Cork Street
What closes soonest 0 open windows
No observation, appeal or consultation window is open within 500 m today.
Where this is
- Settlement
- Dublin city and suburbs
- Electoral division
- Merchants Quay C
- Local electoral area
- South West Inner City
- Local authority
- Dublin City Council
Census 2022, small area 268100004
7.3% owner-occupied, 82.7% privately rented, 31.8% social. Vacancy 11.6%.
Zoning evaluated against the point
Zone Z4 - DEV PLAN 2022-2028
Z4: Key Urban Villages/Urban Villages: To provide for and improve mixed-services facilities.
What that means: A local centre: shops, services and apartments over them, serving the surrounding housing.
Source: zoning · fetched 12 Sept 2026, 02:04
| Source | Licence | Fetched | Link |
|---|---|---|---|
| zoning | CC-BY-4.0 | 12 Sept 2026, 02:04 | open |
Designations and constraints within 500 m
| Designation | Count | Examples |
|---|---|---|
| EPA-licensed facility | 4 | Diageo Ireland; Diageo Ireland; Diageo Ireland |
| NIAH-recorded building | 63 | house; house; house |
| Radon risk area | 1 | About 1 in 20 homes in this area is likely to have high radon levels |
| Recorded monument | 56 | Gateway; Gateway; Religious house - Augustinian canons |
Sources: constraints, constraints.epa_licence, constraints.flood_cfram, constraints.niah, constraints.radon, constraints.smr · fetched 11 Sept 2026, 19:11
| Source | Licence | Fetched | Link |
|---|---|---|---|
| constraints | mixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false) | 11 Sept 2026, 19:11 | open |
| constraints.epa_licence | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
| constraints.flood_cfram | CC-BY-NC-ND-4.0 · not redistributable — shown as a flag only | 11 Sept 2026, 19:11 | open |
| constraints.niah | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
| constraints.radon | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
| constraints.smr | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
Residential Zoned Land Tax
This site is not on the current draft or final RZLT map.
Source: rzlt · fetched 12 Sept 2026, 00:23
| Source | Licence | Fetched | Link |
|---|---|---|---|
| rzlt | CC-BY-4.0 | 12 Sept 2026, 00:23 | open |
Planning applications 231 in 5 years within 500 m
Recent decisions and applications
- The Coombe Women and Infants University Hospital, Dolphin's Barn Street, Dublin 8, D08 XW7X Registered ApplicationPlanning permission is sought for an external, backlight illuminated signage, with the name 'The Coombe Hospital', measuring 1.73m in height by 4m in width, to be positioned approximately 13m above ground level along the front (west) elevation of the Main Building fronting onto Dolphins Barn Street. The proposed signage is to replace the existing signage in the same location. Associated repainting and replastering on the external façade of the building is also proposed.
- The Coombe Women and Infants University Hospital, Dolphin's Barn Street, Dublin 8, D08 XW7X Application declared invalidPlanning permission is sought for an external, backlight illuminated signage, with the name ‘The Coombe Hospital’, measuring 1.73m in height by 4m in width, to be positioned approximately 13m above ground level along the front (west) elevation of the Main Building fronting onto Dolphins Barn Street. The proposed signage is to replace the existing signage in the same location. Associated repainting and replastering on the external façade of the building is also proposed.
- 4 Sandford Park, S Circular Road, Dublin 8, D08 X4V8 Registered ApplicationTwo-storey flat roof side extension incorporating an elongated front-facing first floor window, and a first floor flat roof rear extension.
- 3, Sandford Gardens, Dublin 8, D08R3K0 Registered ApplicationConstruction of a part two-storey, part first-floor side extension; a first floor rear extension; a new rear-facing gable with raised ridge height; a roof window to the side roof slope; and revised fenestration to all elevations.
- Saint James's National School, Basin View, Dublin 8 Registered ApplicationWe, St. James’s National School, intend to apply for planning permission for development St. James’s National School, Basin View, Dublin 8. The site is located immediately to the south of the school, north of James’s Walk and west of The Hops, Basin View, Dublin 8. The proposed development comprises of the following: • Removal of the existing structures, including a shed and storage container and all associated site clearance works; • Relocation of the play frame within the inner courtyard of the school; • Upgrade of the existing school playground to provide a synthetic all-weather sports pitch with a total area of approx. 2,400 sq.m, incorporating 2 no. overlapping sports playing field measuring approx. 40m X 30m each; • Provision of 12 no. Sheffield stands accommodating 24 no. bicycle parking spaces and associated pedestrian pathways; • Revisions to the existing boundary wall onto James’s Walk to facilitate maintenance vehicle access; • Provision of perimeter mesh fencing with ball stop netting above, floodlighting on 4 no. columns measuring 10.5m in height, drainage infrastructure, retaining walls, hard and soft landscaping works and all associated site development works.
- 27-29 New Row South, Dublin 8. The application site is located at the junction of New Row South to the northwest,, Blackpitts to the west and Fumbally Lane to the south and southeast. The site contains a Protected Structure, (referred to as a former laun Grant permission and retention permissionPROTECTED STRUCTURE: RETENTION: We, TC Fumbally Properties Ltd, intend to apply for planning permission and retention permission at 27-29 New Row South, Dublin 8. The application site is located at the junction of New Row South to the northwest, Blackpitts to the west and Fumbally Lane to the south and southeast. The site contains a Protected Structure (referred to as a former laundry building under RPS Ref.: 5821). The proposed development consists of the following modifications to the permitted hotel development, permitted under Reg. Ref.: 4423/19 & ABP Ref.: 307217-20, as amended under Reg. Ref.: 4778/22 & ABP Ref.: 315887-23, which is currently under construction: Planning permission is sought for the following alterations: • Internal reconfiguration of the back of house areas at ground and first floor level of the existing building (Block A), a Protected Structure under RPS Ref.: 5821, including a revised linen store, provision of accessible staff bathroom, cleaning store kitchen and storage areas at ground floor level and staff facilities at first floor level. Provision of meeting rooms within the co-working area and residential communal kitchen at ground floor level. • Alterations to the previously permitted works to the façade to the Protected Structure including portion of existing wall to be retained, lowering of existing window cills at 2nd and 3rd floor level, retention of existing concrete supports for the 9 no. windows at ground floor level along New Row South and replacement of the stone with metal PPC flashing. • Reduction of the permitted louvered plant enclosure at roof level of Block A. • Internal reconfiguration of proposed ground floor level of Block B including provision of a resident’s gym and laundry, and management office at ground floor level. Relocation of accessible bedrooms within permitted floors from first to sixth floor level. • Elevational changes to Block B, the permitted 8 storey building, including reconfiguration of fenestration from first to seventh floor. • Revisions to the entrance lobby at ground floor level including glazing and gate. New escape door created at existing entrance. • Provision of a lightning protection system at roof level of Block B. • Revisions to the permitted bicycle store enclosure. Retention permission is sought for the following: • Reorientation of the multi-storey stair core of the 8 storey building to the southwest of the site. • Disassembly and rebuild of portion of the existing southern wall of the Protected Structure. • Reduction of the permitted building footprint at ground floor level which results in revisions to the substation and switch room, removal of a stair core / service area corridor and internal reconfiguration of the back of house, hotel reception and lounge area. The proposed alterations result in an overall decrease of 42 sq.m in the total GFA of the hotel from 7690 sq.m to 7648 sq.m.
- 1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5 Additional informationWe, Black Sheep Investments Limited, intend to apply for Permission for development at this site: 1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5. The development will consists of: (i) Demolition of non-original extension of the existing public house, the Ardee House; (ii) Part-demolition of the existing original fabric of public house structure, with the selective retention of external façades; (iii) Construction of a part six-storey mixed-use development to contain: (a) 14 no. Apartments (4 no. Studios and 10 no. 1-bed units), (b) Community Facility (30 sqm) at ground level, (c) Bike and Bin store at ground level, and (d) Communal Amenity Space (75 sqm) at terrace at Fifth floor; and (iv) All associated site works.
- 1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5 Application declared invalidWe, Black Sheep Investments Limited, intend to apply for Permission for development at this site: 1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5. The development will consists of: (i) Demolition of non-original extension of the existing public house, the Ardee House; (ii) Part-demolition of the existing original fabric of public house structure, with the selective retention of external façades; (iii) Construction of a part six-storey mixed-use development to contain: (a) 14 no. Apartments (4 no. Studios and 10 no. 1-bed units), (b) Community Facility (30 sqm) at ground level, (c) Bike and Bin store at ground level, and (d) Communal Amenity Space (75 sqm) at terrace at Fifth floor; and (iv) All associated site works.
- The Coombe Women and Infants University Hospital, Dolphin's Barn Street, Dublin 8, D08 XW7X Grant permission(i) Planning permission (on a permanent basis) for 3 no. flagpoles (2 no. measuring 6m in height and 1 no. measuring 7m in height) with mounted flags for symbolic use and measuring 1.2m x 1.8m on the 6m high flagpoles and the flag on the 7m high flagpole measuring 1.2m x 2.4m, all located to the northwest corner of the site. Permanent flagpoles to be finished in white fibreglass proprietary with concrete foundation. (ii) Planning permission is sought for a temporary period of 6 months for flagpoles for the display of artwork associated with the bicentenary celebrations for The Coombe Hospital, comprising of: (a) the erection of 12 no. flagpoles measuring 6m in height with mounted flags measuring 0.9m x 1.8m, fixed to existing boundary railings along the western boundary. Temporary flagpoles to be finished in white fibreglass proprietary; and (b) a temporary informational sign measuring 3.8m x 1.5m, fixed to existing boundary railings along the western boundary, located next to the main site entrance from Dolphin's Barn Street (R110). All flags and signage are non-illuminated and face onto Dolphin's Barn Street (R110).
- The Maltings Business Park, 54/55 Marrowbone Lane, Dublin 8 Additional informationRETENTION: Retention permission for (1) a formed pedestrian access from Marrowbone Lane to The Maltings Business Park and (2) retention of single storey Storage Unit circa 45sqm situated beside the carpark of The Maltings Business Park and all associated site works.
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
Source: npad · fetched 14 Sept 2026, 20:39
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 14 Sept 2026, 20:39 | open |
Appeals 30 in 5 years within 500 m
- ACP 500827 on WEB2373/25 Granted with conditions
- ACP 500351 on WEB5136/25 Granted
- ACP 324129 on 0551/25 Pending
- ACP 323354 on VS-0043 Other
- ACP 321836 on WEB2553/24 Withdrawn
- ACP 321430 on 4301/24 Refused
- ACP 321865 on 4399/24 Refused
- ACP 321677 on 4346/24 Refused
- ACP 320481 on 3687/24 Granted with conditions
- ACP 320027 on VS-0043 Other
Source: acp · fetched 12 Sept 2026, 00:05
| Source | Licence | Fetched | Link |
|---|---|---|---|
| acp | CC-BY-4.0 | 12 Sept 2026, 00:05 | open |
Commencement notices 53 in 3 years within 500 m
- 8 Huxley Crescent, Dublin 8, D08 H7V7 — Opt out commencement notice
- Clarence Mangan Road, Dublin 8, D08 W0X7 — Commencement notice
- 10 Cameron Street, Dublin 8, D08 N2X2 — Short commencement notice
- 14 O'Donovan Road, Dublin 8, D08 H9N6 — Short commencement notice
- Unit 3 Newmarket Yards, Dublin 8, D08 A5XK — Commencement notice
- Sweeney's Terrace, Dublin 8 — Seven day notice
- 7 Pim Street, Dublin 8, D08 EK76 — Seven day notice
- 78 Donore Avenue, DUBLIN, Dublin 8, D08 PP2X — Commencement notice
- Brickfield Student Accommodation, Brown Street South, Dublin 8, D08 NY50 — Commencement notice
- Clarence Mangan Road, Dublin, Dublin 8, D08 W0X7 — Commencement notice
One notice can cover many buildings — count notices, never building rows, or a single multi-unit scheme reads as a trend (T11).
Source: bcms · fetched 14 Sept 2026, 23:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| bcms | CC-BY-4.0 | 14 Sept 2026, 23:44 | open |
Sales 1440 in 36 months within 500 m
€17,000 – €189,392,526, 15 Sept 2023 to 4 Sept 2026.
| Address | Sold | Price | Asking | Type | Beds | m² | €/m² | BER | Dist. |
|---|---|---|---|---|---|---|---|---|---|
| 39 EARLS COURT, REUBEN ST, DUBLIN 8 | 4 Sept 2026 | €392,000 | — | — | — | — | — | — | 263 m |
| 15 EBENEZAR TERRACE, DONORE AVE, DUBLIN 8 | 3 Sept 2026 | €584,000 | — | — | — | — | — | — | 263 m |
| 69 PIMLICO, DUBLIN 8, DUBLIN | 3 Sept 2026 | €490,000 | €425,000 | Terrace | 2 | 91 | 5,385 | E2 | 263 m |
| 57 BRABAZON HALL, ARDEE ST, DUBLIN 8 | 3 Sept 2026 | €375,000 | — | — | — | — | — | — | 263 m |
| 26 BISHOPSMEDE, CLANBRASSIL ST UPPER, DUBLIN 8 | 2 Sept 2026 | €480,000 | — | — | — | — | — | — | 263 m |
| 44 WARREN ST, PORTOBELLO, DUBLIN 8 | 1 Sept 2026 | €642,500 | — | — | — | — | — | — | 263 m |
| 56 NASH ST, INCHICORE, DUBLIN 8 | 1 Sept 2026 | €498,500 | €395,000 | Terrace | 2 | 87 | 5,730 | C2 | 263 m |
| 36 RIALTO COURT, RIALTO ST, RIALTO DUBLIN 8 | 1 Sept 2026 | €304,000 | — | — | — | — | — | — | 263 m |
| 15 LENNOX ST, PORTEBELLO, DUBLIN 8 | 31 Aug 2026 | €1,410,000 | — | — | — | — | — | — | 263 m |
| 49 RAYMOND ST, DUBLIN 8, DUBLIN | 31 Aug 2026 | €935,000 | — | — | — | — | — | — | 263 m |
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Sources: cara_listings, daft_gateway, ppr · fetched 11 Sept 2026, 20:14
| Source | Licence | Fetched | Link |
|---|---|---|---|
| cara_listings | Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped. | 11 Sept 2026, 20:14 | open |
| daft_gateway | Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data. | 14 Sept 2026, 22:12 | open |
| ppr | PSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.' | 14 Sept 2026, 20:32 | open |
Consultations 4 matched by place
- Public Participation in the Identification of New Bathing Waters 10 days left
- iMEND 1 - Portobello Community Engagement 17 days left
- Lansdowne Valley Park Active Travel Scheme 23 days left
- Dublin District Heating Project Part 8 36 days left
Source: consult · fetched 12 Sept 2026, 02:04
| Source | Licence | Fetched | Link |
|---|---|---|---|
| consult | public | 12 Sept 2026, 02:04 | open |
Council items 10 in 24 months
- Report No. 162/2026 of the Executive Manager (D. O'Connor) - With reference to the proposed grant of a further 10-year Lease of Unit 2, Bridgefoot Street, Dublin 8 to Peter McVerry Trust CLG
- Councillor Lesley Byrne To ask the Executive Manager to provide details of all legal costs, settlements, and compensation payments made by Dublin City Council in relation to claims brought by tenants in the South West Inner City concerning mould, damp, and related housing condition issues over the past five years.
- South Central Area Matters 1. Housing Maintenance Report. 2. 2nd Notification under Part 8 Planning and Development Regulations 2001. Proposed redevelopment of School Street Thomas Court Bawn including associated external works situated at School Street, Dublin 8. 3. Community Funds & Informal Adult Education Grants 2026. 4. Executive Manager Report.
- Councillor Lesley Byrne To ask the Executive Manager can the City Council investigate the issue of multiple abandoned vehicles and associated illegal dumping in the Merton Park, Greenville Avenue, Dufferin Avenue, Oscar Square, and Susan Terrace areas of Dublin 8? Over the past several weeks, residents have observed numerous vehicles that appear to be abandoned. Many of these vehicles have:
- Councillor Ciarán Ó’Meachair To ask the Executive Manager for the total number of units in the South-West Inner- City on the Derelict Sites Register, and what plans exist to make a Compulsory Purchase Order on any of these properties.
- South Central Area Matters
- COUNCILLOR LESLEY BYRNE To ask the Chief Executive if Dublin City Council has considered whether the planning permission for The Eight Building in Newmarket Square, which included provision for a community market and artist studios, is being fully implemented; and if the Council can confirm what measures, if any, are in place or planned to ensure that the original
- Councillor Lesley Byrne To ask the Executive Manager to address safety at the junction of Ardee Street, Oscar Square, Mill Street, and Clarence Mangan Road, including measures to slow traffic, improve visibility, and provide safe pedestrian crossings, such as zebra crossings. Could funding from local property tax resources be considered to
- COUNCILLOR LESLEY BYRNE To ask the Chief Executive to update on the co-living development at 113–122 Cork Street (Liberties House), specifically:
- South Central Area Matters
Source: moderngov · fetched 14 Sept 2026, 21:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| moderngov | public | 14 Sept 2026, 21:51 | open |
Capacity and public land
No publishable utility-capacity record within the radius. 54 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
- Dublin City Council — Dublin city and suburbs
- Dublin City Council — Dublin city and suburbs
- Dublin City Council — Dublin city and suburbs
- Dublin City Council — Dublin city and suburbs
- Health Service Executive — Dublin city and suburbs
- Dublin City Council — Dublin city and suburbs
- Dublin City Council — Dublin city and suburbs
- Dublin City Council — Dublin city and suburbs
Sources: esbn, lda_lands · fetched 11 Sept 2026, 16:42
| Source | Licence | Fetched | Link |
|---|---|---|---|
| esbn | all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only | 11 Sept 2026, 16:42 | open |
| lda_lands | CC-BY-4.0 | 11 Sept 2026, 16:43 | open |
Schools and public transport within 1.0 km
Schools
- Presentation College
- SCOIL TREASA NAOFA
- ST BRIGIDS PRIMARY SCHOOL
- PRESENTATION PRIMARY SCHOOL
- Canal Way Educate Together National School
- C.B.S. James Street
- ST. JAMES'S PRIMARY SCHOOL
- ST CATHERINES WEST N S
Stops 92 · routes 122, 125, 13, 150, 151, 16, 16D, 23, 24, 27, 37, 39, 39A, 4, 51D, 52, 56A, 60, 68, 68A, 69, 69X, 69n, 70, 73, 74, 77A, 77X, 77n, 782, 783, 80, 845, 847, 860, C1, C2, C3, C4, C5, C6, F1, F2, F3, G1, G2, N2, P29, Red, S2, X25, X26, X27, X28, X30, X31, X32
- Weaver Park
- Weaver Park
- Cork Street
- Cork Street
- Ardee St
- Ardee St
- Oscar Square
- Newmarket
Sources used in this report
| Section | Source | Licence | Fetched |
|---|---|---|---|
| Location | places | CC-BY-4.0 | 11 Sept 2026, 21:28 |
| Parcel | parcels | CC-BY-4.0 | 11 Sept 2026, 19:06 |
| Zoning | zoning | CC-BY-4.0 | 12 Sept 2026, 02:04 |
| Constraints | constraints | mixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false) | 11 Sept 2026, 19:11 |
| Constraints | constraints.epa_licence | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Constraints | constraints.flood_cfram | CC-BY-NC-ND-4.0 · not redistributable, flag only | 11 Sept 2026, 19:11 |
| Constraints | constraints.niah | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Constraints | constraints.radon | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Constraints | constraints.smr | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Rzlt | rzlt | CC-BY-4.0 | 12 Sept 2026, 00:23 |
| Planning | npad | CC-BY-4.0 | 14 Sept 2026, 20:39 |
| Appeals | acp | CC-BY-4.0 | 12 Sept 2026, 00:05 |
| Commencements | bcms | CC-BY-4.0 | 14 Sept 2026, 23:44 |
| Sales | cara_listings | Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped. | 11 Sept 2026, 20:14 |
| Sales | daft_gateway | Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data. | 14 Sept 2026, 22:12 |
| Sales | ppr | PSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.' | 14 Sept 2026, 20:32 |
| Consultations | consult | public | 12 Sept 2026, 02:04 |
| Council items | moderngov | public | 14 Sept 2026, 21:51 |
| Capacity | esbn | all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only | 11 Sept 2026, 16:42 |
| Public land | lda_lands | CC-BY-4.0 | 11 Sept 2026, 16:43 |
| Projects | social_housing | CC-BY-SA-4.0 | 11 Sept 2026, 20:13 |
| Amenities | gtfs | CC-BY-4.0 | 11 Sept 2026, 19:16 |
| Amenities | schools | CC-BY-4.0 | 11 Sept 2026, 16:41 |
| Deadlines | acp | CC-BY-4.0 | 12 Sept 2026, 00:05 |
| Deadlines | consult | public | 12 Sept 2026, 02:04 |
| Deadlines | moderngov | public | 14 Sept 2026, 21:51 |
| Deadlines | npad | CC-BY-4.0 | 14 Sept 2026, 20:39 |
| Deadlines | rzlt | CC-BY-4.0 | 12 Sept 2026, 00:23 |
Generated 15 Sept 2026, 05:58 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.