- 10, Crag Crescent Industrial Estate, Clondalkin, Dublin 22 Declared not exempt
Use of existing unit in its current form as a Gym; no alterations proposed.
ED26/0062received 7 Jul 2026decided 30 Jul 2026477 m away
- 3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22 Grant extension of duration of permission
Provision of 4 new information and communications technology (ICT) Facility buildings and associated development at the subject site, superseding elements of the extant planning permissions on site (Reg. Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185). The application site is subject to an EPA Industrial Emissions Licence (Ref. No,: P1113-01) relating to the Energy Centre permitted on site, The single storey Energy Centre, gas pressure reduction station, and 110kV Gas Insulated Switchgear (GIS) substation permitted under Reg, Ref.: SD18AI0068 and Reg. Ref.: SD19AI0185 will be constructed as previously approved and are not affected by the current application. The proposed development will comprise the following: The construction of 4 ICT Facility buildings (ICT Facilities 1, 2, 3, and 4) with a combined total gross floor area {GFA) of c. 47,564.5 sq.m, Each ICT Facility building includes associated external plant areas, totalling c, 20,649.5 sq,m, ICT Facilities 1, 2, and 3 will be located in the eastern portion of the site, and each comprise a GFA of c. 15,196 sq.m (including ancillary office and administration space) over part two and part three levels with a maximum height of c, 25 metres and a parapet height of c, 19.5 metres, Each of the ICT Facilities will include an associated external plant area of c, 6,624 sq,m, ICT Facility 4 will be located in the southern portion of the site and comprises a GFA of c, 1,976.5 sq,m (including ancillary office and administration space) over two levels with a maximum height of c, 15 metres and a parapet height of c. 10.5 metres, This ICT Facility includes an associated external plant area of c. 777.5sq.m, Each ICT Facility building will accommodate ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas, and screened plant. Construction of internal road network and circulation areas, footpaths, provision of 153 no. car parking spaces and 54 no, cycle parking spaces. Connections to vehicular access routes, roads, services and permitted infrastructure relating to the Energy Centre and 110kV GIS substation permitted under Reg, Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185. Provision of emergency generators with associated flues, water storage tanks and associated pump rooms (comprising 150 sq,m in total) to serve each of the proposed ICT Facility Buildings. Hard and soft landscaping and planting, lighting, and all associated works, including underground foul and storm water drainage network, boundary treatments and security fencing, attenuation areas, and utility cables.
SD20A/0309/EPreceived 27 Apr 2026decided 16 Jun 2026192 m away
- 3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22 Grant permission for retention
The development comprises the retention of the following amendments to the development permitted under Reg. Ref.: SD20A/0309, as amended by Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158, which arose during the detailed design / construction stage of the project: Amendments at plant and roof level including the reconfiguration of plant and associated extracts, provision of a roof level package plantroom, provision of 2 no. backup landlord generators, reconfigured gantry associated with the 2 no. back-up landlord generators, and reconfiguration of solar PV panels; The provision of 2 no. pumproom buildings to accommodate process water and fire water with a gross floor area (GFA) of c. 44 sq.m and c. 105 sq.m; The provision of underground water process tanks located to the south of ICT Facility 1; The provision of a wastewater treatment skid located to the west of ICT Facility 1; Reconfiguration of car parking spaces resulting in an overall reduction of 1 no. car parking spaces from 44 no. car parking spaces to 43 no. car parking spaces; Relocation of permitted cycle parking from the north of ICT Facility 1 to the south of ICT Facility 1; Amendments to fenestration and arrangement of façade treatment to ICT Facility 1 and minor reconfiguration of the internal layout; and All associated and ancillary works. An EPA-Industrial Emissions Directive (IE) licence is required to facilitate the operation of the development.
SD25A/0301Wreceived 12 Mar 2026decided 8 Apr 2026256 m away
- 3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22 Grant permission & grant retention
Permission and retention permission is sought for the following development: Permission for an ancillary generator structure with a total height of c. 22m located between ICT Facility 2 and ICT Facility 3 including 13 no. double-stacked back-up generators with flues of c. 25m, fuel storage, transformers, and associated electrical equipment and plant. Permission for 13 no. ancillary generators within a fenced compound, with a total height of c. 8.1m located to the north of ICT Facility 3, including 13 no. back-up generators with flues of c. 25m, fuel storage tanks and fuel pump room building, transformers, and associated electrical equipment and plant.
The primary fuel for the proposed back-up generators will be Hydrogenated Vegetable Oil (HVO). Permission for associated works including services connections, boundary treatments, lighting, and all ancillary works. Permission for reconfiguration of car parking spaces and the retention of 10 no. car parking spaces to the west of ICT Facility 3, resulting in an overall reduction of 8 no. car parking spaces.
Retention permission for 4 no. existing water tanks with a total height of c.9.2m and an existing water processing building with a total height of c. 5.1m, located between ICT Facility 2 and ICT Facility 3. Retention permission for 1 no. sprinkler tank with an overall height of c. 8.1m and a single storey pump room with a total height of c. 3.2m to the north of ICT Facility 3.
An EPA-Industrial Emissions Directive (IE) license is required to facilitate the operation of the proposed development.
SD25A/0257Wreceived 27 Jan 2026decided 23 Feb 2026200 m away
- The Plaza , Park West, Park West Road, Cherry Orchard , Dublin 12 Grant permission
The development will consist of the installation of four rapid electric vehicle charging stations and ancillary equipment within the car park of Plaza Park West, Dublin, including one fully accessible EV charging bay.
WEB1336/25received 20 Feb 2025decided 15 Apr 2025440 m away
- Park West Road, Park West, Cherry Orchard, Dublin 12, D12 N5K3 Application declared inva
Proposal for the installation of four rapid electric vehicle charging stations and ancillary equipment within the car park of Plaza Park West, Dublin, including one fully accessible EV charging bay.
WEB1181/25received 30 Jan 2025decided 6 Feb 2025440 m away
- 3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22 Refuse permission
The development proposed will supersede the permitted ICT Facility 4 under Reg. Ref.: SD20A/0309, as previously amended under Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158. A five-year planning permission is sought in respect of this proposed development. The proposed development comprises the following: • Construction of an ICT Facility Building (ICT Facility 4), with a Gross Floor Area (GFA) of 15,744 sq.m and a parapet height of c. 21.80m (with flues located at roof level, c. 4.5m over parapet height), over 3 no. levels, located in the southern portion of the wider landholding. This ICT Facility includes an associated external plant area of c. 1,796 sq.m over two levels, accommodating 22 no. emergency generators and associated flues. • The ICT Facility building will accommodate ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas and screened plant. • Construction of ancillary structures including a guard hut, fire hydrant water storage tanks, fire hydrant pump plantroom, water mist fire protection pump plantroom and water tanks, and cold water plantroom to the west of the proposed ICT Facility 4. • Construction of a revised internal road network and circulation areas to serve ICT Facility 4, footpaths, provision of 25 no. car parking spaces (including 2 no. disabled parking bays) and 18 no. cycle parking spaces within a bike shelter. • Lighting, boundary treatments and all ancillary and associated development (including the construction of an underground foul and storm water drainage network, and utility cables). • Hard and soft landscaping and planting, lighting, screening, and all associated works, including underground foul and storm water drainage network, boundary treatments and security fencing, attenuation areas, and utility cables. An EPA-Industrial Emissions Directive (IE) licence will be required to facilitate the operation of the proposed development.
SD24A/0201Wreceived 21 Aug 2024decided 15 Oct 2024385 m away
- Unit AF40, Cloverhill Industrial Estate, CLONDALKIN, Dublin22, D22HY51 Grant permission for retention
We, Alucraft Ltd, make application to South Dublin County Council for permission. FOR RETENTION of development at this site address: Unit AF4O, Cloverhill Industrial
Estate, Clondalkin, Dublin, D22 HY51, for alterations to permitted development under
Reg. Ret: 91A/1082, 90A/734, 89A/50, 85A/505, T.A.562., R.A. 1123 and R.A. 1098,
comprising of the following:
1. 1 No. 3-sided bike shelter with polycarbonate roof and wall sheets measuring
16.5 sq.m GFA to front of building,
2. 1 No. 3.83M High prefabricated structure comprising of additional office space
measuring 76.8 sq.m GEA to front of building,
3. 1 No. 7.61M High, permanent storage enclosure with loading bay measuring
178.42 sq.m GEA to rear of building,
4. 1 No. 2.74M high prefabricated structure comprising of additional WC provision
measuring 18.11 sq.m GFA to rear of building connected to existing foul sewer,
5. 1 No. 2.74M high prefabricated structure comprising of additional WC provision
measuring 13.47 sq.m GFA to rear of building connected to existing foul sewer,
6. 1 No. 6.54M high permanent loading platform enclosure, measuring 100.95 sq.m
GEA to rear of building,
7. 1 No. 3.31M (H) glazed curtain wall entrance porch/lobby to main reception
measuring 9.11 sq.m GFA to front of building,
8. 1 No. 2.87M (H) glazed curtain wall entrance porch/lobby to main reception
measuring 6.63 sq.m GFAto front of building,
and all associated ancillary site works on an overall site area of 2.23 hectares.
SD24A/0153received 14 Jun 2024decided 8 Aug 2024440 m away
- Unit 10, Clondalkin Business Centre, Crag Cres, Clondalkin Industrial Estate, Dublin 22, D22 X990 Grant permission
Gabor Construction Limited are applying for Permission for partial change of use as constructed under Reg. Ref. S99A/0146, from Warehouse to Office use (29sqm) to include for internal alterations and extension of current office floor areas on ground and first floor level.
SD24A/0125Wreceived 17 May 2024decided 4 Jul 2024357 m away
- 41, Barnville Park, Dublin 10 Grant permission
Construction of a 2 storey extension to side of existing dwelling with internal modifications and associated site works
WEB1906/23received 19 Oct 2023decided 13 Dec 2023320 m away