PlanningRegister.ie
Planning report · Kildare County Council · 500 m around the house · the last 12 months · 10 Oct 2026, 06:50

Saint Patrick's Park

53.34015, -6.54792

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (97%). 37 homes approved 327 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1946–1960 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: HDS Energy Limited (465 m); General Paints Limited (580 m)

Vacant land taxYes 3% of the land's value a year
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Licensed industrial sites1HDS Energy Limited
Heritage inventory buildings10Holy Faith Convent; Oakly Park
Radon grid squares1
Monuments5Ecclesiastical enclosure; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 44 on the draft 2027 map; 44 on the final 2026 map.
Sources: zoning, constraints.radon, epa_leap, rzlt, constraints, constraints.epa_licence, constraints.flood_cfram, constraints.niah, constraints.smr · fetched 4 Oct 2026, 23:11
SourceLicenceFetchedLink
zoningCC-BY-4.04 Oct 2026, 23:11open
constraints.radonCC-BY-4.027 Sept 2026, 19:36open
epa_leapCC-BY-4.05 Oct 2026, 23:09open
rzltCC-BY-4.04 Oct 2026, 23:59open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.epa_licenceCC-BY-4.027 Sept 2026, 19:36open
constraints.flood_cframCC-BY-NC-ND-4.0 · not redistributable — shown as a flag only11 Sept 2026, 19:11open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 9 Oct 2026, 23:23
SourceLicenceFetchedLink
bcmsCC-BY-4.09 Oct 2026, 23:23open
npadCC-BY-4.010 Oct 2026, 01:42open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 88–100% by type. A new house in a garden is harder: 62% approved, and 1 in 3 is asked for more information.

Single-storey rear65 decided · more info asked 12%
98% · council 98%
Two-storey rear17 decided · more info asked 59%
88% · council 94%
Two-storey side25 decided · more info asked 16%
96% · council 96%
Single-storey side27 decided · more info asked 7%
100% · council 98%
Attic or dormer72 decided · more info asked 31%
100% · council 87%
First-floor17 decided · more info asked 47%
88% · council 93%
New house in a garden or site24 decided · more info asked 33%
62% · council 57%
Approved nearbyKildare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 247 nearby, 5,191 council-wide

Extensions and refusals right beside you 4 within 250 m · 0 refused within 100 m

Extensions and refusals near you 4 extensions within 250 m · the last 12 months

2 approved2 no decision or withdrawn
KindAppliedApprovedRefused
Rear21—
Other11—
Single-storey side10—

On Saint Patrick's Park: 13 extensions in 10 years, 92% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 10 Oct 2026, 01:42
    SourceLicenceFetchedLink
    npadCC-BY-4.010 Oct 2026, 01:42open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.09 Oct 2026, 23:23open
    npadCC-BY-4.010 Oct 2026, 01:42open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 53 days. 1 in 4 is asked for more information, which adds about 70 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 4): 118 days; Appeal window: 4 weeks; Building starts: 108 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–55 (n=202)53 daysIf more info asked (1 in 4)With further information: median 118 days (n=60)118 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 108 days after permission (n=57)108 days after permissionSigned off65% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated262 decided home extensions, 57 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    1 of 10 appealed refusals became permissions. 1 of 24 appealed approvals were reversed.

    Refusals appealed10 decided
    1 became permissions
    Approvals appealed24 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Saint Patrick's Park with 14 numbered planning items
    ⌖ the houseWindow closingEmpty land zoned for homesApprovedNo decision yetRefused
    1. 1Celbridge Lodge, Tea Lane / Church Road 2660381Approved with conditions · 147 m
    2. 23.5 ha zoned for homesEmpty land zoned for homes · 61 m
    3. 33.0 ha zoned for homesEmpty land zoned for homes · 91 m
    4. 45.1 ha zoned for homesEmpty land zoned for homes · 92 m
    5. 50.1 ha zoned for homesEmpty land zoned for homes · 103 m
    6. 61.0 ha zoned for homesEmpty land zoned for homes · 131 m
    7. 70.5 ha zoned for homesEmpty land zoned for homes · 142 m
    8. 837 Vanessa Lawns, Celbridge 2660822Approved with conditions · 171 m
    9. 9774 St. Patricks Park, Celbridge 2660676No decision yet · 183 m
    10. 1012 Priory View, St. Raphael's Manor 2660430Approved with conditions · 200 m
    11. 118 Oakley Gardens, Wolstan Haven 2660062Approved with conditions · 311 m
    12. 1239 Dara Court, Celbridge 2660131Refused · 388 m
    13. 1345 Dara Court, Maynooth Road 2660018Approved with conditions · 424 m
    14. 14Celbridge Shopping Centre, Celbridge 2660666No decision yet · 493 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 65 permissions since 2016, 8 show a start notice and 0 have a completion certificate.

    69 applications lodged within 500 m. Council: 66 approved, 3 refused. After appeals: 65 approved. Of those: 0 signed off, 3 built with the owner's opt-out, 5 started, 31 with no start notice found, 26 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT66: lodged → approved3: lodged → refused65: approved → approved3: refused → refused1 approved by the council, refused after an appeal31: approved → no start notice found3: approved → built, owner opted out5: approved → started, not signed off26: approved → ran out69 lodged69 lodged66 approved66 approved3 refused3 refused65 approved65 approved4 refused4 refused31 no start notice found31 no start notice found3 built, owner opted out3 built, owner opted out5 started, not signed off5 started, not signed off26 ran out26 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured69 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 15 Oct 2026.

    1 deadlines in the next 30 days: 2026-10-15 2660381: CONDITIONAL — of 115 no. residential units (a Large-scale Residential Development – LRD) at Celbridge Lodge, Tea Lane / Church Road, Ctoday15 Oct20 Oct25 Oct30 Oct4 Nov9 Nov2660381: CONDITIONAL — of 115 no. residential units (a Large-scale Residential Development – LRD) at Celbridge Lodge, Tea Lane / Church Road, C · 147 m away · 2026-10-15
    Time to appeal ends
    • Time to appeal ends 15 Oct 20265 days left
      12660381 · CONDITIONAL — of 115 no. residential units (a Large-scale Residential Development – LRD) at Celbridge Lodge, Tea Lane /…
      €220 to An Coimisiún Pleanála (€110 observer) · 147 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    37 homes 327 m away were approved Sept 2026 with no start notice yet; the permission runs to Sept 2031.

    Celbridge Lodge · 37 homes: 37 homes approved Sep 2026, not started202420252026202720282029203020312032Celbridge Lodge · 37 homes327 m · 266038137 homes approved Sep 2026, not started37 homes approved Sep 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 500 m

    Approved, not started 1

    Empty land zoned for homes 10

    • 23.5 ha zoned for homes · no homes built on it yet · 61 m
    • 33.0 ha zoned for homes · no homes built on it yet · 91 m
    • 45.1 ha zoned for homes · no homes built on it yet · 92 m
    • 50.1 ha zoned for homes · no homes built on it yet · 103 m
    • 61.0 ha zoned for homes · no homes built on it yet · 131 m
    • 70.5 ha zoned for homes · no homes built on it yet · 142 m
    • 2.1 ha zoned for homes · no homes built on it yet · 157 m
    • 0.6 ha zoned for homes · no homes built on it yet · 158 m
    • 0.9 ha zoned for homes · no homes built on it yet · 184 m
    • 2.6 ha zoned for homes · no homes built on it yet · 0 m

    Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

    Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.09 Oct 2026, 23:23open
    derelictCC-BY-4.05 Oct 2026, 09:35open
    npadCC-BY-4.010 Oct 2026, 01:42open
    Figure 8

    Applications within 500 m, by year

    Between 2 and 14 a year; busiest 2023. 96% of decisions were approvals.

    2017: 8, 2018: 7, 2019: 5, 2020: 6, 2021: 8, 2022: 8, 2023: 14, 2024: 2, 2025: 5, 2026: 6051015202017: 8 approved8’17*2018: 7 approved7’182019: 5 approved5’192020: 6 approved6’202021: 8 approved8’212022: 8 approved8’222023: 12 approved2023: 2 refused14’232024: 2 approved2’242025: 5 approved5’252026: 5 approved2026: 1 refused6’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 15 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 10 Oct 2026, 01:42
    SourceLicenceFetchedLink
    npadCC-BY-4.010 Oct 2026, 01:42open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.09 Oct 2026, 23:23open
    Building work nearby 2 in the last 12 months
    2 no sign-off needed
    • 8 Oakley Gardens, Celbridge, Wicklow, W23 NH63 · 21 Sept 2026 · short notice no sign-off needed · 26/60062 · 319 m
    • 36 Priory Drive, Celbridge, Kildare, W23 A313 · 6 Nov 2025 · short notice no sign-off needed · 2560473 · 458 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 9 Oct 2026, 23:23
    SourceLicenceFetchedLink
    bcmsCC-BY-4.09 Oct 2026, 23:23open
    Homes coming 37 not started
    • 1Celbridge Lodge · 37 homes · not started · runs out 17 Sept 2031 · 327 m
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.09 Oct 2026, 23:23open
    npadCC-BY-4.010 Oct 2026, 01:42open
    social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Saint Patrick's Park · 19 applications in 10 years · 92% approved · most common: attic conversion / dormer

    Crèches and schools inspected

    NameLatest inspectionDistance
    Naíonra Aoibhneas · Crèche21 Oct 2025 · report · Tusla Early Years Inspectorate628 m
    Memory Lane Playschool · Crèche24 Sept 2025 · report · Tusla Early Years Inspectorate628 m
    Choice Childcare · Crèche9 Apr 2024 · report · Tusla Early Years Inspectorate642 m
    Kiddies Choice Creche · Crèche16 Sept 2024 · report · Tusla Early Years Inspectorate642 m
    Happy Years Childcare · Crèche8 Jan 2024 · report · Tusla Early Years Inspectorate718 m
    The Purple Penguin Creche & Montessori · Crèche8 Oct 2024 · report · Tusla Early Years Inspectorate875 m
    Vivienne’s Playschool · Crèche10 Dec 2024 · report · Tusla Early Years Inspectorate907 m
    The Childrens’ Circle · Crèche20 Mar 2024 · report · Tusla Early Years Inspectorate935 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: estates, schools, tusla_ey · fetched 27 Sept 2026, 20:18
    SourceLicenceFetchedLink
    estatesODbL-1.0 (OSM) + CC-BY-SA-4.0 (NHDS) + CC-BY-4.0 (Kildare)27 Sept 2026, 20:18open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area Busier than most of Kildare County Council.
    Homes approved
    Here240
    Council middle0
    Homes started
    Here245
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.09 Oct 2026, 23:23open
    npadCC-BY-4.010 Oct 2026, 01:42open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    53% of homes built before 1971 (council 16%). 58% owner-occupied (council 71%).

    Homes built before 1971
    53% · council 16%
    Homes built since 2001
    11% · council 40%
    Owner-occupied
    58% · council 71%
    Rented
    29% · council 24%
    Children under 15
    12% · council 22%
    Aged 65 and over
    18% · council 12%
    Households with 2+ cars
    30% · council 51%
    Work mainly from home
    8% · council 12%
    This small area (323 people)Kildare

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 087023025

    Bus
    428 m
    Oldtown Road · L59, X27 · busiest stop within 500 m: 3 an hour at peak
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Flood
    Yes
    OPW flood map area within 100 m
    Nearest school
    312 m
    St Raphaels Special Sch, 96 pupils
    Homes sold nearby
    221
    in 3 years, 180 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Raphaels Special Sch · primary · 96 pupils · 312 m
    • Scoil na Mainistreach · primary · 455 pupils · 432 m
    • Scoil Naomh Brid · primary · 240 pupils · 473 m
    • Primrose Hill Ns · primary · 109 pupils · 816 m
    • Aghards NS · primary · 660 pupils · 968 m
    • North Kildare Educate Together NS · primary · 432 pupils · 991 m

    Stops 26

    • Oldtown Road · L59, X27 · 3/hour at peak · 428 m
    • Oldtown Road · L59, X27 · 2/hour at peak · 434 m
    • Church Road · L59, X27 · 3/hour at peak · 475 m
    • Willowbrook Lawns · L59, X27 · 3/hour at peak · 528 m
    • Willowbrook Lawns · L59, X27 · 2/hour at peak · 542 m
    • English Row · 120, 120A, 120B, L59, X27 · 6/hour at peak · 553 m
    • English Row · 120, 120B, L59, X27 · 4/hour at peak · 566 m
    • Priory Lodge · L59, X27 · 3/hour at peak · 567 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Raphaels Special Sch · 312 m-1% pupils (96)
    • Scoil na Mainistreach · 432 m-1.1% pupils (455)
    • Scoil Naomh Brid · 473 m-7% pupils (240) · an extension 2023, approved with conditions
    • Primrose Hill Ns · 816 m-3.5% pupils (109)
    • Aghards NS · 968 m-0.8% pupils (660)
    • North Kildare Educate Together NS · 991 m-0.7% pupils (432)

    Open consultations

    Public land

    • Kildare County Council · 1.03 ha · 21 m
    • Kildare County Council · 0.11 ha · 102 m
    • Kildare County Council · 0.51 ha · 162 m
    • Kildare County Council · 1.65 ha · 353 m
    • Kildare County Council · 0.1 ha · 380 m
    • Kildare County Council · 2.61 ha · 439 m
    Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 4 Oct 2026, 23:41
    SourceLicenceFetchedLink
    gtfsCC-BY-4.04 Oct 2026, 23:41open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    npadCC-BY-4.010 Oct 2026, 01:42open
    consultpublic10 Oct 2026, 01:23open
    moderngovpublic10 Oct 2026, 01:24open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    2. Flood risk area within 100 m: can you insure it?
      Ask for: A flood-cover quote before sale agreed.
      Insurer
    3. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    4. Decision 147 m away can be appealed until 15 Oct 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    5. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Celbridge
    Electoral division
    Celbridge
    Electoral area
    Celbridge
    Council
    Kildare County Council
    Everything we found, as a list 8 lines
    • Not protected; on the vacant land tax map; flood risk area within 100 m; high radon area.
    • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
    • 37 homes approved nearby, not started; largest 37 at Celbridge Lodge.
    • Oldtown Road (bus L59, X27) 428 m away: 3 an hour at morning peak; 8 from all stops within 500 m.
    • Here (2022 census): 58% owner-occupied (council 71%); 6% of homes empty (council 5%); most built 1946–1960; 48% drive to work (council 61%); population up 3% since 2016.
    • 4 home extensions within 250 m since 2026. Most were rear extensions. On Saint Patrick's Park: 13 in 10 years, 92% approved.
    • Around here the council decides in a median 55 days (about 8 weeks); 40% are asked for more information.
    • Homes started within 1 km: 78 in the last year, 256 three years before.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 34
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.09 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC-BY-NC-ND-4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public10 Oct 2026
    www2.courts.ie—all-rights-reserved10 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC-BY-4.05 Oct 2026
    esbnetworks.ie—all-rights-reserved (esbnetworks.ie di… · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL-1.0 (OSM) + CC-BY-SA-4.0 (NHDS) +…27 Sept 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.04 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public10 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.010 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…10 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.04 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
    water.ie—all-rights-reserved (water.ie terms cl… · flag only—
    water.ie—all-rights-reserved (water.ie terms cl… · flag only—
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.04 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 10 Oct 2026, 06:50 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.