An OPW flood extent intersects this area. The OPW's map is licensed CC-BY-NC-ND, so we show a flag only — see the extent at floodinfo.ie.
Designation
Count
Examples
Radon risk area
3
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels
Construction of a 35.9sq.m. single-storey extension to the rear of existing dwelling and construction of a 5.1sq.m. porch to the front of existing dwelling; installation of 2 Roof windows to the front roof profile and installation of an inward opening; pedestrian gate to the northwest boundary wall providing access to the old Nangor Road.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
SD26B/0276Wreceived 5 Jun 2026decided 30 Jul 2026383 m away
Planning permission is sought for single storey building to rear garden consisting of gym/ games room and storage facility, and all associated site works
SD25B/0719Wreceived 21 Dec 2025decided 23 Feb 2026426 m away
Planning permission is sought for single storey building to rear garden consisting of gym/ games room and storage facility, and all associated site works.
SD25B/0667Wreceived 29 Nov 2025decided 17 Dec 2025426 m away
8ft 6'' x 5ft 3.7'' steel shed at the rear of garden property for the intended use/conversion into a low impact, small scale baking space to support baking business.
ED25/0096received 22 Oct 2025decided 17 Nov 2025485 m away
Construction of a new three-storey extension and alterations to Gaelscoil na Camóige agus Gaelscoil Chluain Dolcáin, previously granted planning permission (Ref: SD22A/0352) and currently under construction. The development will consist of providing 2no. Classroom suites of Special Educational Needs accommodation for each school. Both Special Educational Needs units will be inclusive of 2 no. class base rooms, en-suite toilets, withdrawal room associated with each class base, central activity spaces, staff toilets, pupil toilets and shower facilities, storage and office, all at ground floor level, along with the relocation of 2 no. classrooms and en-suite toilets from the ground floor of both schools ground to first and second floor of the proposed three-storey extension
The development will also consist of an extension at first floor level, along with minor alterations to Stair Core 4 to the north elevation of Gaelscoil na Camoige and an extension at second floor level along with minor alterations to Stair Core 3 to the west elevation of Gaelscoil Chluain Dolcáin. The development will also consist of the provision of new soft play external areas for both Special Educational Needs units, connections to the existing drainage layout and all ancillary site development works. The total area for the development is 630m2
SD25A/0072Wreceived 11 Jun 2025decided 8 Jul 2025168 m away
Remove existing porch and porch roof, erect a new single storey front, side and rear extension, with new pitched roof, comprising of a family area, 1 new bedroom, new bathroom and all associated site works.
SD25B/0236Wreceived 25 Apr 2025decided 19 Jun 2025263 m away
To erect a new stainless steel and glass Bus Shelter 5.2m x 1.85m x 2.8m high with 1 no. double sided LED illuminated advertising display, along with all associated site works and services
SD24A/0096received 16 Jul 2024decided 9 Aug 20240 m away
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 15 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 08:35 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.