Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (99%). 355 homes approved 616 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R3
Zoning · Rural cluster
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR3 · Rural cluster
What it says

SDZ: To provide for strategic development in accordance with approved planning schemes

A small rural settlement where only modest infill serving local need is envisaged.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: licence P1204 (858 m)

Vacant land taxYes 3% of the land's value a year
Flood riskNearby OPW map area within 1.0 km · floodinfo.ie
Within 1.0 kmCountFor example
Licensed industrial sites1P1204
Natural heritage areas1Grand Canal
Heritage inventory buildings15Somerton House; Saint Helen's
Radon grid squares7
Monuments4Castle - tower house; Enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 998 on the draft 2027 map; 989 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 98–100% by type. A new house in a garden is harder: 86% approved, and 1 in 2 are asked for more information.

Single-storey rear46 decided · more info asked 26%
100% · council 96%
Attic or dormer113 decided · more info asked 13%
98% · council 98%
New house in a garden or site7 decided · more info asked 57%
86% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 166 nearby, 2,193 council-wide

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 5 is asked for more information, which adds about 66 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 5): 117 days; Appeal window: 4 weeks; If appealed: +116 days; Building starts: 92 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 49–55 (n=167)55 daysIf more info asked (1 in 5)With further information: median 117 days (n=37)117 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 116 days (n=14, all appeals within 1.5 km)+116 daysBuilding startsStart notice: median 92 days after permission (n=111)92 days after permissionSigned off22% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated205 decided home extensions, 113 start notices, 14 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    1 of 3 appealed refusals became permissions. 1 of 12 appealed approvals were reversed.

    Refusals appealed3 decided
    1 became permissions
    Approvals appealed12 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 502014 Invalid · 6, Castlegate Court, Lucan, Co Dublin, K78 VV87 · 335 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher29 Oct 2026, 23:11open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Question 4

    What's changing around you?

    Street map around Adamstown Avenue with 15 numbered planning items
    ⌖ the houseWindow closingApproved, not startedEmpty land zoned for homesApproved
    1. 131, St. Helen's Drive SDZ26B/0008WApproved · 445 m
    2. 218, Berryfield SD26B/0377WApproved · 968 m
    3. 3C. 09 ha landholding SDZ26A/0013WApproved, no sign building has started · 158 m
    4. 4The Crossings Phase 3 SDZ25A/0050WApproved, no sign building has started · 372 m
    5. 5Aderrig Phase 4 SDZ24A/0011Approved, no sign building has started · 616 m
    6. 6A site of approximately 5.12 Ha, in the townlands of Gollierstown and Finnstown SDZ26A/0009WApproved, no sign building has started · 663 m
    7. 7Tandy's Lane Village Phase 3 SDZ26A/0004WApproved, no sign building has started · 902 m
    8. 80.1 ha zoned for homesEmpty land zoned for homes · 47 m
    9. 90.8 ha zoned for homesEmpty land zoned for homes · 53 m
    10. 100.4 ha zoned for homesEmpty land zoned for homes · 53 m
    11. 110.2 ha zoned for homesEmpty land zoned for homes · 79 m
    12. 121.0 ha zoned for homesEmpty land zoned for homes · 86 m
    13. 130.1 ha zoned for homesEmpty land zoned for homes · 95 m
    14. 1443, Stratton Walk SDZ26A/0020WApproved · 121 m
    15. 15Site at Tandy's Lane, incorporating the dwellings Carrig SDZ25A/0041WApproved · 145 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 41 permissions since 2016, 20 show a start notice and 10 have a completion certificate.

    52 applications lodged within 500 m. Council: 41 approved, 0 refused. After appeals: 41 approved. Of those: 10 signed off, 2 built with the owner's opt-out, 8 started, 21 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT41: lodged → approved8: lodged → withdrawn or invalid3: lodged → undecided41: approved → approved8: withdrawn or invalid → withdrawn3: undecided → undecided21: approved → no start notice found2: approved → built, owner opted out8: approved → started, not signed off10: approved → signed off52 lodged52 lodged41 approved41 approved8 withdrawn or invalid8 withdrawn or invalid3 undecided3 undecided41 approved41 approved8 withdrawn8 withdrawn3 undecided3 undecided21 no start notice found21 no start notice found2 built, owner opted out2 built, owner opted out8 started, not signed off8 started, not signed off10 signed off10 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured52 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    2 deadlines within 1.0 km; the first closes 10 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-10 SD26B/0377W: Grant Permission — Replacement of the existing hipped roof with a gable roof, with solar panels to the rear and removal of the existing chi; 2026-11-16 SDZ26B/0008W: Grant Permission — Conversion of roof space to accommodate a bedroom and ensuite shower room, 3 no. Rooflights to front roof slope and 4 notoday4 Nov9 Nov14 Nov19 Nov24 Nov29 NovSD26B/0377W: Grant Permission — Replacement of the existing hipped roof with a gable roof, with solar panels to the rear and removal of the existing chi · 968 m away · 2026-11-10SDZ26B/0008W: Grant Permission — Conversion of roof space to accommodate a bedroom and ensuite shower room, 3 no. Rooflights to front roof slope and 4 no · 445 m away · 2026-11-16
    Time to appeal ends
    • Time to appeal ends 10 Nov 202611 days left
      2SD26B/0377W · Grant Permission — Replacement of the existing hipped roof with a gable roof, with solar panels to the rear and removal…
      €220 to An Coimisiún Pleanála (€110 observer) · 968 m away
    • Time to appeal ends 16 Nov 202617 days left
      1SDZ26B/0008W · Grant Permission — Conversion of roof space to accommodate a bedroom and ensuite shower room, 3 no. Rooflights to front…
      €220 to An Coimisiún Pleanála (€110 observer) · 445 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    355 homes 616 m away were approved Jun 2024 with no start notice yet; the permission runs to Jun 2029. DART+ South West is planned 220 m away.

    Aderrig Phase 4 · 355 homes: 355 homes approved Jun 2024, not started; The Crossings Phase 3 · 214 homes: 214 homes approved Jun 2026, not started; Tandy's Lane Village… · 107 homes: 107 homes approved Mar 2026, not started; C. 09 ha landholding · 63 homes: 63 homes approved Jul 2026, not started; DART+ South West, DART+ South…: railway order granted (13 November 2024); DART+ South West, Adamstown: railway order granted (13 November 2024)202420252026202720282029203020312032Aderrig Phase 4 · 355 homes616 m · SDZ24A/0011355 homes approved Jun 2024, not started355 homes approved Jun 2024, not startedThe Crossings Phase 3 · 214 homes372 m · SDZ25A/0050W214 homes approved Jun 2026, not started214 homes approved Jun 2026, not startedTandy's Lane Village… · 107 homes902 m · SDZ26A/0004W107 homes approved Mar 2026, not started107 homes approved Mar 2026, not startedC. 09 ha landholding · 63 homes158 m · SDZ26A/0013W63 homes approved Jul 2026, not started63 homes approved Jul 2026, not startedDART+ South West, DART+ South…220 m · plannedrailway order granted (13 November 2024)DART+ South West, Adamstown448 m · plannedrailway order granted (13 November 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 13 within 1.0 km

    Approved, not started 5

    Empty land zoned for homes 8

    • 80.1 ha zoned for homes · no homes built on it yet · 47 m
    • 90.8 ha zoned for homes · no homes built on it yet · 53 m
    • 100.4 ha zoned for homes · no homes built on it yet · 53 m
    • 110.2 ha zoned for homes · no homes built on it yet · 79 m
    • 121.0 ha zoned for homes · no homes built on it yet · 86 m
    • 130.1 ha zoned for homes · no homes built on it yet · 95 m
    • 0.3 ha zoned for homes · no homes built on it yet · 112 m
    • 0.8 ha zoned for homes · no homes built on it yet · 0 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public30 Oct 2026, 02:17open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 3 and 13 a year; busiest 2023. 100% of decisions were approvals.

    2021: 8, 2022: 7, 2023: 13, 2024: 3, 2025: 11, 2026: 10051015202021: 6 approved2021: 2 withdrawn or invalid8’21*2022: 7 approved7’222023: 11 approved2023: 2 withdrawn or invalid13’232024: 3 approved3’242025: 9 approved2025: 2 withdrawn or invalid11’252026: 5 approved2026: 2 withdrawn or invalid2026: 3 undecided10’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 1.0 km 39 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    Building work nearby 33 in the last 12 months
    23 not signed off10 no sign-off needed
    • Adamstown, Lucan, Dublin · 27 Oct 2026 · 50 homes · start notice not signed off · SDZ24A/0018W · 756 m
    • 11 Finnsvale, Lucan, Dublin, K78 NY13 · 29 Sept 2026 · short notice no sign-off needed · SD25B/0715W · 904 m
    • 10 Shackleton Wood, Lucan, Dublin, K78 Y2R6 · 24 Sept 2026 · short notice no sign-off needed · SDZ26A/0024W · 986 m
    • Newcastle Road, Lucan, Dublin, K78 W9H9 · 11 Sept 2026 · 7-day notice not signed off · 211 m
    • 8 St Helen's, Dublin, K78 H9T4 · 9 Sept 2026 · start notice, opted out no sign-off needed · SDZ24A/0016 · 607 m
    • 6 Castlegate Lawn, Lucan, Dublin, K78 PN30 · 28 Aug 2026 · short notice no sign-off needed · SDZ25A/0046W · 433 m
    • Newcastle Road, Lucan, Dublin · 7 Aug 2026 · 64 homes · start notice not signed off · SDZ24A/0018W · 760 m
    • Tandy's Lane, Lucan, Dublin · 8 Jul 2026 · 111 homes · start notice not signed off · SDZ20A/0020 · 343 m
    • 12th Lock, Newcastle Road, Lucan, Dublin, K78 V180 · 15 Jun 2026 · start notice not signed off · SD248/0001 · 859 m
    • Tandy's Lane, Lucan, South Dublin · 18 May 2026 · 111 homes · start notice not signed off · SDZ20A/0020 · 326 m
    • Tandy's Lane Adamstown, Lucan, Co. Dublin, Lucan, South Dublin · 15 May 2026 · 30 homes · start notice not signed off · SDZ25A/0030W · 952 m
    • 10 Somerton Lawns, Lucan, South Dublin, K78 X8V0 · 6 May 2026 · short notice no sign-off needed · SDZ26A/0007 · 849 m
    • 10 Shackleton Wood, Lucan, South Dublin, K78 Y2R6 · 30 Apr 2026 · short notice no sign-off needed · SDZ25A/0048W · 986 m
    • 21 Somerton Grove, Lucan, South Dublin, K78 Y867 · 14 Apr 2026 · start notice, opted out no sign-off needed · SD25B/0421W · 746 m
    • Tandy's Lane, Lucan, South Dublin · 27 Mar 2026 · 111 homes · start notice not signed off · SDZ20A/0020 · 320 m
    • 85 Narrowgauge Row, Lucan, Dublin, K78 W5P0 · 26 Mar 2026 · start notice not signed off · SDZ20A/0008 · 535 m
    • Tandy's Lane, Lucan, South Dublin · 27 Feb 2026 · 3 homes · start notice not signed off · SDZ20A/0020 · 251 m
    • 12 Shackleton Rise, Dublin, South Dublin, K78 W2C6 · 6 Jan 2026 · short notice no sign-off needed · SD25B/0556W · 770 m
    • St Helen's Wood, Adamstown Way, Lucan, South Dublin · 2 Jan 2026 · 7-day notice not signed off · SDZ23A/0012 · 161 m
    • Adamstown, Lucan, Co. Dublin, Lucan, South Dublin · 28 Nov 2025 · 355 homes · start notice not signed off · SDZ23A/0026 · 716 m
    • Adamstown, Lucan, Co. Dublin, South Dublin · 28 Nov 2025 · 355 homes · start notice not signed off · SDZ23A/0026 · 716 m
    • Adamstown, Lucan, Co. Dublin, South Dublin · 28 Nov 2025 · 355 homes · start notice not signed off · SDZ23A/0026 · 716 m
    • Adamstown, Lucan, Co. Dublin, South Dublin · 28 Nov 2025 · 355 homes · start notice not signed off · SDZ23A/0026 · 716 m
    • Adamstown, Lucan, Co. Dublin, Lucan, South Dublin · 28 Nov 2025 · 355 homes · start notice not signed off · SDZ23A/0026 · 716 m
    • Adamstown, Lucan, Co. Dublin, South Dublin · 28 Nov 2025 · start notice not signed off · SDZ23A/0026 · 716 m
    • St Helen's Terrace, Adamstown, South Dublin · 26 Nov 2025 · 7-day notice not signed off · SDZ23A/0012 · 232 m
    • St Helen's Terrace, Adamstown, South Dublin · 26 Nov 2025 · 7-day notice not signed off · SDZ23A/0012 · 291 m
    • Adamstown Way, Adamstown, South Dublin · 26 Nov 2025 · 7-day notice not signed off · SDZ23A/0012 · 80 m
    • Stratton Row, Adamstown, South Dublin · 26 Nov 2025 · 7-day notice not signed off · SDZ23A/0012 · 185 m
    • Tandy's Lane, Lucan, South Dublin · 21 Nov 2025 · 69 homes · start notice not signed off · SDZ20A/0020 · 323 m
    • 6 Shackleton Links, Lucan, Dublin, K78 K2D0 · 19 Nov 2025 · short notice no sign-off needed · SDZ25A/0029W · 949 m
    • Unit 2, The Junction, the Crossings, Adamstown, Lucan, South Dublin, K78 Y9W2 · 19 Nov 2025 · 7-day notice not signed off · SDZ22A/0019 · 491 m
    • 5 Shackleton Links, Lucan, South Dublin, K78 C9D0 · 8 Nov 2025 · short notice no sign-off needed · SDZ25A/0035W · 954 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 30 Oct 2026, 02:44
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    Homes coming 786 not started
    • Aderrig, Adamstown, Co. Dublin (Phase 1)* · On site · 141 homes · 755 m
    • Aderrig Heights, Aderrig Farm, Adamstown, Co. Dublin (Phase 1)* · Completed · 14 homes · 817 m
    • Block G Part V Units, The Crossings, Adamstown, Co. Dublin (Phase 1)* · Completed · 30 homes · 817 m
    • Hallwell Square, Adamstown, Co. Dublin (Phase 1) · Completed · 64 homes · 817 m
    • Redford Avenue, The Boulevard, Adamstown, Co. Dublin (Phase 1)* · Completed · 7 homes · 817 m
    • Redford Avenue, The Boulevard, Adamstown, Co. Dublin (Phase 2)* · On site · 17 homes · 817 m
    • Redford Avenue, The Boulevard, Adamstown, Co. Dublin (Phase 3)* · On site · 2 homes · 817 m
    • Shackleton Street, Adamstow · Completed · 4 homes · 817 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Adamstown Strategic Development Zone205—46 m
    C. 09 ha landholding15—66 m
    Tandy's Lane11124 being built · 87 not started (2026-Q2)145 m
    Tandy's Lane Development113—145 m
    Gollierstown——182 m
    Adamstown District Centre Phase Two185—242 m
    Adamstown Block G184—242 m
    14 Stratton Drive——274 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Giraffe Childcare Adamstown · Crèche8 Jul 2025 · report · Tusla Early Years Inspectorate320 m
    Busy Kids Creche · Crèche7 Apr 2025 · report · Tusla Early Years Inspectorate680 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of South Dublin County Council.
    Homes approved
    Here1,211
    Council middle0
    Homes started
    Here1,309
    Council middle5
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    0% of homes built before 1971 (council 18%). 59% owner-occupied (council 67%).

    Homes built before 1971
    0% · council 18%
    Homes built since 2001
    98% · council 27%
    Owner-occupied
    59% · council 67%
    Rented
    29% · council 29%
    Children under 15
    30% · council 21%
    Aged 65 and over
    2% · council 13%
    Households with 2+ cars
    28% · council 40%
    Work mainly from home
    19% · council 10%
    This small area (389 people)South Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267103001

    Bus
    52 m
    Stratton Grove · C1, L53, P29 · busiest stop within 500 m: 9 an hour at peak
    Planned
    220 m
    DART+ South West, DART+ South West: Hazelhatch and Celbridge - Dublin Heuston
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Flood
    Within 1.0 km
    OPW flood map area, not beside the house
    Nearest school
    154 m
    Adamstown Community College, 981 pupils
    Homes sold nearby
    122
    in 3 years, 30 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Adamstown Community College · postprimary · 981 pupils · 154 m
    • St. John the Evangelist National School · primary · 417 pupils · 221 m
    • Adamstown Castle Educate Together National School · primary · 431 pupils · 265 m

    Stops 22

    • Stratton Grove · C1, L53, P29 · 9/hour at peak · 52 m
    • Stratton Grove · C1, L53, P29 · 5/hour at peak · 93 m
    • Castlegate Drive · C1, L53, P29 · 5/hour at peak · 136 m
    • Castlegate Drive · C1, L53, P29 · 9/hour at peak · 214 m
    • Castlegate Walk · C1, L53, P29 · 5/hour at peak · 395 m
    • Adamstown Avenue · C2, L51, L52, X30 · 5/hour at peak · 395 m
    • Castlegate Walk · C1, L53, P29 · 9/hour at peak · 410 m
    • Adamstown Station · C1, C2, L51, L52, L53, P29 · 436 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Adamstown Community College · 154 m+0.1% pupils (981)
    • St. John the Evangelist National School · 221 m-0.2% pupils (417)
    • Adamstown Castle Educate Together National School · 265 m-0.2% pupils (431) · an extension 2025, approved · an extension 2024, approved

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin and Dun Laoghaire Education and Training Board · 0.84 ha · 119 m
    • The Minister for Education and Skills · 1.28 ha · 152 m
    • Córas Iompair Éireann · 0.29 ha · 231 m
    • South Dublin County Council · 0.65 ha · 394 m
    • Córas Iompair Éireann · 0.17 ha · 445 m
    • South Dublin County Council · 0.14 ha · 668 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 30 Oct 2026, 05:03
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.030 Oct 2026, 05:03open
    Council consultation portalsPublic30 Oct 2026, 01:04open
    Council meetings (ModernGov)Public30 Oct 2026, 02:17open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    2. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    3. 63 homes approved 158 m away (C. 09 ha landholding), not started: what is planned?
      Ask for: The planning file for SDZ26A/0013W.
      Council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Finnstown
    Electoral division
    Lucan-St. Helens
    Electoral area
    Lucan
    Council
    South Dublin County Council
    Everything we found, as a list 8 lines
    • Zoned R3 (rural cluster); not protected; on the vacant land tax map; high radon area.
    • 13 sites nearby could change: 5 approved schemes, 8 empty zoned plots.
    • 786 homes approved nearby, not started; largest 355 at Aderrig Phase 4.
    • Adamstown Station (bus C1, C2) 498 m away: 18 an hour at morning peak; 78 from all stops within 500 m. Planned: DART+ South West 220 m away, railway order granted (13 November 2024).
    • Here (2022 census): 59% owner-occupied (council 66%); 2% of homes empty (council 4%); most built 2001–2010; 43% drive to work (council 54%); population up 58% since 2016.
    • 1 home extension within 250 m since 2026.
    • Around here the council decides in a median 54 days (about 8 weeks); 1 in 4 is asked for more information.
    • Homes started within 1 km: 496 in the last year, 352 three years before.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 32
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.030 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public30 Oct 2026
    www2.courts.ie—© the publisher29 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public30 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.030 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence30 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 30 Oct 2026, 08:57 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.