- Site within Mountpark Grange Castle West, Gollierstown Road, Lucan, Co. Dublin Grant permission
The proposed development will consist of: The construction of two logistics /warehousing units (Units 5a and 5b) with associated office accommodation, service yards, ancillary structures/areas, and substation with two switch rooms. The overall floor area of the proposed logistics /warehousing units is c. 12,191.9 sq.m (Gross Internal Area (GIA)) with a total of c. 922.1 sq.m of office space. See following breakdown of each unit: o Unit 5a will comprise GIA c. 8,255.5 sq.m (including c. 635.8 sq.m of associated office space) and measures c. 17.6m from finished floor level (FFL) to roof ridge; o Unit 5b will comprise GIA c. 3,936.4 sq.m (including c. 286.3 sq.m of associated office space) and measures c. 15.2m from FFL to roof ridge; Access to the units will be from the existing internal link road. Some minor works will be required to the existing link road to accommodate the proposed units, including relocation of speed ramp and two new pedestrian crossings; The provision of rain gardens across the site; Provision of no. 86 car parking spaces and 60 bicycle spaces to serve the proposed development; The installation of a padel court and; All ancillary landscaping, boundary treatments, associated infrastructure, and site development works to support the development.
SD26A/0132Wreceived 4 Jun 2026decided 29 Jul 2026752 m away
- Within the townland of Milltown, located to the north of Peamount Road (R120), Newcastle, Co. Dublin Grant extension of duration of permission
Demolition of existing two storey dwelling of 'Bulmer' and associated outbuildings and demolition of the existing single storey house of 'Little Acre' and its associated garage and other buildings; demolition of single storey stable building on the overall site; construction of 2 two storey Information Communication Technology (ICT) facilities each with three storey plant levels and associated ancillary development which will have a gross floor area of 30,518sq.m on an overall site of 8.2 hectares; 1 two storey ICT facility (building A) will be located to the south-east of the site and will have a gross floor area of 15,196sq.m including 18 emergency generators located at ground and first floor level within a compound to the north-eastern side of the ICT facility with associated flues that will be 25m in height and will be grouped in four groups of four and 1 group of two flues (18 flues overall); 1 two storey ICT facility (building B) will be located to the north-west of Building A and centrally within the overall site and will have a gross floor area of 15,196sq.m including 18 emergency generators located at ground and first floor level within a compound to the north-eastern side of the ICT facility with associated flues that will be 25m in height and will be grouped in four groups of four and 1 group of two flues (18 flues overall); each of the two ICT facilities will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas; 2 pump rooms of 25sq.m each (4 overall - 100sq.m) plus water storage tanks and plant as well as a separate house generator that will provide emergency power to the admin and ancillary spaces; each generator will also include a diesel belly tank with a single refuelling area to serve the proposed emergency generators; 1 temporary and single storey substation (26sq.m); ancillary site development works including attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables; other ancillary site development works will include hard and soft landscaping throughout the site, lighting, fencing, signage, central services road, security gate, sprinkler tank house and 80 car parking spaces and 17 sheltered bicycle parking spaces; the development will be enclosed with landscaping to all frontages including a wetland to the south-east and will be accessed from the Peamount Road (R120) located within the townland of Milltown on lands that contain the 2 residential properties of 'Little Acre' and 'Bulmer' as well as agricultural lands and buildings which are located to the north of the Peamount Road and the lands to the north and within the overall site are subject to a concurrent application for a Power Generation Facility under Reg. SD20A/0058; An Environmental Impact Assessment Report (EIAR) is included with the application.
SD20A/0324/EPreceived 15 Apr 2026decided 23 Jun 2026126 m away
- Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22 Grant extension of duration of permission
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.
SD20A/0295/EPreceived 2 Apr 2026decided 26 May 2026961 m away
- Traveller Accommodation Site, Known as "Rock Road Mansions", Proposed development Group Housing Scheme to be known "Lock Road", Grange Castle West, Lucan, Co. Dublin. Unregistered application
Works to comprise of: 1. Demolition of the existing Traveller Accommodation Site (Area 0.81 hectares) known as
'Rock Road Mansions'. 2. Development of a new Traveller Accommodation group housing scheme (Area 1.56 hectares) to be known as 'Lock Road'. The proposed development will include; i. New single story detached house with 2 No. car parking spaces. ii. 3 No. new halting site bays, each with a single story day unit, an adjacent mobile unit and 2 No. car parking spaces. iii. New single story homework club. iv. New play area and hard standing. v. New enterprise area. vi. 2 no. storage sheds. vii. New external bin store. viii. New Irish Water pumping station. ix. Installation of new external site lighting. x. Reconfiguring of the existing entrance to the site to provide pedestrian & vehicle access. xi. All associated roadways, paths and boundary fencing. xii. All hard and soft landscaping to include a Berm to the West and South of the proposed development. xiii. All associated ancillary site works as may be required in adjacent lands but not limited to foul and surface water drainage and utility supplies. The proposal has undergone Screening for Appropriate Assessment in accordance with Article 6(3) of the Habitats Directive (92/43/EEC) and Screening for Environmental Impact Assessment under the EIA Directive 2011/92/EU, as amended by Directive 2014/52/EU. In accordance with Article 81 of the Planning & Development Regulations 2001, as amended, the Planning Authority has made a determination and concluded that: (a) The proposed development, either individually or in combination with other plans and projects, is not likely to have a significant effect on any European site(s) and therefore a Stage
2 Appropriate Assessment is not required. (b) There is no real likelihood of significant effects on the environment arising from the
proposed development and that the proposed development is not of a class set out under Schedule 5 of the Planning and Development Regulations 2001, as amended, and therefore does not require an Environmental Impact Assessment Report (EIAR). Any person may, within 4 weeks from the date of publication of this notice, apply to An Coimisiún Pleanála for a screening determination as to whether the development would be likely to have significant effects on the environment. The plans and particulars of the proposed development are available for inspection online on the council's public consultation portal website (http://consult.sdublincoco.ie) during the period
from 29th January 2026 to 13th of March 2026. Printed plans and particulars of the proposed development are available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at County Hall, Tallaght, Dublin 24, during office hours from 29th January 2026 to 27th February 2026. Submissions or observations with respect to the proposed development dealing with the
proper planning and sustainable development of the area in which the proposed development will be situated may be made in writing up to 13th of March 2026 and may be submitted as follows; • On South Dublin County Council's public consultation portal website http://consult.sdublincoco.ie, under Consultation by 11:59pm on 13th of March 2026. Or • In writing addressed to the Senior Executive Officer, Traveller Accommodation Unit, Housing Directorate, South Dublin County Council, County Hall, Tallaght, Dublin 24, to be received on or before 5.00pm on 13th of March 2026. Submission should be labelled "Lock Road, Traveller Accommodation, Grange Castle West, Lucan, Co. Dublin" NOTE: Please make your submission by one medium only. Only submissions received by 13th of March 2026 and addressed as set out above will be considered. Submissions should state the name, address, and, where relevant, details of any organisation, community group or company etc. which you represent. Only submissions received as set out above will be
considered. It should be noted that the Freedom of Information Act, 1997-2006 (as amended) applies to all records held by South Dublin County Council. The council's personal data privacy statements can be viewed at www.sdcc.ie and all personal data will be retained in line with statutory requirements.
PT8SD341received 29 Jan 2026575 m away
- Eastern and Midlands Region Water Supply Project Registered Application
The proposed development will primarily consist of a proposed Raw Water Intake & Pumping Station at Garrynatineel, Ballina, Co. Tipperary; a proposed Water Treatment Plant at Incha Beg, Birdhill, Co. Tipperary; a proposed Break Pressure Tank at Knockanacree, Cloughjordan, Co. Tipperary; a proposed Booster Pumping Station at Coagh Upper, Birr, Co. Offaly; a proposed Flow Control Valve at Commons Upper, Celbridge, Co. Kildare; a proposed Termination Point Reservoir at Loughtown Upper, Peamount, County Dublin; c. 172km of pipeline connecting the water infrastructure sites; uprating and associated works to the existing Ardnacrusha - Birdhill 38kV line and Ardnacrusha - Birdhill - Nenagh 38kV line, works at the existing Birdhill 38 kV electricity substation, power connections to infrastructure and all ancillary works above and below ground.
The nature, extent and location of the proposed development is fully described in the application plans and particulars. A Natura Impact Statement (NIS) and Environmental Impact Assessment Report (EIAR) have been prepared in respect of the Proposed Development.
A copy of this application may also be viewed on the application website www.watersupplyproject.ie
Public Consultation in respect of this application runs for the period commencing on the 6th January 2026. Any submission/observation must be received by An Coimisiún Pleanála no later than 5.30pm on the 25th February 2026.
Submissions or observations may be made only to An Coimisiún Pleanála. Submissions can be made by hand or post to, 64 Marlborough Street, Dublin 1, or by email to laps@pleanala.ie.
ACP-323980-25received 18 Dec 2025370 m away
- Site within Mountpark Grange Castle West, Gollierstown Road, Lucan, Dublin Grant permission
The proposals will comprise of amendments to Unit 7 (K78 V6TY) constructed under Reg. Ref.: SD23A/0301 (as amended by Reg. Ref.: SD24A/0224W and SD25A/0011W).
The proposed amendments will consist of:
• Change of use from logistics/warehousing to logistics/warehousing/light - industry to
accommodate a manufacturing use;
• Reconfiguration of the layout of the unit resulting a slight increase in the total GFA from 12,650
sqm to 13,333 sqm. The warehouse floor area of the unit will decrease from 11,509 sqm GFA to
10,652 sqm of manufacturing floor area for the new use and the associated office space will
increase from 994 sqm to 2,518 sqm;
• Amendments to the elevations to accommodate the changes to the layout of the unit;
• Provision of a canopy at the entrance of the building on the southern elevation and a new
outdoor terrace (c. 110 sqm) to the south of the unit;
• Reconfiguration of the car parking spaces to the south of the unit and provision of a new
overflow car parking area to the west of the service yard;
• A total of 213 no. car parking space will be provided to serve the development;
• New entrance to overflow car park from internal link road to the south;
• Provision of 10 no. van spaces to the south west corner of the service yard;
• Installation of a containerised generator within the service yard area;
• Provision of new tenant signage on south elevation:
• Relocation of existing signage on the south elevation to the east elevation;
• Provision of carpark totem to overflow parking;
• Provision of additional PV panels at roof level and;
• All associated site development works and landscaping works
SD25A/0298Wreceived 5 Dec 2025decided 4 Feb 2026704 m away
- A site within the townlands of Miltown, Clutterland & Kilmactalway, on and adjacent Peamount Road (R120, and Old Nangor Road Newcastle, Co. Dublin. Grant permission
The development will consist of the omission of a permitted above ground installation (AGI) compound under Reg. Ref.: SD20A/0058, the provision of an AGI at an alternate location within the site, and the provision of a Pressure Reduction Metering System (PRMS) and a foul pumping station, along with road upgrades to the public road (R120 Peamount Road), and provision of a foul sewer connection from the site to the northeast, via Peamount Road and Old Nangor Road. The relocated AGI, PRMS compound, and foul pumping station will be located in the southeastern corner of the site. It is proposed to demolish an existing two storey vacant house (with a gross floor area of 235 sq.m.) to provide for the AGI, PRMS compound, and foul pumping station. The relocated Gas AGI and the PRMS will be located within fenced compounds and will comprise of the following buildings and gas-related infrastructure: - 2 no. AGI buildings comprising AGI Building 1 with a total area of c.18 sq.m and overall height of c. 3.4m and AGI Building 2 with a total area of c. 8 sqm and overall height of c. 3.1m; - A Boiler House Kiosk with a total area of c. 12 sq.m and overall height c. 3.5m and boiler flues with a total height c. 5.4m; - A new E&I Kiosk with a total area of c. 12 sq.m and overall height of c. 2.7m; - A new Control Room with a total area of c. 12 sq.m and overall height of c. 3m; - A new Skid House with a total area of c. 123 sq.m and overall height of c. 3.3m; - The compounds will also accommodate associated valves and pipework. A new foul water pumping station with associated chambers, meters and a 24-hour storage tank will be provided to the east of the AGI and PRMS compounds. The proposed developmbent includes all associated and ancillary works including site lighting, boundary treatments, landscaping, drainage and infrastructure. The proposed development is located within a site subject to an application for an EPA Industrial Emissions (IE) Directive license.
SD25A/0135Wreceived 24 Oct 2025decided 20 Nov 2025374 m away
- Milltown Lodge, Peamount Lane, Newcastle, Co. Dublin, D22 DE92. Refuse permission
A new part single/part two-storey dwelling, with new vehicular access off Peamount Lane, a proprietary wastewater treatment system, and all associated site and infrastructural works.
SD25A/0247received 8 Oct 2025decided 1 Dec 2025231 m away
- Site within The Townland of Gollierstown, West of Grange Castle Business Park and Adamstown Road R120, Newcastle, Co. Dublin Grant permission
The proposed development will consist of: Reconfiguration of the layout of Unit 5 resulting a slight decrease in the total GFA from 13,348 sqm to 12,650 sqm. The warehouse floor area of the unit will increase from 11,137 sq.m to 11,509 sq.m GFA and the associated office space will decrease from 1,689 sq.m to 994 sq.m; Reconfiguration of the service yard area including: Decreasing the service yard area to the north and west of the Unit 5 building; Relocation/reconfiguration of the service yard entrance; Omission of the permitted outbuildings in the service yard; Provision of updated landscaping with attenuation pond to the north of the building and service yard;
Amendments to the western elevation to accommodate the changes to the layout of the unit; Reconfiguration of the bicycle parking area resulting in a reduction from 70 no. spaces to 64 no. spaces; Omission of the permitted tenant signage to Unit 5 and; All associated site development works.
SD25A/0011Wreceived 24 Jan 2025decided 20 Mar 2025705 m away
- Site within the townland of Gollierstown, (West of Grange Castle Business Park), Newcastle, Co. Dublin. Grant permission
The proposals will comprise of amendments to Units 2, 3 and 4, permitted under Reg. Ref.: SD23A/0301. The proposed development will consist of: Unit 2 Reconfiguration of permitted substation; Reconfiguration of car parking layout; Unit 3 Reconfiguration of the layout of the unit resulting in a reduction of floor area from 6,325 sq.m GFA (including 579 sq.m of associated office space) to 4,386 sq.m GFA(including 831 sq.m of associated office space); Reconfiguration of the car park area to provide an increase in the total number of car parking spaces from 50 no. spaces to 68 no. spaces including 14 EV charging spaces. Reconfiguration of the service yard area including: Increasing the service yard area to the east of the Unit 3 building. Relocation of the service yard entrance from east side of plot to south side of plot; Provision of 132 no. delivery van spaces with EV charging for all van spaces. Relocation of external facilities including bin store, water tank, condensers and PV battery area. Relocation of the bicycle parking area and a reduction from 32 no. spaces to 22 no. spaces; The unit will be served by 2 no. dock level loading bays and 1 no. level access loading bay; Amendments to the elevations to accommodate the changes to the layout of the unit and the provision of signage on the elevations; Omission of internal roundabout and revisions to the internal road layout; Provision of a new pedestrian crossing; Relocation of permitted substation; Amendments to the permitted attenuation ponds; Omission of the permitted fire tender access along the western boundary of the plot and; Increase in unit's finished floor level from 67.800m to 68.200m Unit 4 Relocation of permitted substation; Reconfiguration of carpark and bike parking layout (no change to permitted number of parking spaces). All associated infrastructure, road markings, totem signs, signage, Corten wayfinding, boundary treatments, landscaping and site development works.
SD24A/0224Wreceived 20 Dec 2024decided 27 Jan 2025779 m away