Planning report · South Dublin County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 04:51

Oldbridge Walk

53.33930, -6.43341

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (97%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 2 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1991–2000 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RES: To protect and/or improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares2
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 03:07
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 87–99% by type. A new house in a garden is harder: 56% approved, and 1 in 2 is asked for more information.

Single-storey rear31 decided · more info asked 10%
97% · council 96%
Two-storey rear16 decided · more info asked 56%
94% · council 99%
Two-storey side15 decided · more info asked 7%
87% · council 94%
Attic or dormer174 decided · more info asked 10%
99% · council 98%
New house in a garden or site9 decided · more info asked 44%
56% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 245 nearby, 2,451 council-wide

Extensions and refusals right beside you 5 within 250 m · 0 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

5 of 5 approved (100%) · most common: dormer or attic

5 approved
KindAppliedApprovedRefused
Dormer or attic33—
Two-storey rear22—

On Oldbridge: 16 extensions in 10 years, 71% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 7 is asked for more information, which adds about 67 days. Building starts about 2 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 126 days; Appeal window: 4 weeks; If appealed: +119 days; Building starts: 72 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 50–55 (n=243)55 daysIf more info asked (1 in 7)With further information: median 126 days (n=39)126 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 119 days (n=21, all appeals within 1.5 km)+119 daysBuilding startsStart notice: median 72 days after permission (n=142)72 days after permissionSigned off400 days after the start, for the few who file. 18% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated282 decided home extensions, 145 start notices, 21 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    2 of 6 appealed refusals became permissions. 2 of 19 appealed approvals were reversed.

    Refusals appealed6 decided
    2 became permissions
    Approvals appealed19 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Oldbridge Walk with 10 numbered planning items
    ⌖ the houseBuilding startedApproved
    1. 12 Oldbridge Green, Lucan SD26B/0129WBuilding started · 89 m
    2. 28 Oldbridge Green, Lucan SD26B/0263WBuilding started · 114 m
    3. 311 Oldbridge Close, Lucan SD26B/0308WApproved · 58 m
    4. 436, Griffeen Glen Boulevard SD25B/0669Approved · 75 m
    5. 513, Oldbridge Park SD25B/0672Approved · 177 m
    6. 612, Griffeen Glen Dale SD26B/0143WApproved · 252 m
    7. 717 Moy Glas Chase, Lucan SD26B/0247WApproved · 313 m
    8. 826, Griffeen Glen Avenue SD26B/0196Approved · 323 m
    9. 925 Roseberry Avenue, Lucan SD26B/0297WApproved · 348 m
    10. 1010, Moy Glas Wood SD26B/0277WApproved · 475 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 79 permissions since 2016, 35 show a start notice and 3 have a completion certificate.

    95 applications lodged within 500 m. Council: 79 approved, 9 refused. After appeals: 79 approved. Of those: 3 signed off, 5 built with the owner's opt-out, 27 started, 44 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT79: lodged → approved9: lodged → refused6: lodged → withdrawn or invalid1: lodged → undecided78: approved → approved6: refused → refused6: withdrawn or invalid → withdrawn1: undecided → undecided1 approved by the council, refused after an appeal1 refused by the council, approved after an appeal2 refused by the council, withdrawn or invalid after an appeal44: approved → no start notice found5: approved → built, owner opted out27: approved → started, not signed off3: approved → signed off95 lodged95 lodged79 approved79 approved9 refused9 refused6 withdrawn or invalid6 withdrawn or invalid1 undecided1 undecided79 approved79 approved7 refused7 refused8 withdrawn8 withdrawn1 undecided1 undecided44 no start notice found44 no start notice found5 built, owner opted out5 built, owner opted out27 started, not signed off27 started, not signed off3 signed off3 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured95 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 7

      Approved, stalled or planned, not built yet

      DART+ South West is planned 519 m away.

      DART+ South West, DART+ South…: railway order granted (13 November 2024); DART+ South West, Kishoge: railway order granted (13 November 2024)20242025202620272028DART+ South West, DART+ South…519 m · plannedrailway order granted (13 November 2024)DART+ South West, Kishoge583 m · plannedrailway order granted (13 November 2024)today

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Figure 8

      Applications within 500 m, by year

      Between 14 and 22 a year; busiest 2024. 90% of decisions were approvals.

      2021: 16, 2022: 16, 2023: 17, 2024: 22, 2025: 14, 2026: 1001020302021: 14 approved2021: 2 refused16’21*2022: 14 approved2022: 2 refused16’222023: 13 approved2023: 2 refused2023: 2 withdrawn or invalid17’232024: 18 approved2024: 2 refused2024: 2 withdrawn or invalid22’242025: 12 approved2025: 1 refused2025: 1 withdrawn or invalid14’252026: 8 approved2026: 1 withdrawn or invalid2026: 1 undecided10’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 12 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 5 in the last 12 months
      5 no sign-off needed
      • 28 Oldbridge Green, Lucan, Dublin, K78 X773 · 13 Oct 2026 · short notice no sign-off needed · SD26B/0263W · 114 m
      • 17 Moy Glas Chase, Lucan, Dublin, K78 D718 · 15 Sept 2026 · short notice no sign-off needed · SD26B/0247W · 329 m
      • 12 Griffeen Glen Dale, Lucan, Dublin, K78 YK35 · 11 Sept 2026 · short notice no sign-off needed · SD25B/0691W · 260 m
      • 12 Oldbridge Green, Lucan, Dublin, K78 WR82 · 13 Aug 2026 · short notice no sign-off needed · SD26B/0129W · 89 m
      • 11 Griffeen Glen Green, Lucan, South Dublin, K78 R289 · 4 Feb 2026 · start notice, opted out no sign-off needed · SD24B/0563 · 217 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Oldbridge · 19 applications in 10 years · 71% approved · most common: attic conversion / dormer

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Kishoge——23 m
      Lucan East Educate Together N. S——24 m
      Kishogue Cross——90 m
      Kishoge Development Area Sites 3, 4 and 51252—141 m
      Griffeen Avenue——265 m
      Existing Balgaddy 38kV Substation——333 m
      SDCC Lands @28 Locations——500 m
      Kishogue South West263—546 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Giraffe Childcare Griffeen · Crèche3 Mar 2025 · report · Tusla Early Years Inspectorate202 m
      Precious Minds Créche & Montessori School · Crèche16 Apr 2025 · report · Tusla Early Years Inspectorate283 m
      Montessori Matters Ltd · Crèche27 May 2025 · report · Tusla Early Years Inspectorate288 m
      Griffeen Valley Childcare · Crèche1 Apr 2025 · report · Tusla Early Years Inspectorate485 m
      Happy Tots · Crèche2 Dec 2024 · report · Tusla Early Years Inspectorate672 m
      Spraoi Montessori · Crèche24 Sept 2025 · report · Tusla Early Years Inspectorate772 m
      Learn And Laugh Childcare · Crèche25 May 2026 · report · Tusla Early Years Inspectorate777 m
      Hansel & Gretel Playschool · Crèche16 Sept 2024 · report · Tusla Early Years Inspectorateapprox. 982 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 02:01
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of South Dublin County Council.
      Homes approved
      Here2,574
      Council middle0
      Homes started
      Here1,061
      Council middle4
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      0% of homes built before 1971 (council 18%). 79% owner-occupied (council 67%).

      Homes built before 1971
      0% · council 18%
      Homes built since 2001
      29% · council 27%
      Owner-occupied
      79% · council 67%
      Rented
      14% · council 29%
      Children under 15
      28% · council 21%
      Aged 65 and over
      1% · council 13%
      Households with 2+ cars
      59% · council 40%
      Work mainly from home
      12% · council 10%
      This small area (292 people)South Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267100019

      Bus
      223 m
      Balgaddy Road · C1, C2, L53 · busiest stop within 500 m: 17 an hour at peak
      Planned
      519 m
      DART+ South West, DART+ South West: Hazelhatch and Celbridge - Dublin Heuston
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Nearest school
      125 m
      Lucan East ETNS, 416 pupils
      Homes sold nearby
      35
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Lucan East ETNS · primary · 416 pupils · 125 m
      • Griffeen Valley Educate Together NS · primary · 466 pupils · 228 m
      • Griffeen Community College · postprimary · 576 pupils · 613 m
      • Kishoge Community College · postprimary · 937 pupils · 613 m
      • Lucan Community National School · primary · 375 pupils · 909 m

      Stops 33

      • Balgaddy Road · C1, C2, L53 · 15/hour at peak · 223 m
      • Moy Glas Dene · C1, C2, L53 · 8/hour at peak · 242 m
      • Rossberry Avenue · C2, L53 · 8/hour at peak · 259 m
      • Rossberry Avenue · C2, L53 · 5/hour at peak · 265 m
      • Foxborough Rise · 151, W4 · 7/hour at peak · 313 m
      • Griffeen Road · C1 · 3/hour at peak · 353 m
      • Griffeen Avenue · W4 · 3/hour at peak · 387 m
      • Foxborough Park · C1, C2, L53, L54 · 10/hour at peak · 408 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Lucan East ETNS · 125 m-2.6% pupils (416)
      • Griffeen Valley Educate Together NS · 228 m-2.9% pupils (466) · an extension 2025, approved
      • Kishoge Community College · 613 m+1.3% pupils (937) · an extension 2025, approved · a sports hall 2024, approved
      • Griffeen Community College · 613 m+7.3% pupils (576) · an extension 2025, approved
      • Lucan Community National School · 909 m-2.1% pupils (375)

      Open consultations

      Council meetings 30 items

      Public land

      • South Dublin County Council · 0.13 ha · 23 m
      • South Dublin County Council · 0.25 ha · 23 m
      • The Minister for Education and Skills · 0.88 ha · 24 m
      • Dublin City Council · 0.3 ha · 44 m
      • South Dublin County Council · 0.12 ha · 46 m
      • Dublin City Council · 0.26 ha · 54 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 02:24
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Building work started 89 m away: for how long?
        Ask for: The planning conditions for SD26B/0129W.
        Agent · council
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Kishoge
      Electoral division
      Lucan-Esker
      Electoral area
      Lucan
      Council
      South Dublin County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • Nothing nearby looks set to change.
      • Foxborough Pl (bus 151, C1) 476 m away: 17 an hour at morning peak; 90 from all stops within 500 m. Planned: DART+ South West 519 m away, railway order granted (13 November 2024).
      • Inside Dublin Airport Noise Zone D.
      • Here (2022 census): 79% owner-occupied (council 66%); 0% of homes empty (council 4%); most built 1991–2000; 65% drive to work (council 54%); population up 5% since 2016.
      • 5 home extensions within 250 m since 2025: 5 approved (100%). Most were dormers or attic conversions. On Oldbridge: 16 in 10 years, 71% approved.
      • Around here the council decides in a median 51 days (about 7 weeks); 1 in 7 is asked for more information.
      • Homes started within 1 km: 817 in the last year, 74 three years before.
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 28
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 04:51 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.