspectorate | 986 m |
How we work this out
Sources: dublin_pipeline, npad, schools, tusla_ey · fetched 12 Oct 2026, 23:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| dublin_pipeline | CC-BY-4.0 | 12 Oct 2026, 23:02 | open |
| npad | CC-BY-4.0 | 13 Oct 2026, 01:45 | open |
| schools | CC-BY-4.0 | 27 Sept 2026, 23:32 | open |
| tusla_ey | public (Tusla statutory register; acknowledgement required, no open licence stated) | 5 Oct 2026, 23:33 | open |
How busy is this area Busier than most of South Dublin County Council.
How we work this out
What's the area like?
This street block against the council
84% of homes built before 1971 (council 18%). 91% owner-occupied (council 67%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267156001
Schools, stops and the council
Schools
- St Damiens Ns · primary · 231 pupils · 492 m
- Rosary College · postprimary · 250 pupils · 630 m
- Scoil Eoin · primary · 142 pupils · 774 m
- Scoil Úna Naofa · primary · 356 pupils · 774 m
- Our Lady of Hope School · primary · 45 pupils · 868 m
Stops 54
- Royston Village · F3, S4 · 10/hour at peak · 61 m
- Westbrook · F3, S4 · 11/hour at peak · 178 m
- Westbrook · F3, S4 · 10/hour at peak · 212 m
- Ashleaf · F3, S4 · 11/hour at peak · 217 m
- Ashleaf · 150, 82 · 6/hour at peak · 254 m
- Ashleaf SC · 150, 82 · 8/hour at peak · 256 m
- Ashleaf · 150, 27, 82, S4 · 14/hour at peak · 318 m
- Ashleaf · F3 · 3/hour at peak · 327 m
Schools growing or shrinking planning in 3 years · pupils last year
- St Damiens Ns · 492 m-0.4% pupils (231)
- Rosary College · 630 m+11.1% pupils (250)
- Scoil Eoin · 774 m+2.9% pupils (142)
- Scoil Úna Naofa · 774 m-1.4% pupils (356)
- Our Lady of Hope School · 868 m0% pupils (45)
Open consultations
Council meetings 25 items
- 13 Oct 2026 · That this ACM asks the Chief Executive to consider enhancing playgrounds for younger kids below the…
- 8 Sept 2026 · To ask for an update in connection with the installation of the EV charging points at the car park…
- 9 Jun 2026 · This Committee requests that the potholes (including one adjacent to a manhole cover) on…
- 12 May 2026 · To ask for an update in relation to the proposed flood walls at Woodview Cottages, Rathfarnham
- 12 May 2026 · To ask the Chief Executive to advise on the delay in repairing Solar Powered Lights at the…
- 11 May 2026 · KNOCKLYON TO BALLYBODEN ACTIVE AND SUSTAINABLE TRAVEL SCHEME PART 8 - FOR APPROVAL
- 28 Apr 2026 · That this Area Committee requests the Chief Executive to bring forward proposals in relation to the…
- 14 Apr 2026 · Could the ramp outside house 27 Anne Devlin Road, Rathfarnham be resurfaced as it is has become…
Public land
- Dublin City Council · 3.57 ha · 153 m
- Dublin City Council · 0.7 ha · 207 m
- Dublin City Council · 0.14 ha · 251 m
- Dublin City Council · 0.11 ha · 339 m
- Dublin City Council · 0.42 ha · 358 m
- Dublin City Council · 0.32 ha · 389 m
Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
| Source | Licence | Fetched | Link |
|---|---|---|---|
| gtfs | CC-BY-4.0 | 11 Oct 2026, 23:43 | open |
| schools | CC-BY-4.0 | 27 Sept 2026, 23:32 | open |
| npad | CC-BY-4.0 | 13 Oct 2026, 01:45 | open |
| consult | public | 13 Oct 2026, 01:29 | open |
| moderngov | public | 13 Oct 2026, 01:29 | open |
| lda_lands | CC-BY-4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- Attic or dormer (SD17B/0001) built without official sign-off: built properly?Seller · solicitorAsk for: An engineer's opinion of compliance.
- Extension (SD05B/0667) approved 2006: built as approved?Seller · solicitorAsk for: The grant and an opinion of compliance.
- High radon area (1 in 10 homes): has it been tested?SellerAsk for: Radon test results.
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Townland
- Crumlin
- Electoral division
- Terenure-Greentrees
- Electoral area
- Rathfarnham-Templeogue
- Council
- South Dublin County Council
Everything we found, as a list 8 lines
- 4 applications on this site; latest SD17B/0001, approved 2017, started, no sign-off needed.
- Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
- 1 site nearby could change: 1 derelict.
- 1 application refused within 100 m since 2025; latest a new house (2025), granted on appeal.
- Ashleaf (bus 150, 27) 318 m away: 14 an hour at morning peak; 98 from all stops within 500 m.
- Here (2022 census): 91% owner-occupied (council 66%); 3% of homes empty (council 4%); most built 1946–1960; 43% drive to work (council 54%); population up 3% since 2016.
- 8 home extensions within 250 m since 2025: 7 approved (88%). Most were dormers or attic conversions. 1 side extension refused.
- Around here the council decides in a median 48 days (about 7 weeks); 1 in 5 is asked for more information.
What the terms mean 7 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
- Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 30
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC-BY-4.0 | 9 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC-BY-4.0 | 12 Oct 2026 |
| data.gov.ie | Various (see each layer) | mixed — CC-BY-4.0 except OPW flood (CC… | 27 Sept 2026 |
| gis.epa.ie | Environmental Protection Agency | CC-BY-4.0 | 27 Sept 2026 |
| s3.eu-west-1.amazonaws.com | Office of Public Works | CC-BY-NC-ND-4.0 · flag only | 11 Sept 2026 |
| gis.epa.ie | Environmental Protection Agency | CC-BY-4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR) | CC-BY-4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | https: | Local authorities (consultation portals) | public | 13 Oct 2026 |
| www2.courts.ie | — | all-rights-reserved | 13 Oct 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC-BY-4.0 | 12 Oct 2026 |
| services.arcgis.com | Dublin local authorities (housing delivery pipeline) | CC-BY-4.0 | 12 Oct 2026 |
| esbnetworks.ie | — | all-rights-reserved (esbnetworks.ie di… · flag only | 11 Sept 2026 |
| transportforireland.ie | National Transport Authority | CC-BY-4.0 | 11 Oct 2026 |
| lda.ie | Land Development Agency | CC-BY-4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | public | 13 Oct 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC-BY-4.0 | 13 Oct 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC-BY-4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC-BY-4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | PSI — PSRA re-use terms (psr.ie/re-use… | 13 Oct 2026 |
| services.arcgis.com | Local authorities (RZLT maps) | CC-BY-4.0 | 11 Oct 2026 |
| gov.ie | Department of Education | CC-BY-4.0 | 27 Sept 2026 |
| gov.ie | Department of Housing | CC-BY-SA-4.0 | 9 Oct 2026 |
| tusla.ie | Tusla (Early Years Inspectorate) | public (Tusla statutory register; ackn… | 5 Oct 2026 |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC-BY-4.0 | 11 Oct 2026 |