Planning report · South Dublin County Council · 500 m around the house · the last 12 months · 19 Oct 2026, 19:20

Monastery Road

53.32006, -6.38440

Homes here mostly date from the 1960s. 3 planning files on this house, the latest from 2025. Home extensions nearby almost always get approved (93%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1961–70, around when planning permission began (1964). 3 planning files on this house, the latest from 2025.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1961–1970. 3 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Monastery RoadBuilt: most homes in this small area date from 1961–1970 (census estimate)most built2025: SD25B/0513W · attic or dormer, approved2020: SD19B/0390 · attic or dormer, approved2003: SD03B/0028 · attic or dormer, approved1999: 5 files on Monastery Road2000: 4 files on Monastery Road2001: 3 files on Monastery Road2002: 4 files on Monastery Road2003: 5 files on Monastery Road2004: 6 files on Monastery Road2005: 5 files on Monastery Road2006: 3 files on Monastery Road2007: 9 files on Monastery Road2008: 5 files on Monastery Road2010: 4 files on Monastery Road2012: 2 files on Monastery Road2013: 3 files on Monastery Road2014: 2 files on Monastery Road2015: 1 file on Monastery Road2016: 6 files on Monastery Road2017: 6 files on Monastery Road2018: 5 files on Monastery Road2019: 9 files on Monastery Road2020: 4 files on Monastery Road2021: 2 files on Monastery Road2022: 3 files on Monastery Road2023: 2 files on Monastery Road2024: 1 file on Monastery Road2025: 3 files on Monastery Road102 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    SD25B/0513W · attic or dormer · approved 2025 · not started, runs out 2030
    approvedstartedsigned off
  2. 2020
    SD19B/0390 · attic or dormer · approved 2020 · ran out unbuilt
    approvedstartedsigned off
  3. 2003
    SD03B/0028 · attic or dormer · approved 2003 · built? unknown
    approvedstarted?signed off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 5
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RES: To protect and/or improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 5 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: licence P1113 (962 m); licence P1066 (974 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings7St Anne's; Clondalkin Library
Radon grid squares3
Monuments6Castle - unclassified; Enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 89–100% by type. A new house in a garden is harder: 77% approved, and 1 in 2 are asked for more information.

Single-storey rear44 decided · more info asked 20%
95% · council 94%
Two-storey rear19 decided · more info asked 32%
89% · council 94%
Attic or dormer88 decided · more info asked 15%
97% · council 95%
First-floor12 decided · more info asked 8%
92% · council 92%
Garage conversion14 decided · more info asked 7%
100% · council 99%
New house in a garden or site26 decided · more info asked 54%
77% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 203 nearby, 4,272 council-wide

Figure 3

Monastery Road, file by file since 1999

33 of 39 decided extensions on the road were approved.

102 planning files on Monastery Road since 1999, by kind and decision.19992001200320052007200920112013201520172019202120232025Extensions, atticsNo number · 1999 · first-floor · approved · S99A/0014No number · 1999 · other extension · approved · S99A/0023No number · 2000 · other extension · undecided · S00A/0539No number · 2000 · other extension · approved · S00A/0882No. 3 · 2001 · two-storey side · approved · S01B/0144No. 7 · 2002 · attic conversion / dormer · approved · S02B/0081No number · 2002 · rear · approved · SD02A/0700No. 2 · 2002 · garage conversion · approved · SD02B/0228No. 88 · 2003 · attic conversion / dormer · approved · SD03B/0028No. 1B · 2003 · other extension · approved · SD03B/0220No number · 2004 · two-storey side · approved · SD04B/0289No. 4 · 2004 · attic conversion / dormer · approved · SD04B/0605No number · 2005 · other extension · approved · SD05A/0701No. 3 · 2006 · two-storey side · refused · S01B/0144/EPNo number · 2006 · rear · approved · SD06A/1072No. 4 · 2007 · single-storey rear · refused · SD07A/0031No. 1A · 2007 · attic conversion / dormer · refused · SD07A/0489No. 1A · 2007 · single-storey rear · refused · SD07A/0812No. 1B · 2007 · single-storey rear · refused · SD07A/0825No. 4 · 2007 · garage conversion · approved · SD07B/0471No. 94 · 2007 · other extension · withdrawn or invalid · SD07B/0797No. 94 · 2007 · other extension · approved · SD07B/0869No. 1A · 2008 · single-storey rear · approved · SD08A/0508No number · 2008 · other extension · approved · SD08A/0616No. 4 · 2008 · garage conversion · approved · SD08B/0284No. 94 · 2012 · attic conversion / dormer · approved · SD12B/0061No. 108 · 2012 · first-floor · withdrawn or invalid · SD12B/0319No. 108 · 2013 · first-floor · approved · SD13B/0030No. 7 · 2014 · single-storey rear · approved · SD14B/0244No number · 2016 · first-floor · approved · SD16A/0301No. 10 · 2018 · garage conversion · approved · SD18B/0132No. 75 · 2018 · single-storey rear · approved · SD18B/0327No number · 2019 · single-storey rear · refused · SD19A/0383No. 83 · 2019 · single-storey side · approved · SD19B/0155No. 108 · 2019 · garage conversion · approved · SD19B/0167No. 88 · 2019 · attic conversion / dormer · approved · SD19B/0390No number · 2020 · side · approved · SD20A/0019No. 7 · 2020 · attic conversion / dormer · approved · SD20B/0172No number · 2023 · single-storey rear · approved · SD23B/0014No. 100 · 2023 · porch / front · approved · SD23B/0299No number · 2024 · other extension · approved · PT8SD175No. 90 · 2025 · attic conversion / dormer · approved · SD25B/0513WPorches, roofs, otherNo number · 1999 · other work · approved · S99A/0390No. 2 · 1999 · other work · approved · S99A/0530No number · 1999 · other work · withdrawn or invalid · S99A/0888No number · 2000 · other work · withdrawn or invalid · S00A/0319No number · 2000 · other work · approved · S00A/0608No number · 2001 · other work · approved · S01A/0111No number · 2001 · other work · refused · S01A/0498No number · 2002 · other work · approved · S02A/0119No number · 2003 · other work · withdrawn or invalid · SD03A/0028No. 96 · 2003 · other work · approved · SD03A/0270No. 2 · 2003 · other work · refused · SD03A/0580No number · 2004 · other work · approved · SD04A/0017No number · 2004 · other work · approved · SD04A/0122No number · 2004 · other work · withdrawn or invalid · SD04A/0743No number · 2004 · other work · refused · SD04A/0866No number · 2005 · other work · approved · SD05A/0093No. 1A · 2005 · other work · withdrawn or invalid · SD05A/0419No. 2 · 2005 · other work · approved · SD05A/0517No number · 2005 · other work · approved · SD05A/0796No number · 2006 · other work · approved · SD06A/0188No number · 2007 · other work · approved · SD07A/0284No. 1 · 2007 · other work · refused · SD07A/0440No number · 2008 · other work · approved · SD08A/0481No number · 2008 · other work · approved · SD08A/0785No number · 2010 · other work · approved · SD10A/0064No number · 2010 · other work · approved · SD10A/0324No number · 2010 · other work · approved · SD10A/0354No number · 2010 · other work · approved · SD10A/0384No number · 2013 · other work · approved · SD13A/0054No. 98 · 2013 · other work · withdrawn or invalid · SD13A/0145No number · 2014 · other work · approved · SD14A/0037No number · 2015 · other work · approved · SD15A/0041No number · 2016 · other work · approved · SD16A/0037No. 3 · 2016 · other work · approved · SD16A/0140No. 3 · 2016 · other work · approved · SD16A/0319No. 3 · 2016 · other work · approved · SD16A/0320No number · 2016 · other work · withdrawn or invalid · SD16A/0375No number · 2017 · other work · approved · SD17A/0007No number · 2017 · other work · approved · SD17A/0070No. 3 · 2017 · other work · approved · SD17A/0110No number · 2017 · other work · withdrawn or invalid · SD17A/0133No number · 2017 · other work · approved · SD17A/0196No number · 2017 · other work · approved · SD17A/0291No number · 2018 · other work · approved · SD18A/0164No number · 2018 · other work · approved · SD18A/0289No number · 2018 · other work · approved · SD18A/0410No number · 2019 · other work · approved · SD19A/0063No number · 2019 · other work · refused · SD19A/0258No number · 2019 · other work · refused · SD19A/0324No number · 2019 · other work · refused · SD19A/0327No number · 2019 · other work · refused · SD19A/0328No number · 2020 · other work · approved · SD20A/0004No number · 2020 · other work · refused · SD20A/0233No number · 2021 · other work · approved · SD21A/0001No. 22 · 2021 · other work · approved · SD21A/0037No. 6 · 2022 · other work · approved · SD22A/0107No. 2 · 2022 · other work · withdrawn or invalid · SD22B/0294No number · 2022 · other work · refused · SHD3ABP-312571-22No. 3 · 2025 · other work · approved · SD25A/0115WNo number · 2025 · other work · approved · SD25A/0305New house in a side garden
ApprovedRefusedWithdrawn or invalid

102 files with "Monastery Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 1999–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 97 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 153 days; Appeal window: 4 weeks; If appealed: +138 days; Building starts: 144 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–56 (n=209)55 daysIf more info asked (1 in 6)With further information: median 153 days (n=45)153 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 138 days (n=61, all appeals within 1.5 km)+138 daysBuilding startsStart notice: median 144 days after permission (n=103)144 days after permissionSigned off434 days after the start, for the few who file. 44% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated254 decided home extensions, 103 start notices, 61 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    17 of 32 appealed refusals became permissions. 1 of 29 appealed approvals were reversed.

    Refusals appealed32 decided
    17 became permissions
    Approvals appealed29 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 4 in the last 12 months

    1 of 1 changed the council's decision

    • 501313 Granted with conditions · 75, Woodford Road, Dublin 22, D22 W3C3 · 451 m report
    • 501849 Pending · Dolcain House, Monastery Road, Clondalkin, Dublin 22. · 148 m
    • 324398 Pending · 36, Monastery Crescent, Clondalkin, Dublin 22, D22 F206 · 399 m
    • 501553 Pending · 34, Floraville Avenue, Dublin 22, D22YH11 · 422 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher19 Oct 2026, 01:37open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 4

    What's changing around you?

    Street map around Monastery Road with 13 numbered planning items
    ⌖ the houseWindow closingAppealOtherNo decision yetApprovedRefused
    1. 134 Monastery Park, Clondalkin SD26B/0350WApproved · 334 m
    2. 2Dolcain House, Monastery Road 501849Appeal: no decision yet · 148 m
    3. 3Round Tower GAA Pitches, 22 Monastry Road ED26/0105Section 5: awaiting decision · 241 m
    4. 473, Monastery Walk SD26B/0314WNo decision yet · 295 m
    5. 59, Castle Park SD26B/0132WApproved · 312 m
    6. 642, Knockmeenagh Road ED26/0024Section 5: needs permission · 394 m
    7. 736, Monastery Crescent ED26/0038Section 5: needs permission · 399 m
    8. 838, Monastery Crescent ED26/0059Section 5: exempt · 420 m
    9. 934, Floraville Avenue SD26B/0155WApproved · 422 m
    10. 1064 Monastery Park, Clondalkin SD26A/0102WNo decision yet · 429 m
    11. 1140, Woodford Park Road SD26B/0167WApproved · 445 m
    12. 1275, Woodford Road SD26B/0084WRefused · 451 m
    13. 1336 Woodford Court, Clondalkin SD26B/0036WApproved · 483 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 118 permissions since 2016, 53 show a start notice and 4 have a completion certificate.

    148 applications lodged within 500 m. Council: 118 approved, 13 refused. After appeals: 118 approved. Of those: 4 signed off, 18 built with the owner's opt-out, 31 started, 61 with no start notice found, 4 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT118: lodged → approved13: lodged → refused14: lodged → withdrawn or invalid3: lodged → undecided115: approved → approved10: refused → refused14: withdrawn or invalid → withdrawn3: undecided → undecided2 approved by the council, undecided after an appeal1 approved by the council, withdrawn or invalid after an appeal3 refused by the council, approved after an appeal61: approved → no start notice found18: approved → built, owner opted out31: approved → started, not signed off4: approved → signed off4: approved → ran out148 lodged148 lodged118 approved118 approved13 refused13 refused14 withdrawn or invalid14 withdrawn or invalid3 undecided3 undecided118 approved118 approved10 refused10 refused15 withdrawn15 withdrawn5 undecided5 undecided61 no start notice found61 no start notice found18 built, owner opted out18 built, owner opted out31 started, not signed off31 started, not signed off4 signed off4 signed off4 ran out4 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured148 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 19 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-19 SD26B/0350W: Grant Permission — Dormer window at attic level to front elevation.; 2026-11-02 ACP 501313: Grant permission with conditionstoday24 Oct29 Oct3 Nov8 Nov13 Nov18 NovSD26B/0350W: Grant Permission — Dormer window at attic level to front elevation. · 334 m away · 2026-10-19ACP 501313: Grant permission with conditions · 451 m away · 2026-11-02
    Time to appeal endsHigh Court window ends
    • Time to appeal ends 19 Oct 2026closes today
      1SD26B/0350W · Grant Permission — Dormer window at attic level to front elevation.
      €220 to An Coimisiún Pleanála (€110 observer) · 334 m away
    • Time to ask the High Court for a review ends 2 Nov 202614 days left
      Grant permission with conditions
      451 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Applications within 500 m, by year

    Between 10 and 19 a year; busiest 2019. 90% of decisions were approvals.

    2016: 7, 2017: 14, 2018: 16, 2019: 19, 2020: 15, 2021: 16, 2022: 17, 2023: 10, 2024: 14, 2025: 11, 2026: 9051015202016: 5 approved2016: 2 withdrawn or invalid7’16*2017: 10 approved2017: 2 refused2017: 2 withdrawn or invalid14’172018: 14 approved2018: 1 refused2018: 1 withdrawn or invalid16’182019: 13 approved2019: 5 refused2019: 1 undecided19’192020: 13 approved2020: 2 refused15’202021: 13 approved2021: 3 withdrawn or invalid16’212022: 13 approved2022: 1 refused2022: 3 withdrawn or invalid17’222023: 10 approved10’232024: 11 approved2024: 1 refused2024: 2 withdrawn or invalid14’242025: 11 approved11’252026: 5 approved2026: 1 refused2026: 1 withdrawn or invalid2026: 2 undecided9’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 14 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Building work nearby 3 in the last 12 months
    3 no sign-off needed
    • 34 Monastery Park, Dublin 22, Dublin, D22 Y180 · 20 Jul 2026 · short notice no sign-off needed · SD24B/0008 · 352 m
    • 36 Woodford Court, Dublin 22, Dublin, D22 HK51 · 2 Jun 2026 · start notice, opted out no sign-off needed · SD26B/0036W · 498 m
    • 39 Laurel Park, clondalkin, Dublin, D22 YH28 · 9 Feb 2026 · start notice, opted out no sign-off needed · SD22B/0525 · 460 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 19 Oct 2026, 01:33
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Dolcain House86—139 m
    Dolcain House Block D71—139 m
    SIAC HQ Lands380—216 m
    Monastry Road——271 m
    Clondalkin Library——271 m
    Clondalkin Enterprise Centre86—514 m
    SDCC Lands @28 Locations——673 m
    Ibis Hotel and Monastery Gate115—720 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Castle Kids Montessori · Crèche6 Jun 2025 · report · Tusla Early Years Inspectorate408 m
    The Village Day Care & Montessori School Ltd · Crèche23 Apr 2026 · report · Tusla Early Years Inspectorate501 m
    Naíonra Chrónáin · Crèche16 Oct 2025 · report · Tusla Early Years Inspectorate638 m
    Bright Sparks Montessori & Daycare · Crèche21 Aug 2025 · report · Tusla Early Years Inspectorate662 m
    Oakview Village Clondalkin · Crèche23 Jun 2026 · report · Tusla Early Years Inspectorate818 m
    footprints montessori & afterschool · Crèche22 Oct 2025 · report · Tusla Early Years Inspectorate989 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.012 Oct 2026, 23:02open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of South Dublin County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here77
    Council middle5
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 19 Oct 2026, 02:08
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.019 Oct 2026, 01:33open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    96% of homes built before 1971 (council 18%). 93% owner-occupied (council 67%).

    Homes built before 1971
    96% · council 18%
    Homes built since 2001
    1% · council 27%
    Owner-occupied
    93% · council 67%
    Rented
    5% · council 29%
    Children under 15
    17% · council 21%
    Aged 65 and over
    22% · council 13%
    Households with 2+ cars
    54% · council 40%
    Work mainly from home
    13% · council 10%
    This small area (403 people)South Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267050017

    Road noise
    55–59 dB
    day–night average (EPA 2022)
    Bus
    29 m
    Monastery Rd · 60, 68, 69 · busiest stop within 500 m: 11 an hour at peak
    Radon
    1 in 5
    homes here likely high (EPA). Test it
    Nearest school
    455 m
    Coláiste Bríde, 993 pupils
    Homes sold nearby
    38
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Coláiste Bríde · postprimary · 993 pupils · 455 m
    • Scoil Naomh Ide · primary · 252 pupils · 600 m
    • Scoil Naomh Aine · primary · 222 pupils · 617 m
    • Gaelscoil na Camoige · primary · 215 pupils · 694 m
    • S N Naomh Eoin · primary · 91 pupils · 701 m
    • Scoil Mhuire · primary · 292 pupils · 707 m
    • Scoil Naomh Seosamh · primary · 360 pupils · 771 m
    • Moyle Park College · postprimary · 763 pupils · 864 m

    Stops 56

    • Monastery Rd · 60, 68, 69 · 3/hour at peak · 29 m
    • Monastery Rd · 60, 68, 69 · 3/hour at peak · 85 m
    • Monastery Hth · 60, 68, 69 · 3/hour at peak · 154 m
    • Monastery Hth · 60, 68, 69 · 3/hour at peak · 264 m
    • Floraville Avenue · 60, 68, 69 · 3/hour at peak · 342 m
    • Woodford Hill · 13, 69n, G1, L54 · 11/hour at peak · 390 m
    • Floraville Avenue · 60, 68, 69 · 3/hour at peak · 403 m
    • Woodford Hill · 13, 51D, G1, L54 · 11/hour at peak · 430 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Coláiste Bríde · 455 m+3.2% pupils (993)
    • Scoil Naomh Ide · 600 m+0.8% pupils (252)
    • Scoil Naomh Aine · 617 m-1.3% pupils (222)
    • Gaelscoil na Camoige · 694 m+0.5% pupils (215) · 6 classrooms 2025, approved
    • S N Naomh Eoin · 701 m+2.2% pupils (91)
    • Scoil Mhuire · 707 m-3.6% pupils (292)

    Open consultations

    Council meetings 30 items

    Public land

    • South Dublin County Council · 0.19 ha · 86 m
    • South Dublin County Council · 0.28 ha · 133 m
    • Dublin City Council · 0.38 ha · 214 m
    • South Dublin County Council · 0.16 ha · 394 m
    • Dublin and Dun Laoghaire Education and Training Board · 0.39 ha · 447 m
    • South Dublin County Council · 0.24 ha · 498 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 19 Oct 2026, 02:28
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.019 Oct 2026, 02:08open
    Council consultation portalsPublic19 Oct 2026, 01:38open
    Council meetings (ModernGov)Public19 Oct 2026, 02:28open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Attic or dormer (SD25B/0513W) approved 2025, not started: still planned?
      Ask for: The grant, and whether it stays with the house.
      Seller · solicitor
    2. Attic or dormer (SD19B/0390) ran out unbuilt in 2025: built anyway?
      Ask for: If built: proof it started in time, and an opinion of compliance.
      Seller · solicitor
    3. Attic or dormer (SD03B/0028) approved 2003: built as approved?
      Ask for: The grant and an opinion of compliance.
      Seller · solicitor
    4. High radon area (1 in 5 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    5. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Clondalkin
    Electoral division
    Clondalkin-Monastery
    Electoral area
    Clondalkin
    Council
    South Dublin County Council
    Everything we found, as a list 8 lines
    • 3 applications on this site; latest SD25B/0513W, approved 2025, not started, runs out 2030.
    • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
    • Nothing nearby looks set to change.
    • Woodford Hill (bus 13, 69n) 390 m away: 11 an hour at morning peak; 56 from all stops within 500 m.
    • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 93% owner-occupied (council 66%); 1% of homes empty (council 4%); most built 1961–1970; 57% drive to work (council 54%).
    • Around here the council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    • Homes started within 1 km: 1 in the last year, 21 three years before.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.019 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public19 Oct 2026
    www2.courts.ie—© the publisher19 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.012 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public19 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.019 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence19 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 19 Oct 2026, 19:20 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.