Planning Register
Site report · 500 m radius · generated 13 Sept 2026, 07:28

L1019

Eircode Coordinates 53.31881, -6.83426Local authority Kildare County Council
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

What closes soonest 0 open windows

No observation, appeal or consultation window is open within 500 m today.

    Sources: acp, consult, moderngov, npad, rzlt · fetched 12 Sept 2026, 00:05
    SourceLicenceFetchedLink
    acpCC-BY-4.012 Sept 2026, 00:05open
    consultpublic12 Sept 2026, 02:04open
    moderngovpublic12 Sept 2026, 21:48open
    npadCC-BY-4.012 Sept 2026, 20:38open
    rzltCC-BY-4.012 Sept 2026, 00:23open

    Where this is

    Local authority
    Kildare County Council
    Sources: places, parcels · fetched 11 Sept 2026, 21:28
    SourceLicenceFetchedLink
    placesCC-BY-4.011 Sept 2026, 21:28open
    parcelsCC-BY-4.011 Sept 2026, 19:06open

    Zoning evaluated against the point

    No zoning objective covers this site in the current plan (or the plan is not loaded for this county).

    Source: zoning · fetched 12 Sept 2026, 02:04
    SourceLicenceFetchedLink
    zoningCC-BY-4.012 Sept 2026, 02:04open

    Designations and constraints within 500 m

    No OPW CFRAM/NIFM flood extent within 500 m.

    No SAC, SPA, NHA, protected structure, monument, ACA, TPO or other designation within 500 m.

    Source: constraints · fetched 11 Sept 2026, 19:11
    SourceLicenceFetchedLink
    constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)11 Sept 2026, 19:11open

    Residential Zoned Land Tax

    This site is not on the current draft or final RZLT map.

    Source: rzlt · fetched 12 Sept 2026, 00:23
    SourceLicenceFetchedLink
    rzltCC-BY-4.012 Sept 2026, 00:23open

    Planning applications 8 in 5 years within 500 m

    Recent decisions and applications

    4
    N/a
    3
    Conditional
    1
    Refused
    • Corduff , Coill Dubh N/a
      dormer construct bungalow, domestic garage, Oakstown wastewater treatment system, shared entrance and all associated works and services
      2632received 12 Mar 20261 units0 m away
    • Corduff , Coill Dubh N/a
      construct bungalow. domestic garage, Oakstown wastewater treatment system, shared entrance and all associated works and services
      2631received 12 Mar 20261 units12 m away
    • Coolcarrigan , Timahoe West , Co. Kildare Conditional
      for an amendment to the granted planning (Planning Reference: 221203) which comprised consent for a solar PV energy development and battery storage compound at Coolcarrigan, Timahoe West, Co. Kildare. Proposed amendments include; (1) An increase in the quantum of energy export that the solar park can produce from 80MW to up to 120MW (2) an amendment to the wording of the battery energy storage from 80MWh to up to 80MW, which amends the power output from the energy capacity to the rated power, to provide battery energy storage to greater flexibility in how it imports and exports the electricity to the grid (3) clarification of adjacent permitted development 15/1172 (extension of duration under 20/1052) increasing the energy export from 15MW to upp to 19.4MW)
      2360073received 28 Jul 2023decided 20 Sept 2023422 m away
    • Coolcarrigan , Timahoe West , Co. Kildare N/a
      Coolcarrigan Farm Limited intend to apply for an amendment to the granted planning (Planning Reference: 221203) which comprised consent for a solar PV energy development and battery storage compound at Coolcarrigan, Timahoe West, Co. Kildare. Proposed amendments include; (1) The quantum of energy export of up to 120MW (2) quantum of energy export of up to 80MW (3) Clarification of energy export (of up to 19.5MW, no battery storage) of adjacent permitted development 15/1172 (extension of duration under 20/1052);
      2360049received 19 Jul 2023422 m away
    • Coolcarrigan , Timahoe West , Co. Kildare. Conditional
      for a 10-year permission, for the construction and operation of a renewable energy development within a site boundary of c. 114 ha. The proposed development will consist of a development area of circa 71.7 ha including solar on fixed on ground mounted frames with a maximum height of 3 metres, 1 No. battery storage compound, 1 No. customer switchgear container, 1 No. 110kv grid connected single storey substation, 1 No. single storey customer substation and all associated electrical plant, inverter units, electrical transformers, battery units, cooling equipment, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, upgrading of existing access road and new internal access roads and all associated ancillary activities. The proposed development will have a 35-year operational life from the date of commissioning. Revised by significant further information which consists of Provision of quantum of energy export (of up to 80MW) in the proposed development and storage capacity of proposed battery compound (of up to 80MWh). Clarification of energy export (of up to 15MW, no battery storage) of adjacent permitted development 15/1172 (extension of duration under 20/1052); Submission of details of adjacent permitted development 15/1172 (extension of duration under 20/1052); Provision of details of minor works to site entrance, construction traffic warning signage to public roadway, at proposed site entrance and also within internal haul routes; Clarification of extent of private roadway (haul roads) within the site; Provision of a fire risk assessment of hazards for on or near the solar array and battery storage compound; Provision of programme/schedule of works for proposed development and adjacent permitted development 15/1172 (extension of duration under 20/1052; Provision of amended Archaeological Impact Assessment. Provision of draft Construction Traffic Management Plan; Provision of Independent Road Safety Audit Stage 1/2; Provision of amended preliminary Construction and Environment Management Plan; Provision of Preliminary Public Liaison Engagement Plan
      221203received 7 Oct 2022decided 12 May 2023422 m away
    • Corduff , Coill Dubh , Co. Kildare. Refused
      To construct bungalow, domestic garage, Oakstown wastewater treatment system and percolation area, shared entrance and access and all associated works and services
      221200received 6 Oct 2022decided 29 Nov 20221 units207 m away
    • Coolcarrigan , Timahoe West , Co. Kildare N/a
      a 10 year permission for the erection and operation of a solar photovoltaic energy development. The proposed development will consist of fixed solar panels and battery storage over an area of c.114ha. The development will include solar panels of max height of 3 metres. 1 no. battery storage compound and battery storage units, customer switchgear container. 1 no. 110kV grid connected single storey substation. 1 no. single storey customer substation and all associated electrical plant, electrical transformer and inverter units, cooling equipment, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, upgrading of existing access road and new internal access roads and all associated ancillary activities. The proposed development will have a 35 year operational life from the date of commissioning
      221132received 16 Sept 2022422 m away
    • Corduff , Coill Dubh , Co. Kildare. Conditional
      sought for garage with first floor storage all for domestic use
      22211received 28 Feb 2022decided 20 Apr 202298 m away

    `description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.

    Source: npad · fetched 12 Sept 2026, 20:38
    SourceLicenceFetchedLink
    npadCC-BY-4.012 Sept 2026, 20:38open

    Appeals 0 in 5 years within 500 m

    No appeal to An Coimisiún Pleanála within 500 m in 5 years.

      Source: acp · fetched 12 Sept 2026, 00:05
      SourceLicenceFetchedLink
      acpCC-BY-4.012 Sept 2026, 00:05open

      Commencement notices 0 in 3 years within 500 m

      No commencement notice lodged with the Building Control Management System nearby.

        One notice can cover many buildings — count notices, never building rows, or a single multi-unit scheme reads as a trend (T11).

        Source: bcms · fetched 12 Sept 2026, 23:34
        SourceLicenceFetchedLink
        bcmsCC-BY-4.012 Sept 2026, 23:34open

        Sales 0 in 36 months within 500 m

        No Property Price Register sale geocoded within 500 m in 36 months.

        Sources: cara_listings, ppr · fetched 11 Sept 2026, 20:14
        SourceLicenceFetchedLink
        cara_listingsThird-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.11 Sept 2026, 20:14open
        pprPSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.'12 Sept 2026, 20:31open

        Consultations 0 matched by place

        No open council consultation covers this place.

          Source: consult · fetched 12 Sept 2026, 02:04
          SourceLicenceFetchedLink
          consultpublic12 Sept 2026, 02:04open

          Council items 0 in 24 months

          No committee item is geolinked to this place. Council minutes are linked at county or electoral-area level, so this is usually empty for a single house.

            Source: moderngov · fetched 12 Sept 2026, 21:48
            SourceLicenceFetchedLink
            moderngovpublic12 Sept 2026, 21:48open

            Capacity and public land

            No publishable utility-capacity record within the radius.

            No site on the LDA register of relevant public lands within 500 m.

            Source: lda_lands · fetched 11 Sept 2026, 16:43
            SourceLicenceFetchedLink
            lda_landsCC-BY-4.011 Sept 2026, 16:43open

            Schools and public transport within 1.0 km

            Schools

            None within 1.0 km.

              Stops 0 · routes

                Sources: gtfs, schools · fetched 11 Sept 2026, 19:16
                SourceLicenceFetchedLink
                gtfsCC-BY-4.011 Sept 2026, 19:16open
                schoolsCC-BY-4.011 Sept 2026, 16:41open

                Sources used in this report

                SectionSourceLicenceFetched
                LocationplacesCC-BY-4.011 Sept 2026, 21:28
                ParcelparcelsCC-BY-4.011 Sept 2026, 19:06
                ZoningzoningCC-BY-4.012 Sept 2026, 02:04
                Constraintsconstraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)11 Sept 2026, 19:11
                RzltrzltCC-BY-4.012 Sept 2026, 00:23
                PlanningnpadCC-BY-4.012 Sept 2026, 20:38
                AppealsacpCC-BY-4.012 Sept 2026, 00:05
                CommencementsbcmsCC-BY-4.012 Sept 2026, 23:34
                Salescara_listingsThird-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.11 Sept 2026, 20:14
                SalespprPSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.'12 Sept 2026, 20:31
                Consultationsconsultpublic12 Sept 2026, 02:04
                Council itemsmoderngovpublic12 Sept 2026, 21:48
                Public landlda_landsCC-BY-4.011 Sept 2026, 16:43
                Projectssocial_housingCC-BY-SA-4.011 Sept 2026, 20:13
                AmenitiesgtfsCC-BY-4.011 Sept 2026, 19:16
                AmenitiesschoolsCC-BY-4.011 Sept 2026, 16:41
                DeadlinesacpCC-BY-4.012 Sept 2026, 00:05
                Deadlinesconsultpublic12 Sept 2026, 02:04
                Deadlinesmoderngovpublic12 Sept 2026, 21:48
                DeadlinesnpadCC-BY-4.012 Sept 2026, 20:38
                DeadlinesrzltCC-BY-4.012 Sept 2026, 00:23

                Generated 13 Sept 2026, 07:28 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.