We, St. James’s National School, intend to apply for planning permission for development St. James’s National School, Basin View, Dublin 8. The site is located immediately to the south of the school, north of James’s Walk and west of The Hops, Basin View, Dublin 8.
The proposed development comprises of the following:
• Removal of the existing structures, including a shed and storage container and all associated site clearance works;
• Relocation of the play frame within the inner courtyard of the school;
• Upgrade of the existing school playground to provide a synthetic all-weather sports pitch with a total area of approx. 2,400 sq.m, incorporating 2 no. overlapping sports playing field measuring approx. 40m X 30m each;
• Provision of 12 no. Sheffield stands accommodating 24 no. bicycle parking spaces and associated pedestrian pathways;
• Revisions to the existing boundary wall onto James’s Walk to facilitate maintenance vehicle access;
• Provision of perimeter mesh fencing with ball stop netting above, floodlighting on 4 no. columns measuring 10.5m in height, drainage infrastructure, retaining walls, hard and soft landscaping works and all associated site development works.
We, Black Sheep Investments Limited, intend to apply for Permission for development at this site: 1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5. The development will consists of:
(i) Demolition of non-original extension of the existing public house, the Ardee House;
(ii) Part-demolition of the existing original fabric of public house structure, with the selective retention of external façades;
(iii) Construction of a part six-storey mixed-use development to contain: (a) 14 no. Apartments (4 no. Studios and 10 no. 1-bed units), (b) Community Facility (30 sqm) at ground level, (c) Bike and Bin store at ground level, and (d) Communal Amenity Space (75 sqm) at terrace at Fifth floor; and
(iv) All associated site works.
WEB2243/26received 22 May 2026decided 10 Jul 202614 units222 m away
We, Black Sheep Investments Limited, intend to apply for Permission for development at this site: 1-2 Chamber Street, at the junction with Ardee Street and Chamber Street, Dublin 8, D08 H3K5. The development will consists of:
(i) Demolition of non-original extension of the existing public house, the Ardee House;
(ii) Part-demolition of the existing original fabric of public house structure, with the selective retention of external façades;
(iii) Construction of a part six-storey mixed-use development to contain:
(a) 14 no. Apartments (4 no. Studios and 10 no. 1-bed units),
(b) Community Facility (30 sqm) at ground level,
(c) Bike and Bin store at ground level, and
(d) Communal Amenity Space (75 sqm) at terrace at Fifth floor; and
(iv) All associated site works.
WEB2208/26received 19 May 2026decided 21 May 2026222 m away
RETENTION: Retention permission for (1) a formed pedestrian access from Marrowbone Lane to The Maltings Business Park and (2) retention of single storey Storage Unit circa 45sqm situated beside the carpark of The Maltings Business Park and all associated site works.
WEB2124/26received 7 May 2026decided 26 Jun 2026201 m away
RETENTION PERMISSION for (1) a formed pedestrian access from Marrowbone Lane to The Maltings Business Park and (2) retention of single storey Storage Unit circa 45sqm situated beside the carpark of The Maltings Business Park and all associated site works.
WEB2090/26received 5 May 2026decided 6 May 2026201 m away
€17,000 – €189,392,526, 12 Sept 2023 to 4 Sept 2026.
Address
Sold
Price
Asking
Type
Beds
m²
€/m²
BER
Dist.
39 EARLS COURT, REUBEN ST, DUBLIN 8
4 Sept 2026
€392,000
—
—
—
—
—
—
250 m
15 EBENEZAR TERRACE, DONORE AVE, DUBLIN 8
3 Sept 2026
€584,000
—
—
—
—
—
—
250 m
69 PIMLICO, DUBLIN 8, DUBLIN
3 Sept 2026
€490,000
—
—
—
—
—
—
250 m
57 BRABAZON HALL, ARDEE ST, DUBLIN 8
3 Sept 2026
€375,000
—
—
—
—
—
—
250 m
26 BISHOPSMEDE, CLANBRASSIL ST UPPER, DUBLIN 8
2 Sept 2026
€480,000
—
—
—
—
—
—
250 m
44 WARREN ST, PORTOBELLO, DUBLIN 8
1 Sept 2026
€642,500
—
—
—
—
—
—
250 m
56 NASH ST, INCHICORE, DUBLIN 8
1 Sept 2026
€498,500
—
—
—
—
—
—
250 m
36 RIALTO COURT, RIALTO ST, RIALTO DUBLIN 8
1 Sept 2026
€304,000
—
—
—
—
—
—
250 m
15 LENNOX ST, PORTEBELLO, DUBLIN 8
31 Aug 2026
€1,410,000
—
—
—
—
—
—
250 m
49 RAYMOND ST, DUBLIN 8, DUBLIN
31 Aug 2026
€935,000
—
—
—
—
—
—
250 m
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 54 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Dublin City Council — Dublin city and suburbs
0.28 hafolio DN153973F47 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.4 hafolio DN153784F56 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.1 hafolio DN153973F63 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.5 hafolio DN153775F83 m awayas of 1 Apr 2023
Health Service Executive — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 12 Sept 2026, 19:14 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.