PlanningRegister.ie
Planning report · Kildare County Council · 2000 m around the house · the last 12 months · 17 Oct 2026, 13:48

Temple Mills Road, Pausdeen Bridge, Newtown

53.32497, -6.54888

Homes here mostly date from the 2010s. Home extensions nearby almost always get approved (97%). A building site 173 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2011–15, around when building records went online (2014).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2011–2015.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2011–2015 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 2.0 kmCountFor example
Natural heritage areas2Grand Canal
Heritage inventory buildings82bridge; Ringwood House
Radon grid squares8
Monuments37Ringfort - unclassified; Enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 150 on the draft 2027 map; 150 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 96–100% by type. A new house in a garden is harder: 19% approved, and 1 in 8 is asked for more information.

Single-storey rear20 decided · more info asked 10%
100% · council 98%
Attic or dormer23 decided · more info asked 35%
96% · council 87%
New house in a garden or site16 decided · more info asked 12%
19% · council 57%
Approved nearbyKildare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 59 nearby, 4,203 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 51 days. 1 in 3 is asked for more information, which adds about 73 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 3): 123 days; Appeal window: 4 weeks; Building starts: 106 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 49–55 (n=47)51 daysIf more info asked (1 in 3)With further information: median 123 days (n=19)123 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 106 days after permission (n=26)106 days after permissionSigned off54% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated66 decided home extensions, 26 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    1 of 6 appealed refusals became permissions. 1 of 7 appealed approvals were reversed.

    Refusals appealed6 decided
    1 became permissions
    Approvals appealed7 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months
    • 324684 Open · Celbridge Lodge , Tea Lane / Church Road , Celbridge · 1.5 km
    • 323851 Granted with conditions · Celbridge Town, County Kildare · 628 m
    • 323980 Pending · in the counties of Clare, Limerick, Tipperary, Offaly, Kildare, and… · 1.5 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher17 Oct 2026, 01:34open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 4

    What's changing around you?

    Street map around Temple Mills Road, Pausdeen Bridge, Newtown with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingBuilding site that stoppedRefusedEmpty land zoned for homesBuilding startedApproved
    1. 15 Priory Walk, Saint Raphael’s Manor 2661067No decision yet · 1.1 km
    2. 2Ardrass Lower, Celbridge 2661031No decision yet · 1.6 km
    3. 384 The Grove, Celbridge 2660944Approved with conditions · 1.3 km
    4. 4Newtown Road, Celbridge 12/628Building site that stopped · 173 m
    5. 5Upstream, Templemills 2561369Refused · 196 m
    6. 61.7 ha zoned for homesEmpty land zoned for homes · 41 m
    7. 70.4 ha zoned for homesEmpty land zoned for homes · 113 m
    8. 8Pausdeen, Newtown Rd ABP-317767-23Building started · 132 m
    9. 90.1 ha zoned for homesEmpty land zoned for homes · 140 m
    10. 100.6 ha zoned for homesEmpty land zoned for homes · 166 m
    11. 111.0 ha zoned for homesEmpty land zoned for homes · 195 m
    12. 121A Templemills Cottages, Celbridge 2619Approved with conditions · 461 m
    13. 13Newtown Farm, Newtown 2561221Refused · 669 m
    14. 14Clane Road, Celbridge 2660521Approved with conditions · 973 m
    15. 156 Simmonstown Manor, Celbridge 2660183Approved with conditions · 1.1 km
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 18 permissions since 2016, 4 show a start notice and 1 has a completion certificate.

    23 applications lodged within 500 m. Council: 17 approved, 6 refused. After appeals: 18 approved. Of those: 1 signed off, 2 built with the owner's opt-out, 1 started, 7 with no start notice found, 7 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT17: lodged → approved6: lodged → refused17: approved → approved5: refused → refused1 refused by the council, approved after an appeal7: approved → no start notice found2: approved → built, owner opted out1: approved → started, not signed off1: approved → signed off7: approved → ran out23 lodged23 lodged17 approved17 approved6 refused6 refused18 approved18 approved5 refused5 refused7 no start notice found7 no start notice found2 built, owner opted out2 built, owner opted out1 started, not signed off1 started, not signed off1 signed off1 signed off7 ran out7 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured23 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    4 deadlines within 2.0 km; the first closes 22 Oct 2026.

    4 deadlines in the next 30 days: 2026-10-22 2661031: application received — a detached dormer bungalow house, single storey domestic garage, installation of a secondary effluent treatment system, ; 2026-10-27 2561009: CONDITIONAL — at a site which includes a protected structure (RPS Ref B11-109) for two-storey extension to rear together with revised ; 2026-11-02 2661067: application received — The development consists of a detached single-storey, two-bedroom dwelling (36m²) located within the rear garden of the ; 2026-11-05 2660944: CONDITIONAL — a single storey rear extension to existing two storey semi-detached house all associated site workstoday22 Oct27 Oct1 Nov6 Nov11 Nov16 Nov2661031: application received — a detached dormer bungalow house, single storey domestic garage, installation of a secondary effluent treatment system, · 1.6 km away · 2026-10-222561009: CONDITIONAL — at a site which includes a protected structure (RPS Ref B11-109) for two-storey extension to rear together with revised · 1.7 km away · 2026-10-272661067: application received — The development consists of a detached single-storey, two-bedroom dwelling (36m²) located within the rear garden of the · 1.1 km away · 2026-11-022660944: CONDITIONAL — a single storey rear extension to existing two storey semi-detached house all associated site works · 1.3 km away · 2026-11-05
    Comments closeTime to appeal ends
    • Comments close 22 Oct 20265 days left
      22661031 · application received — a detached dormer bungalow house, single storey domestic garage, installation of a secondary…
      €20 to the council · 1.6 km away
    • Time to appeal ends 27 Oct 202610 days left
      2561009 · CONDITIONAL — at a site which includes a protected structure (RPS Ref B11-109) for two-storey extension to rear…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.7 km away
    • Comments close 2 Nov 202616 days left
      12661067 · application received — The development consists of a detached single-storey, two-bedroom dwelling (36m²) located within…
      €20 to the council · 1.1 km away
    • Time to appeal ends 5 Nov 202619 days left
      32660944 · CONDITIONAL — a single storey rear extension to existing two storey semi-detached house all associated site works
      €220 to An Coimisiún Pleanála (€110 observer) · 1.3 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    2 building sites nearby stopped before sign-off.

    Newtown Road, Celbridge · 50 homes: 50 homes, started Jul 2014, never signed off; Primrose Hill, Celbridge · 16 homes: 16 homes, started Jul 2014, never signed off201420152016201720182019202020212022202320242025202620272028Newtown Road, Celbridge · 50 homes173 m · 12/62850 homes, started Jul 2014, never signed off50 homes, started Jul 2014, never signed offPrimrose Hill, Celbridge · 16 homes1.5 km · 13/101016 homes, started Jul 2014, never signed off16 homes, started Jul 2014, never signed offtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 12 within 2.0 km

    Building site that stopped 2

    • 4Newtown Road, Celbridge · 50 homes, started Jul 2014, never signed off · 173 m
    • Primrose Hill, Celbridge · 16 homes, started Jul 2014, never signed off · 1.5 km

    Empty land zoned for homes 10

    • 61.7 ha zoned for homes · no homes built on it yet · 41 m
    • 70.4 ha zoned for homes · no homes built on it yet · 113 m
    • 90.1 ha zoned for homes · no homes built on it yet · 140 m
    • 100.6 ha zoned for homes · no homes built on it yet · 166 m
    • 111.0 ha zoned for homes · no homes built on it yet · 195 m
    • 6.8 ha zoned for homes · no homes built on it yet · 209 m
    • 0.1 ha zoned for homes · no homes built on it yet · 399 m
    • 0.7 ha zoned for homes · no homes built on it yet · 441 m
    • 1.7 ha zoned for homes · no homes built on it yet · 507 m
    • 3.4 ha zoned for homes · no homes built on it yet · 0 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
    Figure 8

    Applications within 500 m, by year

    Between 1 and 7 a year; busiest 2018. 74% of decisions were approvals.

    2017: 2, 2018: 7, 2019: 2, 2020: 1, 2021: 4, 2024: 5, 2025: 1, 2026: 105102017: 1 approved2017: 1 refused2’17*2018: 4 approved2018: 3 refused7’182019: 1 approved2019: 1 refused2’192020: 1 approved1’202021: 4 approved4’212024: 5 approved5’242025: 1 refused1’252026: 1 approved1’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 40 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Building work nearby 16 in the last 12 months
    4 not signed off12 no sign-off needed
    • 16 Hazelwood Green, Celbridge, Kildare, W23 FD30 · 29 Sept 2026 · short notice no sign-off needed · 25/60738 · 1.4 km
    • 8 Oakley Gardens, Celbridge, Wicklow, W23 NH63 · 21 Sept 2026 · short notice no sign-off needed · 26/60062 · 1.8 km
    • Shackleton Road, Celbridge, Kildare · 27 Aug 2026 · 14 homes · start notice not signed off · 25/60748 · 1.5 km
    • NEWTOWN, CELBRIDGE, Liffey View, Kildare, W23 FEK8 · 23 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 2660003 · 1.2 km
    • 6 Simmonstown Manor, Celbridge, Kildare, W23 R603 · 9 Jul 2026 · start notice, opted out no sign-off needed · 26/60183 · 1.1 km
    • 8Pausdeen, Newtown Rd,, Celbridge, Kildare · 7 Jul 2026 · 39 homes · start notice not signed off · ABP-317767-23 · 132 m
    • 84 The Grove, Celbridge, Kildare, W23 FC97 · 7 Jul 2026 · short notice no sign-off needed · 25/60996 · 1.3 km
    • 30 Railway Cottages, Celbridge, Kildare, W23 F386 · 31 May 2026 · start notice, opted out no sign-off needed · SD25B/0557W · 1.9 km
    • Simmonstown, Celbridge, Kildare, W23 XEW6 · 25 May 2026 · 1 homes · start notice, opted out no sign-off needed · 2561115 · 848 m
    • 91 English Row, Celbridge, Kildare, W23 HH00 · 21 May 2026 · 7-day notice not signed off · 2560649 · 1.6 km
    • 19 Willow Crescent, Celbridge, Kildare, W23 DK27 · 1 May 2026 · short notice no sign-off needed · 24/61211 · 1.9 km
    • Oldtown Woods, Celbridge, Kildare · 20 Mar 2026 · 61 homes · start notice not signed off · 24/60371 · 1.7 km
    • 19 Willow Crescent, Celbridge, Kildare, W23 DK27 · 6 Mar 2026 · short notice no sign-off needed · 24/61211 · 1.9 km
    • W23 KXT9, Celbridge, Kildare · 2 Mar 2026 · short notice no sign-off needed · 25/61138 · 1.9 km
    • Commons Upper, Celbridge, Kildare, W23Y1XW · 25 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 25/60113 · 1.4 km
    • 36 Priory Drive, Celbridge, Kildare, W23 A313 · 6 Nov 2025 · short notice no sign-off needed · 2560473 · 1.3 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 17 Oct 2026, 01:09
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Vivienne’s Playschool · Crèche10 Dec 2024 · report · Tusla Early Years Inspectorate836 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 14 Oct 2026, 23:20
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Kildare County Council.
    Homes approved
    Here0
    Council middle0
    Homes started
    Here42
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    90% owner-occupied (council 71%).

    Homes built before 1971
    16% · council 16%
    Homes built since 2001
    63% · council 40%
    Owner-occupied
    90% · council 71%
    Rented
    7% · council 24%
    Children under 15
    25% · council 22%
    Aged 65 and over
    16% · council 12%
    Households with 2+ cars
    69% · council 51%
    Work mainly from home
    20% · council 12%
    This small area (303 people)Kildare

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 087029003/02

    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Yes
    OPW flood map area within 100 m
    Nearest school
    1.1 km
    North Kildare Educate Together NS, 432 pupils
    Homes sold nearby
    310
    in 3 years, 179 new (Property Price Register)
    Schools, stops and the council

    Schools

    • North Kildare Educate Together NS · primary · 432 pupils · 1.1 km
    • St Wolstan's Community School · postprimary · 846 pupils · 1.3 km
    • St Raphaels Special Sch · primary · 96 pupils · 1.4 km
    • Primrose Hill Ns · primary · 109 pupils · 1.5 km
    • Scoil Naomh Padraig · primary · 374 pupils · 1.6 km
    • Scoil Naomh Brid · primary · 240 pupils · 1.7 km
    • Scoil na Mainistreach · primary · 455 pupils · 1.7 km

    Stops 33

      Public land

      • Kildare County Council · 3.02 ha · 88 m
      • Kildare County Council · 0.76 ha · 1.0 km
      • Kildare County Council · 0.21 ha · 1.2 km
      • Health Service Executive · 0.9 ha · 1.3 km
      • Kildare County Council · 1.02 ha · 1.4 km
      • Kildare County Council · 5.95 ha · 1.5 km
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 17 Oct 2026, 02:12
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Council consultation portalsPublic17 Oct 2026, 01:36open
      Council meetings (ModernGov)Public17 Oct 2026, 02:12open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. On the vacant land tax map: is the 3% tax being paid?
        Ask for: Your solicitor's check of liability or exemption.
        Solicitor
      2. Flood risk area within 100 m: can you insure it?
        Ask for: A flood-cover quote before sale agreed.
        Insurer
      3. Stalled build 173 m away (Newtown Road, Celbridge): what happens next?
        Ask for: The planning file for 12/628.
        Council
      4. Application 1.1 km away open for comments until 2 Nov 2026: comment?
        Ask for: The plans on the council's website (€20 to comment).
        Council
      5. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Newtown
      Electoral division
      Donaghcumper
      Electoral area
      Celbridge
      Council
      Kildare County Council
      Everything we found, as a list 8 lines
      • Not protected; on the vacant land tax map; flood risk area within 100 m.
      • 12 sites nearby could change: 2 stalled builds, 10 empty zoned plots.
      • 2 applications open for comments nearby; nearest closes 2 Nov 2026.
      • No scheduled public transport within 800 m.
      • Here (2022 census): 90% owner-occupied (council 71%); 6% of homes empty (council 5%); most built 2011–2015; 57% drive to work (council 61%); population up 6% since 2016.
      • Around here the council decides in a median 60 days (about 9 weeks); 38% are asked for more information.
      • Homes started within 1 km: 40 in the last year, 1 three years before.
      • 40 applications nearby in the last 12 months; 78% approved (council 80%); 20% for work already built (council 24%).
      What the terms mean 9 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
      Sources and licences 32
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.017 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public17 Oct 2026
      www2.courts.ie—© the publisher17 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public17 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.017 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence17 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
      water.ie—© the publisher · flag only—
      water.ie—© the publisher · flag only—
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 17 Oct 2026, 13:48 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.