Planning report · Dublin City Council · 500 m around the house · the last 12 months · 31 Oct 2026, 23:31

Exchequer Street

53.34319, -6.26322

Homes here mostly date from before 1919. 2 planning files on this house, the latest from 2022. Most home extensions nearby get approved (88%). 14 homes approved 96 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 7 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 2 planning files on this house, the latest from 2023.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 2 planning files on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Exchequer StreetBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2023: 3578/22 · signage, withdrawn or invalid2022: 3465/22 · signage, withdrawn or invalid2021: 1 file on Exchequer Street2022: 4 files on Exchequer Street2023: 3 files on Exchequer Street2025: 3 files on Exchequer Street2026: 1 file on Exchequer Street12 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    3578/22 · signage · withdrawn
    approved?started?signed off?
  2. 2022
    3465/22 · signage · withdrawn
    approved?started?signed off?
On this site
M2
Zoning · Major town centre
Yes
Protected or listed · a building in the national heritage inventory (50910215)
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z5 - DEV PLAN 2022-2028

ZoningM2 · Major town centre
What it says

Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

The main town centre — retail, offices, civic uses, apartments.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningM2 · Major town centre
What it says

Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

The main town centre — retail, offices, civic uses, apartments.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Protected building71 within 100 m South City Markets building; South City Markets building
Heritage inventoryOn this site shop/retail outlet
Monument zone3 within 100 m Building; Barracks
Radon1 in 20 homes have high radon (EPA)

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Independent Newspapers Ltd. (602 m)

Vacant land taxNo not on the map
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Heritage inventory buildings809Arlington Hotel; Knightsbridge Bar/Arlington Hotel
Radon grid squares3
Monuments232Town defences; Mural tower (Historic Town)
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 3 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, Sites and Monuments Record, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM) · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 84–100% by type. A new house in a garden is harder: 70% approved, and 1 in 3 is asked for more information.

Single-storey rear58 decided · more info asked 12%
97% · council 97%
Two-storey rear37 decided · more info asked 8%
92% · council 96%
Attic or dormer44 decided · more info asked 14%
84% · council 96%
First-floor25 decided · more info asked 24%
96% · council 94%
Porch or front10 decided · more info asked 0%
100% · council 97%
New house in a garden or site43 decided · more info asked 37%
70% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 217 nearby, 5,199 council-wide

Figure 3

Exchequer Street, file by file since 2021

12 planning files on Exchequer Street since 2021, by kind and decision.202120222023202420252026Extensions, atticsPorches, roofs, otherNo. 5 · 2021 · other work · approved · 3250/21No. 20 · 2022 · other work · withdrawn or invalid · 3329/22No. 17 · 2022 · other work · withdrawn or invalid · 3578/22No. 34 · 2022 · other work · approved · 3838/22No. 5 · 2022 · other work · approved · 4763/22No. 20 · 2023 · other work · approved · 3252/23No. 27 · 2023 · other work · refused · 3433/23No. 34 · 2023 · other work · approved · WEB1954/23No. 26 · 2025 · other work · withdrawn or invalid · WEB2628/25No. 26 · 2025 · other work · withdrawn or invalid · WEB2694/25No. 26 · 2025 · other work · approved · WEB2864/25No. 34 · 2026 · other work · approved · WEB1772/26New house in a side garden
ApprovedRefusedWithdrawn or invalid

12 files with "Exchequer Street" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 1 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 1 in the last 12 months

  • WEB5791/25 · work already done · refused 28 Jan 2026 · 85 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 3

How long, and what if someone objects?

Figure 4

A home extension's journey here

A decision takes 55 days. 1 in 5 is asked for more information, which adds about 85 days. Building starts about 6 months after permission.

Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 5): 143 days; Appeal window: 4 weeks; If appealed: +224 days; Building starts: 182 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=246)55 daysIf more info asked (1 in 5)With further information: median 143 days (n=69)143 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 224 days (n=243, all appeals within 1.5 km)+224 daysBuilding startsStart notice: median 182 days after permission (n=108)182 days after permissionSigned off509 days after the start, for the few who file. 26% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated315 decided home extensions, 117 start notices, 243 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 5

What appeals changed

44 of 125 appealed refusals became permissions. 12 of 125 appealed approvals were reversed.

Refusals appealed125 decided
44 became permissions
Approvals appealed125 decided
12 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 9 in the last 12 months

2 of 3 changed the council's decision

  • 501667 Granted with conditions · 9/10 Dawson Street, Dublin 2, D02 YX99 · 380 m
  • 501494 Granted with conditions · A 0.0376 Ha. site at Nos. 24 and 25, Frederick Street South, Dublin 2 · 465 m
  • 324045 Split · 59-61 Dame Street, Dublin 2 · 162 m report
  • 501721 Open · 30-33 College Green (a Protected Structure, RPS Ref. 1995), and… · 186 m
  • 500858 Open · No. 1-3 Ormond Quay Upper and No's. 1-3a Strand Street Little, Dublin… · 461 m
  • 500953 Refused · 3 Eustace Street, Dublin 2 · 177 m report
  • 324086 Refused · 9/10 Dawson St, Dublin 2 · 380 m report
  • 500853 Granted with conditions · 7, D'Olier Street, Dublin 2 · 473 m report
  • 501223 Pending · Stephen's Green Shopping Centre, St. Stephen's Green, Dublin 2,… · 300 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 23:12
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 4

What's changing around you?

Street map around Exchequer Street with 15 numbered planning items
⌖ the houseOpen for commentsWindow closingApproved, not startedDerelict buildingRefusedAppealBuilding started
  1. 1No.7 Westmoreland Street (D02 XF76) and 39 Fleet Street (D02 EK07), Temple Bar WEB3428/26No decision yet · 269 m
  2. 244 Grafton Street, Dublin 2 WEB3420/26No decision yet · 275 m
  3. 328, Bachelors Walk 2867/21/X1No decision yet · 457 m
  4. 43 Olympia Theatre, No. 72 Dame Street WEB2972/26Approved · 153 m
  5. 53 Eustace Street, Dublin 2 WEB3090/26Refused · 225 m
  6. 633 and 34 Dame Street 4467/24Approved, no sign building has started · 96 m
  7. 725 AUNGIER STREET DUBLIN 2 D02X277 DS1311Derelict building · 421 m
  8. 85 Ormond Quay Lower, Dublin 1 DS2178Derelict building · 432 m
  9. 96 COLLEGE STREET DUBLIN 2 D02HX59 DS1850Derelict building · 453 m
  10. 10The Mercantile Hotel and Dame House, 24-28 Dame Street WEB5791/25Refused · 85 m
  11. 1159-61 Dame Street, Dublin 2 324045Appeal: partly approved · 162 m
  12. 123 Eustace Street, Dublin 2 500953Appeal: refused · 177 m
  13. 1330-33 College Green (a Protected Structure, RPS Ref. 1995) 501721Appeal: open · 186 m
  14. 1413 Saint Andrew's Street, Dublin 3010/23Building started · 77 m
  15. 1584-88 South Great George's Street, Dublin 2 WEB2091/26Building started · 98 m
Figure 6

What happens to applications within 500 m

Permission isn't building. Of 298 permissions since 2016, 129 show a start notice and 58 have a completion certificate.

501 applications lodged within 500 m. Council: 299 approved, 84 refused. After appeals: 298 approved. Of those: 58 signed off, 0 built with the owner's opt-out, 71 started, 169 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT299: lodged → approved84: lodged → refused103: lodged → withdrawn or invalid15: lodged → undecided288: approved → approved73: refused → refused103: withdrawn or invalid → withdrawn15: undecided → undecided3 approved by the council, undecided after an appeal2 approved by the council, refused after an appeal6 approved by the council, withdrawn or invalid after an appeal10 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal169: approved → no start notice found71: approved → started, not signed off58: approved → signed off501 lodged501 lodged299 approved299 approved84 refused84 refused103 withdrawn or invalid103 withdrawn or invalid15 undecided15 undecided298 approved298 approved75 refused75 refused110 withdrawn110 withdrawn18 undecided18 undecided169 no start notice found169 no start notice found71 started, not signed off71 started, not signed off58 signed off58 signed off

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured501 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 7

The next 30 days

8 deadlines within 500 m; the first closes 2 Nov 2026.

8 deadlines in the next 30 days: 2026-11-02 2867/21/X1: application received — EXT. OF DURATION: PROTECTED STRUCTURE: PERMISSION & RETENTION: The development will consist of: A) Renovate the entire 4; 2026-11-02 WEB2972/26: GRANT PERMISSION AND RETENTION PERMISSION — PROTECTED STRUCTURE: RETENTION AND PERMISSION: We, Olympia Productions Unlimited Company, intend to apply for retention ; 2026-11-05 WEB3420/26: application received — Percy Nominees Limited intend to apply for planning permission for development at 44 Grafton Street, Dublin 2, D02 CA21.; 2026-11-06 WEB3428/26: application received — PROTECTED STRUCTURE: RETENTION: The development consists of: Retention permission for works carried out; at ground, mezz; 2026-11-10 WEB3090/26: REFUSE PERMISSION — CHANGE OF USE: The development will consist of Change of Use of 5 no. Apartments from Residential to Student Accommodati; 2026-11-18 WEB3143/26: GRANT PERMISSION — We, Sunglass Hut Ireland Limited, intend to apply for planning permission for the replacement of the existing external s; 2026-11-20 ACP 501494: Grant permission with conditions; 2026-11-24 ACP 501667: Grant permission with revised conditionstoday5 Nov10 Nov15 Nov20 Nov25 Nov30 Nov2867/21/X1: application received — EXT. OF DURATION: PROTECTED STRUCTURE: PERMISSION & RETENTION: The development will consist of: A) Renovate the entire 4 · 457 m away · 2026-11-02WEB2972/26: GRANT PERMISSION AND RETENTION PERMISSION — PROTECTED STRUCTURE: RETENTION AND PERMISSION: We, Olympia Productions Unlimited Company, intend to apply for retention · 153 m away · 2026-11-02WEB3420/26: application received — Percy Nominees Limited intend to apply for planning permission for development at 44 Grafton Street, Dublin 2, D02 CA21. · 275 m away · 2026-11-05WEB3428/26: application received — PROTECTED STRUCTURE: RETENTION: The development consists of: Retention permission for works carried out; at ground, mezz · 269 m away · 2026-11-06WEB3090/26: REFUSE PERMISSION — CHANGE OF USE: The development will consist of Change of Use of 5 no. Apartments from Residential to Student Accommodati · 225 m away · 2026-11-10WEB3143/26: GRANT PERMISSION — We, Sunglass Hut Ireland Limited, intend to apply for planning permission for the replacement of the existing external s · 275 m away · 2026-11-18ACP 501494: Grant permission with conditions · 465 m away · 2026-11-20ACP 501667: Grant permission with revised conditions · 380 m away · 2026-11-24
Comments closeTime to appeal endsHigh Court window ends
  • Comments close 2 Nov 20262 days left
    32867/21/X1 · application received — EXT. OF DURATION: PROTECTED STRUCTURE: PERMISSION & RETENTION: The development will consist of:…
    €20 to the council · 457 m away
  • Time to appeal ends 2 Nov 20262 days left
    4WEB2972/26 · GRANT PERMISSION AND RETENTION PERMISSION — PROTECTED STRUCTURE: RETENTION AND PERMISSION: We, Olympia Productions…
    €220 to An Coimisiún Pleanála (€110 observer) · 153 m away
  • Comments close 5 Nov 20265 days left
    2WEB3420/26 · application received — Percy Nominees Limited intend to apply for planning permission for development at 44 Grafton…
    €20 to the council · 275 m away
  • Comments close 6 Nov 20266 days left
    1WEB3428/26 · application received — PROTECTED STRUCTURE: RETENTION: The development consists of: Retention permission for works…
    €20 to the council · 269 m away
  • Time to appeal ends 10 Nov 202610 days left
    5WEB3090/26 · REFUSE PERMISSION — CHANGE OF USE: The development will consist of Change of Use of 5 no. Apartments from Residential…
    €220 to An Coimisiún Pleanála (€110 observer) · 225 m away
  • Time to appeal ends 18 Nov 202618 days left
    WEB3143/26 · GRANT PERMISSION — We, Sunglass Hut Ireland Limited, intend to apply for planning permission for the replacement of the…
    €220 to An Coimisiún Pleanála (€110 observer) · 275 m away
  • Time to ask the High Court for a review ends 20 Nov 202620 days left
    Grant permission with conditions
    465 m away
  • Time to ask the High Court for a review ends 24 Nov 202624 days left
    Grant permission with revised conditions
    380 m away

Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

Figure 8

Approved, stalled or planned, not built yet

14 homes 96 m away were approved Mar 2025 with no start notice yet; the permission runs to Mar 2030.

33 and 34 Dame Street · 14 homes: 14 homes approved Mar 2025, not started2024202520262027202820292030203133 and 34 Dame Street · 14 homes96 m · 4467/2414 homes approved Mar 2025, not started14 homes approved Mar 2025, not startedtoday

Each row is a dated fact from a public register: no score and no forecast.

Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

Sites that could change 6 within 500 m

Derelict building 3

  • 725 AUNGIER STREET DUBLIN 2 D02X277 · derelict since Nov 2023 · 421 m
  • 85 Ormond Quay Lower, Dublin 1 · derelict since Jun 2026 · 432 m
  • 96 COLLEGE STREET DUBLIN 2 D02HX59 · derelict since Sep 2024 · 453 m

Approved, not started 1

Empty land zoned for homes 2

  • 0.3 ha zoned for homes · no homes built on it yet · 438 m
  • 0.2 ha zoned for homes · no homes built on it yet · 487 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
Council meetings (ModernGov)Public31 Oct 2026, 02:21open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Figure 9

Applications within 500 m, by year

Between 82 and 96 a year; busiest 2025. 78% of decisions were approvals.

2021: 58, 2022: 82, 2023: 90, 2024: 93, 2025: 96, 2026: 820204060801002021: 48 approved2021: 7 refused2021: 2 withdrawn or invalid2021: 1 undecided58’21*2022: 60 approved2022: 16 refused2022: 6 withdrawn or invalid82’222023: 66 approved2023: 19 refused2023: 5 withdrawn or invalid90’232024: 61 approved2024: 24 refused2024: 8 withdrawn or invalid93’242025: 42 approved2025: 13 refused2025: 41 withdrawn or invalid96’252026: 22 approved2026: 5 refused2026: 41 withdrawn or invalid2026: 14 undecided82’26*
ApprovedRefusedWithdrawn or invalidUndecided

2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

Measuredcouncil register via NPAD

Open for comments €20 to comment

Every application within 500 m 119 in the last 12 months

See every application on the map

How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Building work nearby 46 in the last 12 months
8 signed off as finished26 not signed off12 no sign-off needed
  • Unit 4, 51 Stephen Street Lower, Dublin City, Dublin 2, D02 N7Y3 · 5 Nov 2026 · 7-day notice not signed off · WEB2538/26 · 225 m
  • 28/29 Grafton Street, Dublin 2, D02 C953 · 27 Oct 2026 · 7-day notice not signed off · WEB2841/26 · 278 m
  • 1413 Saint Andrew's Street, Dublin, Dublin 2, D02 DP48 · 23 Oct 2026 · start notice not signed off · 3010/23 · 77 m
  • 38 Grafton Street, Dublin 2, D02 W862 · 21 Oct 2026 · short notice no sign-off needed · 316 m
  • 3 Palace Street, Dublin, D02 T277 · 15 Sept 2026 · start notice not signed off · 226 m
  • 1584-88 South Great George's Street, Dublin 2, D02 TX84 · 11 Sept 2026 · short notice no sign-off needed · WEB2091/26 · 98 m
  • 11-12 Westmoreland Street, Dublin, Dublin 2, D02 XE29 · 11 Sept 2026 · start notice not signed off · WEB1683/26 · 410 m
  • Temple Bar, Dublin 2 · 9 Sept 2026 · 7-day notice not signed off · WEB1642/26 · 247 m
  • 33 Nassau Street, Dublin 2, D02K330 · 7 Sept 2026 · 7-day notice not signed off · 334 m
  • Saint Stephen's Green, Dublin 2, D02HCB1 · 24 Aug 2026 · 7-day notice not signed off · WEB1202/26 · 444 m
  • 25 Suffolk Street, Dublin, Dublin 2, D02 F656 · 21 Aug 2026 · start notice signed off · WEB5549/25 · 193 m
  • 30/31 Liffey Street Lower, Dublin 1, D01 E7N3 · 6 Aug 2026 · 7-day notice not signed off · WEB1667/25 · 433 m
  • 20/21 William Street South, Dublin, Dublin 2, D02 XE77 · 6 Aug 2026 · 7-day notice not signed off · WEB1515/26 · 139 m
  • 54 Dawson Street, Dublin 2, D02 TV77 · 31 Jul 2026 · short notice no sign-off needed · 357 m
  • 71 Grafton Street, Dublin 2, D02 NR04 · 31 Jul 2026 · short notice no sign-off needed · 5049/26 · 272 m
  • 17 Anglesea Street, Dublin 2, D02 DX09 · 29 Jul 2026 · 7-day notice not signed off · WEB2943/25 · 275 m
  • 37/38 Nassau Street, Dublin 2, D02 E430 · 27 Jul 2026 · 7-day notice signed off · 344 m
  • 5 Frederick Street South, Dublin 2, D02 DF29 · 15 Jul 2026 · short notice no sign-off needed · 443 m
  • 76 Grafton Street, Dublin 2, D02 X092 · 6 Jul 2026 · short notice no sign-off needed · 262 m
  • 75 Aungier Street, Dublin 2, D02 CC83 · 3 Jul 2026 · start notice not signed off · WEB5287/25 · 294 m
  • College Green, Dublin 2, D02 CX56 · 30 Jun 2026 · short notice no sign-off needed · WEB2822/25 · 297 m
  • 61a William Street South, Dublin, Dublin 2, D02 W580 · 15 Jun 2026 · 7-day notice not signed off · WEB1137/26 · 103 m
  • 53 Dawson Street, Dublin 2, D02 HX33 · 8 Jun 2026 · 3 homes · 7-day notice not signed off · 4982/23 · 356 m
  • 72 Dame Street, Dublin, Dublin 2, D02 K135 · 1 Jun 2026 · short notice no sign-off needed · WEB5372/25 · 227 m
  • 75 Aungier Street, Dublin, D02 CC83 · 14 May 2026 · start notice not signed off · WEB5287/25 · 294 m
  • 2 Balfe Street, Dublin, Dublin 2, D02 CH66 · 24 Apr 2026 · 7-day notice not signed off · 3495/25 · 232 m
  • Unit 4, 60 - 63 Dawson Street, Dublin, Dublin 2, D02 E430 · 15 Apr 2026 · 7-day notice signed off · 344 m
  • 48 Fleet Street, Dublin, Dublin 2, D02 T883 · 14 Apr 2026 · 12 homes · 7-day notice not signed off · WEB2081/25 · 322 m
  • 10 Suffolk Street, Dublin, Dublin 2, D02 KX03 · 6 Apr 2026 · short notice no sign-off needed · 209 m
  • 16-18 Parliament Street, Dublin, Dublin 2, D02 VR94 · 2 Apr 2026 · 7-day notice not signed off · 4474/22 · 348 m
  • Junction of Dawson and Nassau Street, Dublin 2, D02 NN53 · 12 Mar 2026 · 7-day notice signed off · 4801/23 · 348 m
  • 5/6 Dame Court, Dublin, Dublin 2, D02 XP58 · 9 Mar 2026 · 7-day notice not signed off · WEB2154/24 · 37 m
  • Joshua Dawon House, Ground Floor Unit Dawson St, Dublin 2, Dublin, D02 NY91 · 6 Mar 2026 · start notice signed off · 475 m
  • 1 Dame Street, Dublin, Dublin 2, D02 A4W7 · 23 Feb 2026 · 7-day notice signed off · 173 m
  • 11 Ormond Quay Lower, Dublin City Centre, Dublin 1, D01 K2X9 · 19 Feb 2026 · 7-day notice not signed off · 2918/21 · 413 m
  • Unit A Central Plaza Dame Street, Dublin 2, D02 K7K5 · 9 Feb 2026 · start notice not signed off · 3636/24 · 173 m
  • 42 Grafton Street, Dublin, Dublin 2, D02 KF76 · 23 Jan 2026 · short notice no sign-off needed · 333 m
  • 7 Grafton Street, Dublin, Dublin 2, D02 Y308 · 19 Jan 2026 · start notice signed off · WEB2459/25 · 263 m
  • Le Pole House, Dublin, Dublin 8, D08 N12C · 8 Jan 2026 · short notice no sign-off needed · 366 m
  • 5 Grafton Street, Dublin, Dublin 2, D02 WN88 · 5 Jan 2026 · 4 homes · start notice not signed off · WEB2153/24 · 262 m
  • 20/21 William Street South, Dublin, Dublin 2, D02 XE77 · 22 Dec 2025 · short notice no sign-off needed · 139 m
  • The Clarence Hotel, 6-8 Wellington Quay, Dublin 2, Dublin, D02 HT44 · 19 Dec 2025 · 7-day notice not signed off · WEB2671/24 · 327 m
  • 35/36 Drury Street, Dublin, Dublin 2, NA · 19 Dec 2025 · 7-day notice not signed off · 44 m
  • 75 Aungier Street, Dublin, Dublin 2, D02 CC83 · 17 Dec 2025 · 7-day notice not signed off · 294 m
  • Bridge House, 24/25 Parliament Street, Dublin 2, D02 X971 · 28 Nov 2025 · 7-day notice not signed off · WEB2768/24 · 369 m
  • Annex Building, Central Plaza, Dame Street,, Dublin 2, D02 A3X7 · 13 Nov 2025 · 7-day notice signed off · 191 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Homes coming 14 not started
How we work this out
Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
Named places nearby: estate, schemes, crèches, schools

Named places estate, developments, inspections

Developments within 1.0 km

SchemeHomesProgressDistance
Glover Court Estate5353 not started (2026-Q2)398 m
Jervis Shopping Centre2424 not started (2026-Q1)528 m
Arnotts Car Park Development155—551 m
Apollo House5858 built (2025-Q2)580 m
DIT / TUD site299299 being built (2026-Q2)672 m
Fegan's, Chancery Street12—702 m
located at Brunswick Villas4949 not started (2026-Q2)721 m
Dublin Central Site 37979 not started (2026-Q2)721 m

Who applies most nearby

  • Learning Group Limited — 4 applications, latest 5 May 2026
  • Heights Hospitality Operations Ltd — 2 applications, latest 2 Oct 2026
  • Mer Blanc Properties ULC — 2 applications, latest 8 Sept 2026
  • Olympia Productions Unlimited Company — 2 applications, latest 11 Aug 2026
  • Wonder Bay Limited — 2 applications, latest 2 Jan 2026
  • Gaiety Productions Unlimited Company — 2 applications, latest 21 Nov 2025

Crèches and schools inspected

NameLatest inspectionDistance
TCD Day Nursery · Crèche30 Jun 2026 · report · Tusla Early Years Inspectorate314 m
Scallywags Creche · Crèche20 Aug 2025 · report · Tusla Early Years Inspectorate397 m
YMCA Childcare · Crèche28 Apr 2026 · report · Tusla Early Years Inspectorate400 m
Whitefriars Childcare Ltd · Crèche16 Jun 2025 · report · Tusla Early Years Inspectorate480 m
Christchurch Creche & Montessori School · Crèche3 Apr 2025 · report · Tusla Early Years Inspectorate563 m
Oakview Oireachtas · Crèche18 Jun 2025 · report · Tusla Early Years Inspectorate593 m
HSE National Drug Treatment Centre Playtherapy Department · Crèche27 Jan 2025 · report · Tusla Early Years Inspectorate713 m
Maple Montessori · Crèche1 Mar 2024 · report · Tusla Early Years Inspectorate761 m
How we work this out
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Applicant organisations (from the CRO)Derived by Planning Register25 Oct 2026, 23:01—
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
Tusla early years registerPublic register28 Oct 2026, 23:19open
How busy is this area Quieter than most of Dublin City Council.
Homes approved
Here740
Council middle63
Homes started
Here60
Council middle139
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 5

What's the area like?

Figure 10

This street block against the council

3% owner-occupied (council 47%).

Homes built before 1971
59% · council 52%
Homes built since 2001
5% · council 19%
Owner-occupied
3% · council 47%
Rented
78% · council 45%
Children under 15
22% · council 15%
Aged 65 and over
4% · council 13%
Households with 2+ cars
0% · council 19%
Work mainly from home
6% · council 12%
This small area (177 people)Dublin

MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268140007

Bus
108 m
College Green · 14, 15, 15A · busiest stop within 500 m: 21 an hour at peak
Radon
1 in 20
homes here likely high (EPA). Test it
Flood
Within 500 m
OPW flood map area, not beside the house
Nearest school
411 m
South City CNS, 148 pupils
Homes sold nearby
88
in 3 years, 1 new (Property Price Register)
Schools, stops and the council

Schools

  • South City CNS · primary · 148 pupils · 411 m
  • Scoil na mBrathar · primary · 155 pupils · 712 m
  • St Patricks · primary · 24 pupils · 728 m
  • St Patricks Cathedral Grammar School · postprimary · 302 pupils · 728 m
  • St Audoens Ns · primary · 171 pupils · 754 m
  • Presentation Primary School · primary · 165 pupils · 806 m
  • Loreto College · postprimary · 588 pupils · 843 m
  • City Quay Ns · primary · 151 pupils · 881 m

Stops 194

  • College Green · 14, 15, 15A, 15B, 15D, 49n · 19/hour at peak · 108 m
  • S Great George's St · 122, 16, 65, 65B, 68, 68A · 21/hour at peak · 115 m
  • S Great George's St · 14, 142, 15, 15A, 15B, 15D · 20/hour at peak · 123 m
  • College Green · 150, 27, 56A, 65, 65B, 68 · 21/hour at peak · 126 m
  • S Great George's St · 122, 16, 16D, 68, 68A, 80 · 16/hour at peak · 127 m
  • College Green · 14, 142, 15, 15A, 15B, 15D · 20/hour at peak · 142 m
  • College Green · 150, 16, 16D, 80 · 14/hour at peak · 156 m
  • College Green · 122, 68, 68A · 5/hour at peak · 173 m

Schools growing or shrinking planning in 3 years · pupils last year

  • South City CNS · 411 m-8.1% pupils (148)
  • Scoil na mBrathar · 712 m-5.5% pupils (155)
  • St Patricks · 728 m+4.3% pupils (24) · 6 classrooms 2023, no decision yet
  • St Patricks Cathedral Grammar School · 728 m0% pupils (302) · 6 classrooms 2023, no decision yet
  • St Audoens Ns · 753 m-5.5% pupils (171)
  • Presentation Primary School · 806 m+8.6% pupils (165) · an extension 2025, approved

Open consultations

Council meetings 30 items

Public land

  • Fáilte Ireland · 0.14 ha · 115 m
  • Fáilte Ireland · 0.11 ha · 133 m
  • Dublin City Council · 0.23 ha · 169 m
  • Trinity College Dublin · 16.45 ha · 271 m
  • The Office of Public Works · 0.13 ha · 365 m
  • Dublin City Council · 1.65 ha · 461 m
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Council consultation portalsPublic31 Oct 2026, 01:06open
Council meetings (ModernGov)Public31 Oct 2026, 02:21open
Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
cso_saps_2022CC BY 4.0—open
National Transport AuthorityCC BY 4.0——
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
EPA strategic noise mapsCC BY 4.0——
Fingal County CouncilCC BY 4.0——
Question 6

What to ask, and who

  1. 14 homes approved 96 m away (33 and 34 Dame Street), not started: what is planned?
    Ask for: The planning file for 4467/24.
    Council
  2. Application 268 m away open for comments until 6 Nov 2026: comment?
    Ask for: The plans on the council's website (€20 to comment).
    Council
  3. Decision 153 m away can be appealed until 2 Nov 2026: appeal?
    Ask for: The decision on the council's website (€220 to appeal).
    Council
  4. Building work started 76 m away: for how long?
    Ask for: The planning conditions for 3010/23.
    Agent · council
  5. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.
    Seller · solicitor
Reference

Where this is, the terms, the sources

Electoral division
Royal Exchange A
Electoral area
South East Inner City
Council
Dublin City Council
Everything we found, as a list 8 lines
  • 2 applications on this site; latest 3578/22, withdrawn.
  • Zoned M2 (major town centre); heritage-listed; no vacant land tax.
  • 6 sites nearby could change: 3 derelict, 1 approved scheme, 2 empty zoned plots.
  • 3 applications open for comments nearby; nearest closes 6 Nov 2026.
  • 1 application refused within 100 m since 2025; latest for work already done (2026).
  • 14 homes approved nearby, not started; largest 14 at 33 and 34 Dame Street.
  • Ormond Quay Upr (bus 23, 24) 475 m away: 41 an hour at morning peak; 858 from all stops within 500 m.
  • Here (2022 census): 78% rent (council 45%); 19% of homes empty (council 8%); most built before 1919; 7% drive to work (council 28%); population up 17% since 2016.
What the terms mean 9 terms
  • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
  • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
  • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
  • Approved (Grant of permission): The council said yes, usually with conditions.
  • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
  • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
  • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
  • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
  • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 33
SourcePublisherLicenceFetched
EPA strategic noise maps—CC BY 4.0—
Fingal County Council—CC BY 4.0—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
National Transport Authority—CC BY 4.0—
services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
www2.courts.ie—© the publisher31 Oct 2026
cso.ie—CC BY 4.0—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
esbnetworks.ie—© the publisher · flag only11 Sept 2026
transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
lda.ieLand Development AgencyCC BY 4.011 Sept 2026
meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register25 Oct 2026
services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
gov.ieDepartment of EducationCC BY 4.027 Oct 2026
gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
Measured
counted from a public register
Calculated
a rate or median we worked out from those counts
Our classification
we sorted it by reading each description
Estimate
inferred from another source (census, map data)
Rule summary
the law, simplified: check before relying on it
How we work this out
Generated 31 Oct 2026, 23:31 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.