PlanningRegister.ie
Planning report · Galway County Council · 500 m around the house · the last 12 months · 28 Oct 2026, 14:10

Church Street

53.32905, -8.19671

Homes here mostly date from the 1990s. 63 homes approved 381 m away haven't started.

See on the mapWatch this area

Not held yet for Galway County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of KilgarveBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2021: 3 files on Kilgarve2022: 2 files on Kilgarve2023: 1 file on Kilgarve2024: 7 files on Kilgarve2025: 3 files on Kilgarve2026: 2 files on Kilgarve18 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Residential (Existing): To protect and improve residential amenities of existing residential areas

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

ballinasloe local area plan 2022 2028 · 6 Jul 2022 – 5 Jul 2028

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings2Catholic Church of Our Lady of Lourdes; College House
Monuments14Church; Graveyard
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 26 on the draft 2027 map; 26 on the final 2026 map.
Sources: Development plan zoning (councils), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 67% approved, and 1 in 2 are asked for more information.

New house in a garden or site12 decided · more info asked 58%
67% · council 79%
Approved nearbyGalway overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 12 nearby, 3,271 council-wide

Figure 3

Kilgarve, file by file since 2021

5 of 7 decided extensions on the road were approved. New houses in side gardens or on sites: 3 of 4.

18 planning files on Kilgarve since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · other extension · refused · 211110No number · 2021 · other extension · approved · 212197No number · 2024 · two-storey rear · approved · 2460098No number · 2024 · porch / front · approved · 2460860No number · 2024 · other extension · approved · 2460936No number · 2025 · attic conversion / dormer · approved · 2560660No number · 2026 · single-storey rear · refused · 2623Porches, roofs, otherNo number · 2022 · other work · refused · 22379No number · 2022 · other work · approved · 2260425No number · 2024 · other work · refused · 2460283No number · 2024 · other work · approved · 2460699No number · 2025 · other work · approved · 2560700No number · 2025 · other work · approved · 2561538No number · 2026 · other work · approved · 2660015New house in a side gardenNo number · 2021 · new house · refused · 211320No number · 2023 · new house · approved · 2360960No number · 2024 · new house · approved · 2460623No number · 2024 · new house · approved · 2461770
ApprovedRefusedWithdrawn or invalid

18 files with "Kilgarve" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 50 days.

    Comments open: 5 weeks · €20; Council decision: 50 days; Appeal window: 4 weeks0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 49–52 (n=12)50 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksSigned off75% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated15 decided home extensions, 4 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    0 of 3 appealed refusals became permissions. 0 of 1 appealed approvals were reversed.

    Refusals appealed3 decided
    0 became permissions
    Approvals appealed1 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 501220 Refused · Kilgarve , Creagh , Ballinasloe · 299 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher27 Oct 2026, 23:11open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Question 4

    What's changing around you?

    Street map around Church Street with 10 numbered planning items
    ⌖ the houseApproved, not startedEmpty land zoned for homesNo decision yetRefused
    1. 1Kilgarve 2660015Approved, no sign building has started · 382 m
    2. 21.7 ha zoned for homesEmpty land zoned for homes · 31 m
    3. 30.5 ha zoned for homesEmpty land zoned for homes · 47 m
    4. 46.9 ha zoned for homesEmpty land zoned for homes · 71 m
    5. 55.2 ha zoned for homesEmpty land zoned for homes · 74 m
    6. 62.5 ha zoned for homesEmpty land zoned for homes · 97 m
    7. 70.7 ha zoned for homesEmpty land zoned for homes · 113 m
    8. 8Kilgarve, Ballinasloe 2660741No decision yet · 260 m
    9. 9Kilgarve, Creagh 2623Refused · 299 m
    10. 10Townparks, Shannonbridge Road Ballinasloe 2660152Refused · 408 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 16 permissions since 2016, 5 show a start notice and 2 have a completion certificate. Most owners opt out of sign-off.

    23 applications lodged within 500 m. Council: 16 approved, 7 refused. After appeals: 16 approved. Of those: 2 signed off, 3 built with the owner's opt-out, 0 started, 9 with no start notice found, 2 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT16: lodged → approved7: lodged → refused16: approved → approved7: refused → refused9: approved → no start notice found3: approved → built, owner opted out2: approved → signed off2: approved → ran out23 lodged23 lodged16 approved16 approved7 refused7 refused16 approved16 approved7 refused7 refused9 no start notice found9 no start notice found3 built, owner opted out3 built, owner opted out2 signed off2 signed off2 ran out2 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured23 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      63 homes 381 m away were approved Oct 2026 with no start notice yet; the permission runs to Oct 2031.

      Kilgarve · 63 homes: 63 homes approved Oct 2026, not started202420252026202720282029203020312032Kilgarve · 63 homes381 m · 266001563 homes approved Oct 2026, not started63 homes approved Oct 2026, not startedtoday

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 11 within 500 m

      Approved, not started 1

      • Kilgarve · 63 homes approved Oct 2026, not started · 381 m

      Empty land zoned for homes 10

      • 21.7 ha zoned for homes · no homes built on it yet · 31 m
      • 30.5 ha zoned for homes · no homes built on it yet · 47 m
      • 46.9 ha zoned for homes · no homes built on it yet · 71 m
      • 55.2 ha zoned for homes · no homes built on it yet · 74 m
      • 62.5 ha zoned for homes · no homes built on it yet · 97 m
      • 70.7 ha zoned for homes · no homes built on it yet · 113 m
      • 1.5 ha zoned for homes · no homes built on it yet · 122 m
      • 0.1 ha zoned for homes · no homes built on it yet · 210 m
      • 0.5 ha zoned for homes · no homes built on it yet · 224 m
      • 2.8 ha zoned for homes · no homes built on it yet · 0 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 28 Oct 2026, 04:50
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 9

      Applications within 500 m, by year

      Between 2 and 8 a year; busiest 2024. 70% of decisions were approvals.

      2021: 5, 2022: 2, 2023: 2, 2024: 8, 2025: 3, 2026: 305102021: 3 approved2021: 2 refused5’21*2022: 1 approved2022: 1 refused2’222023: 1 approved2023: 1 refused2’232024: 7 approved2024: 1 refused8’242025: 3 approved3’252026: 1 approved2026: 2 refused3’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 4 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 28 Oct 2026, 04:50
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
      Homes coming 63 not started
      • 1Kilgarve · 63 homes · not started · runs out 12 Oct 2031 · 382 m
      • Kilgarve · 36 homes · building started · 118 m
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 28 Oct 2026, 04:50
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
      National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Little Rascals · Crèche23 Sept 2025 · report · Tusla Early Years Inspectorateapprox. 416 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 27 Oct 2026, 23:04
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register21 Oct 2026, 23:37open
      How busy is this area About as busy as most of Galway County Council.
      Homes approved
      Here63
      Council middle0
      Homes started
      Here12
      Council middle2
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
      National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      79% owner-occupied (council 75%).

      Homes built before 1971
      26% · council 23%
      Homes built since 2001
      16% · council 39%
      Owner-occupied
      79% · council 75%
      Rented
      16% · council 18%
      Children under 15
      19% · council 21%
      Aged 65 and over
      24% · council 17%
      Households with 2+ cars
      52% · council 52%
      Work mainly from home
      8% · council 11%
      This small area (426 people)Galway

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 067017026

      Bus
      295 m
      Creagh · 548 · busiest stop within 500 m: 1 an hour at peak
      Nearest school
      318 m
      S N Muire Gan Smal, 445 pupils
      Schools, stops and the council

      Schools

      • S N Muire Gan Smal · primary · 445 pupils · 318 m

      Stops 4

      • Creagh · 548 · 0/hour at peak · 295 m
      • Creagh · 548 · 0/hour at peak · 304 m
      • Glentaun · 548, 763 · 1/hour at peak · 479 m
      • Glentaun · 548, 763, 763X · 1/hour at peak · 485 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • S N Muire Gan Smal · 318 m-0.2% pupils (445) · 2 classrooms 2025, approved with conditions
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 28 Oct 2026, 04:50
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
      Council consultation portalsPublic28 Oct 2026, 00:59open
      Council meetings (ModernGov)Public28 Oct 2026, 02:10open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. On the vacant land tax map: is the 3% tax being paid?
        Ask for: Your solicitor's check of liability or exemption.
        Solicitor
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Kilgarve
      Electoral division
      Ballinasloe Urban
      Electoral area
      Ballinasloe
      Council
      Galway County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; on the vacant land tax map.
      • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
      • 63 homes approved nearby, not started; largest 63 at Kilgarve.
      • Glentaun (bus 548, 763) 485 m away: 1 an hour at morning peak; 3 from all stops within 500 m.
      • Here (2022 census): 78% owner-occupied (council 75%); 5% of homes empty (council 16%); most built 1991–2000; 73% drive to work (council 66%); population up 10% since 2016.
      • The council decides in a median 54 days (about 8 weeks); 1 in 3 is asked for more information.
      • Homes started within 1 km: 1 in the last year, 39 three years before.
      • 4 applications nearby in the last 12 months.
      What the terms mean 4 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 26
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.028 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public28 Oct 2026
      www2.courts.ie—© the publisher27 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public28 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.028 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence28 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 28 Oct 2026, 14:10 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.