R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
An OPW flood extent intersects this area. The OPW's map is licensed CC-BY-NC-ND, so we show a flag only — see the extent at floodinfo.ie.
Designation
Count
Examples
Radon risk area
4
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels
This site is on an RZLT map — the draft map 2027 and the final map 2026 (5.36 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
New two storey three-bedroom house with pitched roof to form an end of terrace with same height roof as the adjacent no. 34. Two windows on ground floor side elevation with one frosted glass window on first floor. Remove one existing carpark space in front communal parking to form an entrance to front triangular shaped garden and provide 2 new parking spaces for 34a and two spaces for number 34.
New two storey three-bedroom house with pitched roof to form an end of terrace with same height roof as the adjacent no. 34. Two windows on ground floor side elevation with one frosted glass window on first floor. Remove one existing carpark space in front communal parking to form an entrance to front triangular shaped garden and provide 2 new parking spaces for 34a and two spaces for number 34.
WEB2515/26received 17 Jun 2026decided 18 Jun 2026129 m away
The development will consist of building elevational changes to include the removal of 2no. windows, 3no. external doors and external ducting and louvres. Relocation of 1no. automatic sliding door with relocation of external ATM internally within the building. Installation of 1 no. new fire escape door, replacement of shop fascia with new signage and new render finish to the Northeast, Northwest and Southwest elevations of the Supervalu building.
WEB2358/26received 4 Jun 2026decided 24 Jul 2026444 m away
PROTECTED STRUCTURE: Proposed new single storey extension to rear with rooflights and refurbishment of existing house with refurbishment of front door and original windows throughout including shutters, local repairs to roof including slates, valleys and chimneys, repairs to front valley behind parapet, proposed solar panels to roof, replacement of rainwater goods throughout, replacement of existing rooflight. Internally proposed refurbishment including removal of non-original fixtures and fittings including services and shed, insulation of suspended timber floors, replacement of existing concrete floor slab in rear return with new, proposed damp treatment to walls of rear return, proposed insulation of external walls with breathable insulation, repairs to timber floors, ceilings and cornices, insulation to attic floor, new attic hatches and fireproofing along party wall in attic space. Proposed alterations include new opening between front and rear reception rooms at ground floor level, proposed new en-suite and walk-in wardrobe at first floor level including new opening for door to en-suite, proposed removal of window to rear and dropping of cill to floor level, the proposed reconfiguration of the rear return including, at ground floor level the removal of chimneybreast, non-original bathroom, non-original floors, ceilings and windows, proposed new openings to extension and to garden with new double doors, new wc, utility room, kitchen and dining, and at first floor level the proposed removal of chimneybreast, new window opening and window to bedroom, proposed raising cill of bathroom window, new windows to replace non-original, proposed new bathroom, study and bedroom. Proposed redecoration and painting internally including removal of wallpaper throughout, repairs to walls and the sanding and varnishing of floorboards, new plumbing and electrics throughout, local repairs to front gate and painting of railings to front and all associated hard and soft landscaping.
WEB2203/26received 19 May 2026decided 8 Jul 2026486 m away
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 13 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 16:29 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.