An OPW flood extent intersects this area. The OPW's map is licensed CC-BY-NC-ND, so we show a flag only — see the extent at floodinfo.ie.
Designation
Count
Examples
EPA-licensed facility
3
Pfizer Ireland Pharmaceuticals; P1191; W0306
NIAH-recorded building
10
Kilcarberry House; house; house
Radon risk area
3
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels
Construction of a new two storey three bedroom house adjacent and attached to the front and side and rear of existing house with pitched roof over same height as existing house roof together with all associated site development works and including vehicular access, off-street parking, boundary treatments, and connection to all public services.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
SD26B/0276Wreceived 5 Jun 2026decided 30 Jul 2026842 m away
Construction of a detached two-storey three-bedroom dwelling house (circa 110sqm internal floor area) within the side garden of the existing dwelling, including provision of revised vehicular entrance arrangements for the existing and proposed dwellings, new connection to existing public foul and surface water drainage services, new water service connection, and all associated site works.
SD26A/0119received 22 May 2026decided 16 Jul 2026812 m away
Two bed, two/three storey, gable roof, end of terrace house with rooflights to front, dormer attic window to rear, new parking and widened shared vehicular access to front, and all associated works.
SD26A/0118Wreceived 21 May 2026decided 15 Jul 2026537 m away
The development will consist of: 1. Demolition of existing front porch. 2. Demolition of existing timber shed connected to the rear existing house. 3. Construction of a single-storey flat roof front extension consisting of an entrance porch, a disability bedroom and a living area. 4. General remodel, upgrade and adaptations for disability access of the existing dwelling at ground floor level and general remodel and upgrade of the first-floor level to suit the new proposed layouts including new external insulation at the front, side and back of the house. 5. All drainage, structural and associated site works to be implemented.
SD25B/0631Wreceived 20 May 2026decided 16 Jun 2026595 m away
Installation of a fixed canopy structure over the existing balcony. The structure is to be securely anchored to the external wall and supported by 2 posts at the outer edge where required. The roof covering will consist of translucent or lightly frosted polycarbonate panels, designed to provide weather protection while allowing natural light in. The system will include integrated rainwater management.
ED26/0041received 6 May 2026decided 2 Jun 2026479 m away
Two bed, two/three storey, gable roof, end of terrace house with rooflights to front, dormer attic window to rear, new parking and widened shared vehicular access to front, and all associated works.
SD26A/0105Wreceived 2 May 2026decided 15 May 2026537 m away
The development consists of permission for retention of a single storey, masonry constructed, detached outbuilding with a flat roof to the rear of the existing dwelling house.
SD26A/0094Wreceived 13 Apr 2026decided 8 Jun 2026924 m away
The development consists of permission for retention of a single storey, masonry constructed, detached outbuilding with a flat roof to the rear of the existing dwelling house.
SD26A/0039Wreceived 16 Feb 2026decided 16 Mar 2026924 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
No publishable utility-capacity record within the radius. 51 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Dublin City Council — Dublin city and suburbs
14.64 hafolio DN36090F120 m awayas of 1 Jul 2023
Dublin City Council — Dublin city and suburbs
4.56 hafolio DN36090F250 m awayas of 1 Jul 2023
Dublin City Council — Dublin city and suburbs
0.18 hafolio DN16614N251 m awayas of 1 Jul 2023
South Dublin County Council — Dublin city and suburbs
0.49 hafolio DN4464N336 m awayas of 1 Jul 2023
Health Service Executive — Dublin city and suburbs
0.22 hafolio DN143701L367 m awayas of 1 Apr 2023
The Minister for Education and Skills — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 14 Sept 2026, 23:34 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.