Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 18:28

Drimnagh Road

53.32433, -6.32429

Homes here mostly date from the 1950s. 1 planning file on this house, the latest from 2023. Home extensions nearby almost always get approved (96%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed. 1 planning file on this house, the latest from 2023.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960. 1 planning file on this house.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Drimnagh RoadBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2023: 3166/23 · driveway, approved2021: 4 files on Drimnagh Road2022: 3 files on Drimnagh Road2023: 5 files on Drimnagh Road2024: 2 files on Drimnagh Road2025: 3 files on Drimnagh Road17 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    3166/23 · driveway · approved 2023 · built, signed off
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Our Lady's Hospital for Sick Children (418 m); licence W0308 (767 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Licensed industrial sites1Our Lady's Hospital for Sick Children
Heritage inventory buildings1Our Lady's Children's Hospital
Radon grid squares1
Monuments10Settlement cluster; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 94–100% by type. A new house in a garden is harder: 79% approved, and 1 in 5 is asked for more information.

Single-storey rear62 decided · more info asked 10%
100% · council 97%
Two-storey rear43 decided · more info asked 16%
95% · council 96%
Two-storey side22 decided · more info asked 27%
95% · council 98%
Single-storey side13 decided · more info asked 15%
100% · council 99%
Attic or dormer151 decided · more info asked 9%
96% · council 96%
First-floor21 decided · more info asked 24%
95% · council 94%
Garage conversion16 decided · more info asked 19%
94% · council 99%
Porch or front10 decided · more info asked 10%
100% · council 97%
New house in a garden or site24 decided · more info asked 21%
79% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 362 nearby, 5,771 council-wide

Figure 3

Drimnagh Road, file by file since 2021

5 of 6 decided extensions on the road were approved.

17 planning files on Drimnagh Road since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 149 · 2021 · other extension · refused · 2590/21No. 165 · 2021 · rear · approved · 3612/21No. 171 · 2021 · attic conversion / dormer · approved · WEB5118/21No. 129 · 2024 · attic conversion / dormer · approved · 3893/24No. 85 · 2025 · single-storey side · approved · 3101/25No. 85 · 2025 · first-floor · withdrawn or invalid · 3203/25No. 85 · 2025 · first-floor · approved · 3280/25Porches, roofs, otherNo. 49 · 2021 · other work · approved · WEB1016/21No. 177 · 2022 · other work · approved · 4433/22No. 36 · 2022 · other work · approved · 4717/22No. 8A · 2022 · other work · approved · 5345/22No. 123 · 2023 · other work · approved · 3166/23No. 171 · 2023 · other work · refused · 3727/23No. 171 · 2023 · other work · approved · 4279/23No. 161 · 2023 · other work · approved · 4714/23No. 8A · 2023 · other work · approved · WEB1626/23No. 119 · 2024 · other work · approved · WEB1446/24New house in a side garden
ApprovedRefusedWithdrawn or invalid

17 files with "Drimnagh Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 7 is asked for more information, which adds about 80 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 134 days; Appeal window: 4 weeks; If appealed: +129 days; Building starts: 128 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–55 (n=326)55 daysIf more info asked (1 in 7)With further information: median 134 days (n=54)134 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 129 days (n=61, all appeals within 1.5 km)+129 daysBuilding startsStart notice: median 128 days after permission (n=151)128 days after permissionSigned off276 days after the start, for the few who file. 47% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated380 decided home extensions, 154 start notices, 61 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    6 of 30 appealed refusals became permissions. 7 of 33 appealed approvals were reversed.

    Refusals appealed30 decided
    6 became permissions
    Approvals appealed33 decided
    7 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Drimnagh Road with 8 numbered planning items
    ⌖ the houseEmpty land zoned for homesApprovedNo decision yet
    1. 10.3 ha zoned for homesEmpty land zoned for homes · 205 m
    2. 2Ground Floor Unit 32, Block A WEB2299/26Approved · 258 m
    3. 31 Hughes Road South, Walkinstown Dublin 12 WEB3254/26No decision yet · 276 m
    4. 4162, Brandon Road WEB1729/26Approved · 386 m
    5. 5Block K, Lansdowne Gate WEB2576/26No decision yet · 395 m
    6. 6Site at Somerville Avenue, Walkinstown WEB2644/26No decision yet · 418 m
    7. 734 Stanford Green, Walkinstown WEB1752/26Approved · 425 m
    8. 89, Crumlin Village WEB1322/26No decision yet · 460 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 91 permissions since 2016, 38 show a start notice and 7 have a completion certificate.

    122 applications lodged within 500 m. Council: 91 approved, 7 refused. After appeals: 91 approved. Of those: 7 signed off, 15 built with the owner's opt-out, 16 started, 53 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT91: lodged → approved7: lodged → refused20: lodged → withdrawn or invalid4: lodged → undecided90: approved → approved6: refused → refused20: withdrawn or invalid → withdrawn4: undecided → undecided1 approved by the council, refused after an appeal1 refused by the council, approved after an appeal53: approved → no start notice found15: approved → built, owner opted out16: approved → started, not signed off7: approved → signed off122 lodged122 lodged91 approved91 approved7 refused7 refused20 withdrawn or invalid20 withdrawn or invalid4 undecided4 undecided91 approved91 approved7 refused7 refused20 withdrawn20 withdrawn4 undecided4 undecided53 no start notice found53 no start notice found15 built, owner opted out15 built, owner opted out16 started, not signed off16 started, not signed off7 signed off7 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured122 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 1 within 500 m

      Empty land zoned for homes 1

      • 10.3 ha zoned for homes · no homes built on it yet · 205 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 15 and 22 a year; busiest 2022. 93% of decisions were approvals.

      2021: 29, 2022: 22, 2023: 18, 2024: 20, 2025: 15, 2026: 1801020302021: 27 approved2021: 1 refused2021: 1 withdrawn or invalid29’21*2022: 19 approved2022: 2 refused2022: 1 withdrawn or invalid22’222023: 16 approved2023: 1 refused2023: 1 withdrawn or invalid18’232024: 16 approved2024: 2 refused2024: 2 withdrawn or invalid20’242025: 9 approved2025: 1 refused2025: 5 withdrawn or invalid15’252026: 4 approved2026: 10 withdrawn or invalid2026: 4 undecided18’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 14 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 4 in the last 12 months
      2 not signed off2 no sign-off needed
      • Melville House, Crumlin Village, Dublin, Dublin 12 · 25 Sept 2026 · 32 homes · 7-day notice not signed off · WEB2807/25 · 358 m
      • 34 Stanford Green, Dublin 12, Dublin, D12 V0H3 · 22 Jul 2026 · short notice no sign-off needed · WEB1752/26 · 425 m
      • d5 Walkinstown Road, Dublin, Dublin 12 · 13 May 2026 · 3 homes · start notice not signed off · 2144/25 · 345 m
      • 26 Dromard Road, Drimnagh, Dublin 12, D12 FK64 · 6 Apr 2026 · short notice no sign-off needed · WEB2718/24 · 432 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Homes coming 0 not started
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Thomas Moore Road6161 being built (2026-Q2)205 m
      Melville House3232 not started (2026-Q2)324 m
      8 & 8A St Marys Road580— (2025-Q4)411 m
      Glebe House and Coruba House Site146146 not started (2026-Q2)508 m
      Carriglea Industrial Estate249249 built (2025-Q2)624 m
      Crumlin Delivery Service Unit53—695 m
      Rafter's Road and Crumlin Road Development3838 not started (2026-Q2)743 m
      Former Lighting & Electrical Distribution Group Factory59—776 m

      Who applies most nearby

      Crèches and schools inspected

      NameLatest inspectionDistance
      Little Scholars · Crèche10 Jun 2026 · report · Tusla Early Years Inspectorate199 m
      Little Tots Creche & Montessori · Crèche22 Jul 2025 · report · Tusla Early Years Inspectorate208 m
      Cocoon Childcare Longmile Road · Crèche12 Aug 2025 · report · Tusla Early Years Inspectorate432 m
      Precious Children Childcare · Crèche8 Jan 2026 · report · Tusla Early Years Inspectorate433 m
      Precious Children Daycare · Crèche9 Oct 2023 · report · Tusla Early Years Inspectorate433 m
      Ups A Daisy Childcare · Crèche7 Aug 2025 · report · Tusla Early Years Inspectorate461 m
      Creative Kids Preschool and Afterschool Service · Crèche30 Jan 2024 · report · Tusla Early Years Inspectorate545 m
      Teacher Pats Playschool · Crèche16 Oct 2024 · report · Tusla Early Years Inspectorate626 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Applicant organisations (from the CRO)Derived by Planning Register25 Oct 2026, 23:01—
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Dublin City Council.
      Homes approved
      Here201
      Council middle50
      Homes started
      Here1,529
      Council middle106
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      91% of homes built before 1971 (council 52%). 79% owner-occupied (council 47%).

      Homes built before 1971
      91% · council 52%
      Homes built since 2001
      1% · council 19%
      Owner-occupied
      79% · council 47%
      Rented
      14% · council 45%
      Children under 15
      19% · council 15%
      Aged 65 and over
      18% · council 13%
      Households with 2+ cars
      23% · council 19%
      Work mainly from home
      16% · council 12%
      This small area (241 people)Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268155007

      Road noise
      65–69 dB
      day–night average (EPA 2022)
      Bus
      38 m
      Drimnagh Road · S4 · busiest stop within 500 m: 26 an hour at peak
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Flood
      Within 500 m
      OPW flood map area, not beside the house
      Nearest school
      424 m
      Solas Hospital School, 98 pupils
      Homes sold nearby
      61
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Solas Hospital School · primary · 98 pupils · 424 m
      • Drimnagh Castle Cbs NS · primary · 342 pupils · 442 m
      • Assumption Secondary School · postprimary · 270 pupils · 542 m
      • Assumption Junior School · primary · 434 pupils · 545 m
      • S N Muire na Freastogala Girls Senior School · primary · 230 pupils · 552 m
      • Meanscoil Iognáid Rís · postprimary · 521 pupils · 629 m
      • Our Lady of Good Counsel Girls Senior School · primary · 135 pupils · 752 m
      • Our Lady Of Mercy Secondary School · postprimary · 289 pupils · 811 m

      Stops 72

      • Drimnagh Road · S4 · 7/hour at peak · 38 m
      • Balfe Road · 151, 27, 56A, 73, 77A, 77n · 22/hour at peak · 124 m
      • Balfe Road · 151, 27, 56A, 73, 77A, S4 · 26/hour at peak · 213 m
      • Errigal Gdns · 122, 73 · 4/hour at peak · 243 m
      • Crumlin Hospital · S4 · 7/hour at peak · 265 m
      • Drimnagh Rd · 122, 73 · 10/hour at peak · 331 m
      • Walkinstown Rd N · 27, 73, 77A · 15/hour at peak · 356 m
      • Saint Mary's Road · 150, S4 · 10/hour at peak · 375 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Solas Hospital School · 424 m+7.7% pupils (98)
      • Drimnagh Castle Cbs NS · 442 m-0.3% pupils (342)
      • Assumption Secondary School · 542 m-5.6% pupils (270)
      • Assumption Junior School · 545 m-3.3% pupils (434)
      • S N Muire na Freastogala Girls Senior School · 552 m+0.4% pupils (230)
      • Meanscoil Iognáid Rís · 629 m+3% pupils (521)

      Open consultations

      Council meetings 30 items

      Public land

      • Dublin City Council · 0.34 ha · 89 m
      • Dublin City Council · 0.11 ha · 93 m
      • Dublin City Council · 0.13 ha · 128 m
      • Dublin City Council · 0.5 ha · 156 m
      • Dublin City Council · 0.3 ha · 165 m
      • Dublin City Council · 0.17 ha · 187 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Mapped at 65–69 dB from road traffic: will you hear it inside?
        Ask for: A visit at rush hour (and at night), and the windows' glazing specification.
        Visit at rush hour
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Electoral division
      Walkinstown B
      Electoral area
      Ballyfermot-Drimnagh
      Council
      Dublin City Council
      Everything we found, as a list 8 lines
      • 1 application on this site; latest 3166/23, approved 2023, built, signed off.
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • 1 site nearby could change: 1 empty zoned plot.
      • Balfe Road (bus 151, 27) 213 m away: 26 an hour at morning peak; 195 from all stops within 500 m.
      • Noise from road traffic mapped at 65–69 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 79% owner-occupied (council 47%); 4% of homes empty (council 8%); most built 1946–1960; 38% drive to work (council 28%); population up 7% since 2016.
      • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
      • Homes started within 1 km: 89 in the last year, 566 three years before.
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 33
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register25 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 18:28 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.