Devenish Road

53.32066, -6.29682

Homes here mostly date from 1919–1945. Home extensions nearby almost always get approved (95%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Devenish RoadBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2021: 1 file on Devenish Road2022: 1 file on Devenish Road2023: 2 files on Devenish Road2024: 2 files on Devenish Road2025: 1 file on Devenish Road7 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Leo Laboratories Limited (412 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Licensed industrial sites1Leo Laboratories Limited
Radon grid squares4
Monuments6Weir - regulating; Mill - unclassified
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 77–98% by type. A new house in a garden is harder: 70% approved, and 1 in 4 is asked for more information.

Single-storey rear100 decided · more info asked 8%
95% · council 97%
Two-storey rear70 decided · more info asked 16%
96% · council 96%
Two-storey side32 decided · more info asked 22%
94% · council 98%
Single-storey side13 decided · more info asked 23%
77% · council 99%
Attic or dormer209 decided · more info asked 9%
98% · council 96%
First-floor36 decided · more info asked 19%
92% · council 94%
Garage conversion28 decided · more info asked 14%
96% · council 99%
New house in a garden or site50 decided · more info asked 24%
70% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 538 nearby, 5,627 council-wide

Figure 3

Devenish Road, file by file since 2021

6 of 6 decided extensions on the road were approved.

7 planning files on Devenish Road since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 93 · 2021 · attic conversion / dormer · approved · 2669/21No. 51 · 2022 · two-storey rear · approved · 4996/22No. 23 · 2023 · single-storey rear · approved · 4485/23No. 91 · 2023 · single-storey side · approved · 4965/23No. 70 · 2024 · two-storey rear · approved · WEB2274/24No. 24 · 2025 · attic conversion / dormer · approved · WEB1459/25Porches, roofs, otherNo. 36 · 2024 · other work · approved · WEB2088/24New house in a side garden
ApprovedRefusedWithdrawn or invalid

7 files with "Devenish Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Dormer or attic11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 8 is asked for more information, which adds about 66 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 8): 120 days; Appeal window: 4 weeks; If appealed: +132 days; Building starts: 128 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=503)55 daysIf more info asked (1 in 8)With further information: median 120 days (n=72)120 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 132 days (n=114, all appeals within 1.5 km)+132 daysBuilding startsStart notice: median 128 days after permission (n=277)128 days after permissionSigned off370 days after the start, for the few who file. 51% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated575 decided home extensions, 285 start notices, 114 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    12 of 48 appealed refusals became permissions. 7 of 67 appealed approvals were reversed.

    Refusals appealed48 decided
    12 became permissions
    Approvals appealed67 decided
    7 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 5 in the last 12 months

    None of 1 changed the council's decision

    • 502180 Pending · 239, Kimmage Road Lower, Dublin 6W · 413 m
    • 502096 Pending · 32, Clonfert Road, Kimmage, Dublin 12 · 245 m
    • 501310 Granted with conditions · 322, Clonard Road, Dublin 12 · 388 m report
    • 501914 Pending · 5, Leighlin Road, Kimmage, Dublin 12, D12 Y6F3 · 366 m
    • 324441 Pending · on the public footpath on Sundrive Road, Kimmage, Dublin 12 · 398 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Devenish Road with 15 numbered planning items
    ⌖ the houseDerelict buildingApprovedNo decision yet
    1. 1607 Clonard Road Dublin 12 D12F2D0 DS2062Derelict building · 340 m
    2. 2398 Clonard Road Dublin 12 D12H5P2; 398A Clonard Road Dublin 12 D12K663 DS1526Derelict building · 392 m
    3. 323, Blarney Park WEB2032/26Approved · 94 m
    4. 472, Blarney Park WEB5911/25Approved · 210 m
    5. 551 Clonmacnoise Road, Crumlin WEB2825/26No decision yet · 232 m
    6. 632, Clonfert Road WEB2600/26No decision yet · 245 m
    7. 7Supervalu Sundrive, Sundrive Shopping Centre WEB2358/26Approved · 272 m
    8. 828, Sundrive Road WEB1396/26Approved · 274 m
    9. 915, Sundrive Park WEB1314/26Approved · 315 m
    10. 10610, Clonard Road WEB1953/26No decision yet · 320 m
    11. 115, Leighlin Road WEB2313/26Approved · 366 m
    12. 12406B, Clonard Road WEB1180/26Approved · 388 m
    13. 13322, Clonard Road WEB1551/26Approved · 388 m
    14. 14285 Cashel Road, Crumlin WEB5898/25Approved · 412 m
    15. 15239, Kimmage Road Lower 5171/26No decision yet · 413 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 110 permissions since 2016, 42 show a start notice and 5 have a completion certificate.

    144 applications lodged within 500 m. Council: 113 approved, 8 refused. After appeals: 110 approved. Of those: 5 signed off, 15 built with the owner's opt-out, 22 started, 68 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT113: lodged → approved8: lodged → refused17: lodged → withdrawn or invalid6: lodged → undecided110: approved → approved7: refused → refused17: withdrawn or invalid → withdrawn6: undecided → undecided1 approved by the council, undecided after an appeal2 approved by the council, withdrawn or invalid after an appeal1 refused by the council, withdrawn or invalid after an appeal68: approved → no start notice found15: approved → built, owner opted out22: approved → started, not signed off5: approved → signed off144 lodged144 lodged113 approved113 approved8 refused8 refused17 withdrawn or invalid17 withdrawn or invalid6 undecided6 undecided110 approved110 approved7 refused7 refused20 withdrawn20 withdrawn7 undecided7 undecided68 no start notice found68 no start notice found15 built, owner opted out15 built, owner opted out22 started, not signed off22 started, not signed off5 signed off5 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured144 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 2 within 500 m

      Derelict building 2

      • 1607 Clonard Road Dublin 12 D12F2D0 · derelict since Jan 2025 · 340 m
      • 2398 Clonard Road Dublin 12 D12H5P2; 398A Clonard Road Dublin 12 D12K663 · derelict since Mar 2023 · 392 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 17 and 31 a year; busiest 2022. 93% of decisions were approvals.

      2021: 29, 2022: 31, 2023: 20, 2024: 17, 2025: 27, 2026: 200102030402021: 28 approved2021: 1 refused29’21*2022: 27 approved2022: 3 refused2022: 1 undecided31’222023: 18 approved2023: 1 refused2023: 1 withdrawn or invalid20’232024: 16 approved2024: 1 refused17’242025: 16 approved2025: 1 refused2025: 10 withdrawn or invalid27’252026: 8 approved2026: 1 refused2026: 6 withdrawn or invalid2026: 5 undecided20’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 24 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 5 in the last 12 months
      1 not signed off4 no sign-off needed
      • 26 Leighlin Road, Dublin 12, D12 A8PN · 11 Nov 2026 · short notice no sign-off needed · 3356/25 · 418 m
      • 28 Sundrive Road, Dublin 12, D12 K0W0 · 20 Jun 2026 · short notice no sign-off needed · WEB1396/26 · 297 m
      • 2 Sundrive Road, Kimmage, Dublin 12, D12 YE68 · 20 May 2026 · 7-day notice not signed off · WEB5464/25 · 401 m
      • 247 Cashel Road, crumlin, Dublin 12, D12 Y6P1 · 14 May 2026 · short notice no sign-off needed · WEB1280/25 · 498 m
      • 28 Sundrive Road, Crumlin, Dublin 12, D12 K0W0 · 3 Mar 2026 · short notice no sign-off needed · WEB2687/25 · 297 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Homes coming 0 not started
      • Clonard Road, Kimmage, Dublin 12 (Phase 1) · Completed · 2 homes · 217 m
      • Ravensdale Court, Kimmage, Dublin 12. (Phase 1) · Completed · 12 homes · 217 m
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Clonmacnoise Grove30no activity on site reported (2026-Q2)386 m
      Ravensdale Close26no activity on site reported (2026-Q2)726 m
      Carlisle, Kimmage Road West208208 not started (2026-Q2)767 m
      St. Pancras Works6666 built (2025-Q4)989 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Kimmage Montessori School · Crèche22 Oct 2025 · report · Tusla Early Years Inspectorate64 m
      Sundrive Nursery & Montessori School · Crèche29 Jan 2026 · report · Tusla Early Years Inspectorate310 m
      The Marist Creche · Crèche27 Sept 2024 · report · Tusla Early Years Inspectorate661 m
      Pearse College Nursery · Crèche17 Feb 2025 · report · Tusla Early Years Inspectorate736 m
      High Hopes Montessori and After School · Crèche12 Mar 2024 · report · Tusla Early Years Inspectorate839 m
      Náionra Mológa Teo · Crèche24 Sept 2025 · report · Tusla Early Years Inspectorate848 m
      Kkcreche Ltd · Crèche1 Jul 2025 · report · Tusla Early Years Inspectorate933 m
      Loreto Preschool and Afterschool · Crèche19 Mar 2026 · report · Tusla Early Years Inspectorate968 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Quieter than most of Dublin City Council.
      Homes approved
      Here45
      Council middle50
      Homes started
      Here64
      Council middle106
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      97% of homes built before 1971 (council 52%). 80% owner-occupied (council 47%).

      Homes built before 1971
      97% · council 52%
      Homes built since 2001
      1% · council 19%
      Owner-occupied
      80% · council 47%
      Rented
      17% · council 45%
      Children under 15
      19% · council 15%
      Aged 65 and over
      13% · council 13%
      Households with 2+ cars
      24% · council 19%
      Work mainly from home
      13% · council 12%
      This small area (269 people)Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268093006

      Bus
      63 m
      Stannaway Rd · 82 · busiest stop within 500 m: 8 an hour at peak
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Flood
      Yes
      OPW flood map area within 100 m
      Nearest school
      629 m
      Our Lady of Hope School, 45 pupils
      Homes sold nearby
      62
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Our Lady of Hope School · primary · 45 pupils · 629 m
      • Marist National School · primary · 210 pupils · 647 m
      • Scoil Eoin · primary · 142 pupils · 675 m
      • Scoil Úna Naofa · primary · 356 pupils · 675 m
      • Rosary College · postprimary · 250 pupils · 743 m
      • Clogher Road Community College · postprimary · 297 pupils · 755 m
      • Harolds Cross NS · primary · 398 pupils · 824 m
      • Gaelscoil Mologa · primary · 229 pupils · 848 m

      Stops 63

      • Stannaway Rd · 82 · 4/hour at peak · 63 m
      • Stannaway Rd · 82 · 3/hour at peak · 131 m
      • Éamonn Ceannt Pk · 82 · 3/hour at peak · 165 m
      • Éamonn Ceannt Pk · 82, S2 · 8/hour at peak · 242 m
      • Blarney Park · 82, S2 · 6/hour at peak · 251 m
      • Clonmacnoise Road · 74 · 2/hour at peak · 262 m
      • Clonfert Rd · 82 · 4/hour at peak · 263 m
      • Clonfert Rd · 82 · 3/hour at peak · 303 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Our Lady of Hope School · 629 m0% pupils (45)
      • Marist National School · 647 m-0.9% pupils (210)
      • Scoil Eoin · 675 m+2.9% pupils (142)
      • Scoil Úna Naofa · 675 m-1.4% pupils (356)
      • Rosary College · 743 m+11.1% pupils (250)
      • Clogher Road Community College · 755 m+10.4% pupils (297)

      Open consultations

      Council meetings 30 items

      Public land

      • Dublin City Council · 0.12 ha · 176 m
      • Dublin City Council · 0.44 ha · 215 m
      • Dublin City Council · 0.21 ha · 234 m
      • Dublin City Council · 14.08 ha · 241 m
      • Dublin City Council · 0.39 ha · 292 m
      • Dublin City Council · 1.19 ha · 317 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Flood risk area within 100 m: can you insure it?
        Ask for: A flood-cover quote before sale agreed.
        Insurer
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Electoral division
      Kimmage D
      Electoral area
      Kimmage-Rathmines
      Council
      Dublin City Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax; flood risk area within 100 m.
      • 2 sites nearby could change: 2 derelict.
      • Kimmage (bus F1, F2) 417 m away: 12 an hour at morning peak; 93 from all stops within 500 m.
      • Here (2022 census): 80% owner-occupied (council 47%); 6% of homes empty (council 8%); most built 1919–1945; 38% drive to work (council 28%); population up 3% since 2016.
      • 1 home extension within 250 m since 2026.
      • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
      • Homes started within 1 km: 11 in the last year, 12 three years before.
      • 24 applications nearby in the last 12 months; 91% approved (council 90%); 17% for work already built (council 14%).
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 30
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 06:20 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.