Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.
What closes soonest 2 open windows
Observations close 17 Sept 20262 days left
SD26A/0195W — application received — Physical extension of c. 1260sq.m. to the existing electricity substation compound and will comprise of an extension of
5 weeks from receipt (13 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 254 m away
Observations close 28 Sept 202613 days left
SDZ25A/0044W — application received — Development at this site (c. 3.74Ha) at the Kishoge Southwest Development Area, including lands located within developme
5 weeks from receipt (24 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 534 m away
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels
Physical extension of c. 1260sq.m. to the existing electricity substation compound and will comprise of an extension of the existing 110kV busbar from bay H18 to create a new 110kV line bay H20, including the installation of new electrical equipment; fencing and all other ancillary development works to facilitate the proposed development.
Development at this site (c. 3.74Ha) at the Kishoge Southwest Development Area, including lands located within development sub-sector KSW-S2 and development sub-sector KSW-S4, in the Clonburris Strategic Development Zone (SDZ) within the townland of Grange, Dublin 22. The proposed development will consist of the removal of existing hard standing and associated sub-structures and the construction of 84no. dwelling units consisting of 42no. 2-bed 3p apartments and 42no. 3-bed 5p duplexes arranged across 6no. 3-storey Blocks A-F (9,255sqm GFA) with associated communal amenity space (3,444sqm total) and all ancillary accommodation including bicycle and refuse stores. Vehicular access to development sub-sector KSW-S2 is proposed from the Clonburris Southern Link Street (as permitted under Reg. Ref. SDZ20A/0021) via local roads (as proposed under Pl. Ref. SDZ25X/0001; ACP Ref. 322638) within adjoining development sectors KSW-S1 and KSW-S3 to the north of the subject site. Vehicular access to development sub-sector KSW-S4 is proposed from the Clonburris Southern Link Street (as permitted under Reg. Ref. SDZ20A/0021) via Lynch's Lane. Within development sub-sector KSW-S4, provision is also made for a future vehicular access to directly adjoining lands in development sub-sector KSW-S4 to the east of the subject site. The development will also consist of the provision of public open space including the southern part of Kishoge Linear Park, hard and soft landscaping including internal roads, shared paths and pedestrian pathways and associated connections to adjoining lands, boundary treatments and street furniture; surface car parking (95no. spaces in total, including 5no. accessible spaces and 19no. electric vehicle charging spaces); bicycle parking (252no. spaces in total, including 210no. long-stay resident spaces and 42no. short-stay visitor spaces); 2no. ESB substations; piped infrastructural services and connections; ducting; plant; SuDS measures; attenuation basins; water crossings; water, surface water, and foul drainage infrastructure; public lighting; and all site development and excavation works above and below ground. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
SDZ25A/0044Wreceived 24 Aug 202684 units534 m away
Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus; The Central Administration Building (c.6.03m to c.19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (GFA c.3,520sq.m), with provision of PV panels on the roof; each data centre (c.15.6m high to parapet height and c.18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including Modular Electrical Rooms (MERs), battery rooms and transformer areas. GFA of DUB14 is c.28,072sq.m and GFA of DUB15 is c.28,173sq.m (c.56,246sq.m in total); DUB14 will also include 21 diesel generators and associated sub-stations (E-houses) and 11 mechanical flues (each c.30.75m high); Provision of a gas generator compound (to serve DUB15) containing 20 generators, 5 E-houses and 5 flues (c.25m max height); Provision of a Gas Networks Ireland gas skid including 3 kiosk buildings; Expansion of existing electrical sub-station compound (originally granted under SD07A/0632) to provide 3 additional transformer bays. 3 E-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; Provision of 168 permanent car parking spaces and 40 cycle parking spaces; Provision of additional western access to the MS campus (to serves the Central Administration Building) from the Business Park estate road (including bridge over the Griffeen River) with existing temporary access to be extinguished; Physical integration with the remainder of the existing MS campus (including internal access roads and landscaping) with associated modifications to the western boundary of the DUB09/DUB10/DUB12/DUB13 data centre development as permitted under SD16A/0088; Provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; Total gross floor area of the development will be c.59,766sq.m; All associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence.
SD20A/0283/EPreceived 27 May 2026decided 21 Jul 2026693 m away
The relocation and amalgamation of previously permitted bike stores (Reg. Ref. [SD21A/0359]) to a revised location north of Block 2, together with all associated site works.
SD26A/0109Wreceived 1 May 2026decided 25 Jun 2026717 m away
Planning Permission for; 1) Single storey extension with 4no. roof windows to the rear of existing dwelling and front porch. 2) Conversion of existing attic space comprising modification of existing roof structure, dormer window to the rear, new access stairs, 3no. roof windows to the front of exiting dwelling and all associated site works within a Strategic Development Zone
SDZ25A/0046Wreceived 30 Mar 2026decided 22 Apr 2026788 m away
Works to comprise of: 1. Demolition of the existing Traveller Accommodation Site (Area 0.81 hectares) known as
'Rock Road Mansions'. 2. Development of a new Traveller Accommodation group housing scheme (Area 1.56 hectares) to be known as 'Lock Road'. The proposed development will include; i. New single story detached house with 2 No. car parking spaces. ii. 3 No. new halting site bays, each with a single story day unit, an adjacent mobile unit and 2 No. car parking spaces. iii. New single story homework club. iv. New play area and hard standing. v. New enterprise area. vi. 2 no. storage sheds. vii. New external bin store. viii. New Irish Water pumping station. ix. Installation of new external site lighting. x. Reconfiguring of the existing entrance to the site to provide pedestrian & vehicle access. xi. All associated roadways, paths and boundary fencing. xii. All hard and soft landscaping to include a Berm to the West and South of the proposed development. xiii. All associated ancillary site works as may be required in adjacent lands but not limited to foul and surface water drainage and utility supplies. The proposal has undergone Screening for Appropriate Assessment in accordance with Article 6(3) of the Habitats Directive (92/43/EEC) and Screening for Environmental Impact Assessment under the EIA Directive 2011/92/EU, as amended by Directive 2014/52/EU. In accordance with Article 81 of the Planning & Development Regulations 2001, as amended, the Planning Authority has made a determination and concluded that: (a) The proposed development, either individually or in combination with other plans and projects, is not likely to have a significant effect on any European site(s) and therefore a Stage
2 Appropriate Assessment is not required. (b) There is no real likelihood of significant effects on the environment arising from the
proposed development and that the proposed development is not of a class set out under Schedule 5 of the Planning and Development Regulations 2001, as amended, and therefore does not require an Environmental Impact Assessment Report (EIAR). Any person may, within 4 weeks from the date of publication of this notice, apply to An Coimisiún Pleanála for a screening determination as to whether the development would be likely to have significant effects on the environment. The plans and particulars of the proposed development are available for inspection online on the council's public consultation portal website (http://consult.sdublincoco.ie) during the period
from 29th January 2026 to 13th of March 2026. Printed plans and particulars of the proposed development are available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at County Hall, Tallaght, Dublin 24, during office hours from 29th January 2026 to 27th February 2026. Submissions or observations with respect to the proposed development dealing with the
proper planning and sustainable development of the area in which the proposed development will be situated may be made in writing up to 13th of March 2026 and may be submitted as follows; • On South Dublin County Council's public consultation portal website http://consult.sdublincoco.ie, under Consultation by 11:59pm on 13th of March 2026. Or • In writing addressed to the Senior Executive Officer, Traveller Accommodation Unit, Housing Directorate, South Dublin County Council, County Hall, Tallaght, Dublin 24, to be received on or before 5.00pm on 13th of March 2026. Submission should be labelled "Lock Road, Traveller Accommodation, Grange Castle West, Lucan, Co. Dublin" NOTE: Please make your submission by one medium only. Only submissions received by 13th of March 2026 and addressed as set out above will be considered. Submissions should state the name, address, and, where relevant, details of any organisation, community group or company etc. which you represent. Only submissions received as set out above will be
considered. It should be noted that the Freedom of Information Act, 1997-2006 (as amended) applies to all records held by South Dublin County Council. The council's personal data privacy statements can be viewed at www.sdcc.ie and all personal data will be retained in line with statutory requirements.
The proposed works consist of the erection of 6 No. platforms at the DUB07, DUB 09, DUB13, and DUB14 data centres at Grange Castle Business Park for the purpose of monitoring flue emissions.
ED26/0001received 13 Jan 2026decided 9 Feb 2026847 m away
Permission to install a standby industrial diesel generator and solar panels. The generator will include a bunded fuel tank to be located within a mesh enclosure. The proposed solar panels will be attached to a steel frame erected over the proposed generator and existing telecoms equipment, (covering an area of approximately 36 sq.m., to a maximum height of 4.6 meters above local ground level.) Works to include all ancillary development works, all located within an existing fenced compound.
SD25A/0285received 20 Nov 2025decided 23 Jan 2026272 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
No publishable utility-capacity record within the radius. 29 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
South Dublin County Council — Dublin city and suburbs
0.52 hafolio DN14299N136 m awayas of 1 Jul 2023
South Dublin County Council — Dublin city and suburbs
13.53 hafolio DN147837F164 m awayas of 1 Jul 2023
Electricity Supply Board — Dublin city and suburbs
1.58 hafolio DN128015L258 m awayas of 1 Jul 2023
South Dublin County Council — Dublin city and suburbs
0 hafolio DN15295F333 m awayas of 1 Jul 2023
South Dublin County Council — Dublin city and suburbs
0.28 hafolio DN226531F366 m awayas of 1 Jul 2023
Dublin City Council — Dublin city and suburbs
23.84 hafolio DN1168F456 m awayas of 1 Jul 2023
South Dublin County Council — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 15 Sept 2026, 12:01 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.