Planning report · Dublin City Council · 500 m around the house · the last 12 months · 10 Nov 2026, 13:43

Ramillies Road

53.33997, -6.34412

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (96%). 2 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 6 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1946–1960 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Jamestown Shot Blasting & Metal Coating Limited (431 m); Henkel Ireland Operations and Research Limited (Ballyfermot) (501 m); Jamestown Metal Resources Limited (505 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Licensed industrial sites1Jamestown Shot Blasting & Metal Coating Limited
Heritage inventory buildings1post box
Radon grid squares3
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 10 Nov 2026, 00:04
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.08 Nov 2026, 23:20open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.010 Nov 2026, 00:04open
Residential Zoned Land Tax mapsCC BY 4.09 Nov 2026, 00:15open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 10 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.010 Nov 2026, 04:54open
National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–98% by type. A new house in a garden is harder: 82% approved, and 1 in 3 is asked for more information.

Single-storey rear26 decided · more info asked 4%
96% · council 97%
Two-storey rear34 decided · more info asked 6%
94% · council 96%
Two-storey side12 decided · more info asked 25%
92% · council 97%
Attic or dormer52 decided · more info asked 8%
98% · council 96%
New house in a garden or site22 decided · more info asked 32%
82% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 146 nearby, 4,874 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 10 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.06 Nov 2026, 23:04open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 10 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.06 Nov 2026, 23:04open
    Building Control Management System (commencement notices)CC BY 4.010 Nov 2026, 04:54open
    National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 10 is asked for more information, which adds about 48 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 10): 110 days; Appeal window: 4 weeks; If appealed: +172 days; Building starts: 114 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–55 (n=152)55 daysIf more info asked (1 in 10)With further information: median 110 days (n=17)110 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 172 days (n=26, all appeals within 1.5 km)+172 daysBuilding startsStart notice: median 114 days after permission (n=60)114 days after permissionSigned off56% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated169 decided home extensions, 61 start notices, 26 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    2 of 12 appealed refusals became permissions. 2 of 15 appealed approvals were reversed.

    Refusals appealed12 decided
    2 became permissions
    Approvals appealed15 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Ramillies Road with 5 numbered planning items
    ⌖ the houseOpen for commentsApprovedNo decision yet
    1. 1142, Le Fanu Road 5235/26No decision yet · 411 m
    2. 2187 Decies Road, Ballyfermot WEB1328/26Approved · 69 m
    3. 3304 Ballyfermot Road, Dublin 10 WEB3017/26No decision yet · 253 m
    4. 4Dartmouth House, Kylemore Road WEB2438/26No decision yet · 369 m
    5. 547, O'Hogan Road WEB1602/26Approved · 491 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 37 permissions since 2016, 10 show a start notice and 2 have a completion certificate.

    48 applications lodged within 500 m. Council: 37 approved, 1 refused. After appeals: 37 approved. Of those: 2 signed off, 5 built with the owner's opt-out, 3 started, 27 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT37: lodged → approved1: lodged → refused5: lodged → withdrawn or invalid5: lodged → undecided37: approved → approved1: refused → refused5: withdrawn or invalid → withdrawn5: undecided → undecided27: approved → no start notice found5: approved → built, owner opted out3: approved → started, not signed off2: approved → signed off48 lodged48 lodged37 approved37 approved1 refused1 refused5 withdrawn or invalid5 withdrawn or invalid5 undecided5 undecided37 approved37 approved1 refused1 refused5 withdrawn5 withdrawn5 undecided5 undecided27 no start notice found27 no start notice found5 built, owner opted out5 built, owner opted out3 started, not signed off3 started, not signed off2 signed off2 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured48 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    3 deadlines within 500 m; the first closes 24 Nov 2026.

    3 deadlines in the next 30 days: 2026-11-24 5235/26: application received — Planning permission for the construction of a first-floor extension over existing ground floor extension with alteration; 2026-11-26 WEB3199/26: SPLIT DECISION(PERMISSION & REFUSAL) — The development will consist of a single storey front extension plus a two-storey side extension plus relocation of vehi; 2026-11-27 WEB3605/26: application received — The development will consist of the material change of use of part of the existing learning centre from a non-residentiatoday15 Nov20 Nov25 Nov30 Nov5 Dec10 Dec5235/26: application received — Planning permission for the construction of a first-floor extension over existing ground floor extension with alteration · 411 m away · 2026-11-24WEB3199/26: SPLIT DECISION(PERMISSION & REFUSAL) — The development will consist of a single storey front extension plus a two-storey side extension plus relocation of vehi · 411 m away · 2026-11-26WEB3605/26: application received — The development will consist of the material change of use of part of the existing learning centre from a non-residentia · 411 m away · 2026-11-27
    Comments closeTime to appeal ends
    • Comments close 24 Nov 202614 days left
      15235/26 · application received — Planning permission for the construction of a first-floor extension over existing ground floor…
      €20 to the council · 411 m away
    • Time to appeal ends 26 Nov 202616 days left
      WEB3199/26 · SPLIT DECISION(PERMISSION & REFUSAL) — The development will consist of a single storey front extension plus a…
      €220 to An Coimisiún Pleanála (€110 observer) · 411 m away
    • Comments close 27 Nov 202617 days left
      WEB3605/26 · application received — The development will consist of the material change of use of part of the existing learning…
      €20 to the council · 411 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    DART+ South West is planned 226 m away.

    DART+ South West, DART+ South…: railway order granted (13 November 2024)20242025202620272028DART+ South West, DART+ South…226 m · plannedrailway order granted (13 November 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Figure 8

    Applications within 500 m, by year

    Between 3 and 11 a year; busiest 2025. 97% of decisions were approvals.

    2021: 8, 2022: 8, 2023: 6, 2024: 3, 2025: 11, 2026: 12051015202021: 8 approved8’21*2022: 8 approved8’222023: 6 approved6’232024: 3 approved3’242025: 10 approved2025: 1 withdrawn or invalid11’252026: 2 approved2026: 1 refused2026: 4 withdrawn or invalid2026: 5 undecided12’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 12 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 10 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.06 Nov 2026, 23:04open
    Building Control Management System (commencement notices)CC BY 4.010 Nov 2026, 04:54open
    Building work nearby 3 in the last 12 months
    1 not signed off2 no sign-off needed
    • Ballyfermot Road, Dublin · 8 Jul 2026 · 7-day notice not signed off · WEBLRD6088/25-S3A · 460 m
    • 31 Kylemore Avenue, Dublin 10, D10 FA03 · 15 May 2026 · start notice, opted out no sign-off needed · 3213/25 · 465 m
    • 103 Thomond Road, Ballyfermot, Dublin 10, D10 AD83 · 27 Apr 2026 · start notice, opted out no sign-off needed · 237 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 10 Nov 2026, 04:54
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.010 Nov 2026, 04:54open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 10 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.06 Nov 2026, 23:04open
    Building Control Management System (commencement notices)CC BY 4.010 Nov 2026, 04:54open
    National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
    Social housing construction status reportCC BY-SA 4.06 Nov 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Former De La Salle National School897531 built · 139 being built · 227 not started (2026-Q2)234 m
    Ballyfermot Road Apartments2727 built (2025-Q4)473 m
    Former Faulkners Industries Factory2424 not started (2026-Q2)670 m
    86 and 90-96 Jamestown Road128128 not started (2026-Q2)790 m
    Bluebell Waterways383249 being built · 134 not started (2026-Q2)853 m
    Quadrant House106106 not started (2026-Q2)871 m
    Ballyfermot United Sports and Social Club2222 not started (2026-Q2)893 m

    Who applies most nearby

    • Civil Engineering Limited — 2 applications, latest 11 Jun 2026

    Crèches and schools inspected

    NameLatest inspectionDistance
    Woodlands Creche · Crèche9 Dec 2024 · report · Tusla Early Years Inspectorate374 m
    St. Michael's Preschool & Afterschool Service · Crèche19 Mar 2026 · report · Tusla Early Years Inspectorate425 m
    St. Raphael's Preschool & Afterschool Project · Crèche10 Feb 2025 · report · Tusla Early Years Inspectorate431 m
    Teanga Beo Baile Formaid Cuideachta Faoi Theorainn Ráthaíochta · Crèche30 Sept 2025 · report · Tusla Early Years Inspectorate585 m
    Treasure Tots Nursery · Crèche23 Feb 2026 · report · Tusla Early Years Inspectorate664 m
    Chestnut Daycare Ltd · Crèche23 Apr 2025 · report · Tusla Early Years Inspectorate722 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 10 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.09 Nov 2026, 23:01open
    National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
    Applicant organisations (from the CRO)Derived by Planning Register8 Nov 2026, 23:02—
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register4 Nov 2026, 23:36open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here51
    Council middle50
    Homes started
    Here1,119
    Council middle125
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 10 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.06 Nov 2026, 23:04open
    Building Control Management System (commencement notices)CC BY 4.010 Nov 2026, 04:54open
    National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    92% of homes built before 1971 (council 52%). 62% owner-occupied (council 47%).

    Homes built before 1971
    92% · council 52%
    Homes built since 2001
    1% · council 19%
    Owner-occupied
    62% · council 47%
    Rented
    23% · council 45%
    Children under 15
    14% · council 15%
    Aged 65 and over
    20% · council 13%
    Households with 2+ cars
    23% · council 19%
    Work mainly from home
    3% · council 12%
    This small area (305 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268057008

    Bus
    102 m
    Ramillies Road · 60 · busiest stop within 500 m: 10 an hour at peak
    Planned
    226 m
    DART+ South West, DART+ South West: Hazelhatch and Celbridge - Dublin Heuston
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    396 m
    St Gabriels Ns, 211 pupils
    Homes sold nearby
    258
    in 3 years, 3 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Gabriels Ns · primary · 211 pupils · 396 m
    • St Raphaels Ns · primary · 380 pupils · 431 m
    • St Michaels Ns · primary · 314 pupils · 461 m
    • Kylemore College · postprimary · 479 pupils · 762 m
    • St. Seton's Secondary School · postprimary · 741 pupils · 886 m
    • St Patricks Ns · primary · 203 pupils · 959 m

    Stops 43

    • Ramillies Road · 60 · 1/hour at peak · 102 m
    • Decies Road · 60 · 1/hour at peak · 115 m
    • Thomond Road · 60 · 1/hour at peak · 147 m
    • Garryowen Road · 60 · 1/hour at peak · 162 m
    • Thomond Road · 60 · 1/hour at peak · 247 m
    • Markievicz Park · G1, G2 · 10/hour at peak · 263 m
    • Markievicz Park · G1, G2 · 9/hour at peak · 266 m
    • Ballyfermot Cr · 60, S4 · 8/hour at peak · 279 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Gabriels Ns · 396 m-9.8% pupils (211)
    • St Raphaels Ns · 431 m+0.8% pupils (380)
    • St Michaels Ns · 461 m-5.1% pupils (314)
    • Kylemore College · 762 m+2.8% pupils (479)
    • St. Seton's Secondary School · 886 m-4.8% pupils (741)
    • St Patricks Ns · 959 m+0.5% pupils (203)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.11 ha · 151 m
    • Córas Iompair Éireann · 25.7 ha · 234 m
    • Dublin City Council · 0.28 ha · 237 m
    • Dublin City Council · 0.14 ha · 272 m
    • Dublin City Council · 0.12 ha · 287 m
    • Dublin City Council · 1.59 ha · 389 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 10 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.08 Nov 2026, 23:06open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.010 Nov 2026, 05:03open
    Council consultation portalsPublic10 Nov 2026, 01:21open
    Council meetings (ModernGov)Public10 Nov 2026, 02:40open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 411 m away open for comments until 24 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Decies
    Electoral area
    Ballyfermot-Drimnagh
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • 2 applications open for comments nearby; nearest closes 24 Nov 2026.
    • St Gabriel's School (bus 860, G1) 342 m away: 14 an hour at morning peak; 118 from all stops within 500 m. Planned: DART+ South West 226 m away, railway order granted (13 November 2024).
    • Here (2022 census): 62% owner-occupied (council 47%); 1% of homes empty (council 8%); most built 1946–1960; 44% drive to work (council 28%); population up 1% since 2016.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    • Homes started within 1 km: 252 in the last year, 845 three years before.
    • 12 applications nearby in the last 12 months.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 31
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.06 Nov 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.010 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public10 Nov 2026
    www2.courts.ie—© the publisher9 Nov 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.09 Nov 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.09 Nov 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.010 Nov 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.08 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public10 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.010 Nov 2026
    organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register8 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence10 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.09 Nov 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.06 Nov 2026
    tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.08 Nov 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 10 Nov 2026, 13:43 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.