PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 13 Oct 2026, 18:43

Colepark Drive

53.34412, -6.35056

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (95%). 24 homes approved 216 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Colepark DriveBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2020: 1 file on Colepark Drive2021: 1 file on Colepark Drive2025: 1 file on Colepark Drive3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

DCC_DP_OWN · — – —

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Henkel Ireland Operations and Research Limited (Ballyfermot) (830 m); licence P1178 (938 m); licence P1223 (938 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Heritage inventory buildings5Canon Troy House; Saint John's College
Radon grid squares3
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: zoning, constraints.epa_licence, constraints.radon, epa_leap, rzlt, constraints, constraints.flood_cfram, constraints.niah · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
constraints.epa_licenceCC-BY-4.027 Sept 2026, 19:36open
constraints.radonCC-BY-4.027 Sept 2026, 19:36open
epa_leapCC-BY-4.012 Oct 2026, 23:31open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.flood_cframCC-BY-NC-ND-4.0 · not redistributable — shown as a flag only11 Sept 2026, 19:11open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 13 Oct 2026, 00:21
SourceLicenceFetchedLink
bcmsCC-BY-4.013 Oct 2026, 00:21open
npadCC-BY-4.013 Oct 2026, 01:45open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 83–98% by type. A new house in a garden is harder: 75% approved, and 1 in 3 is asked for more information.

Single-storey rear37 decided · more info asked 14%
92% · council 97%
Two-storey rear41 decided · more info asked 17%
95% · council 96%
Two-storey side20 decided · more info asked 25%
95% · council 98%
Attic or dormer82 decided · more info asked 10%
98% · council 96%
First-floor12 decided · more info asked 8%
83% · council 93%
New house in a garden or site20 decided · more info asked 30%
75% · council 72%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 212 nearby, 7,242 council-wide

Figure 3

Colepark Drive, file by file since 2020

1 of 1 decided extensions on the road were approved.

3 planning files on Colepark Drive since 2020, by kind and decision.2020202120222023202420252026Extensions, atticsNo. 2 · 2021 · attic conversion / dormer · approved · 3813/21Porches, roofs, otherNo. 77 · 2020 · other work · approved · 2830/20No. 23 · 2025 · other work · approved · WEB2145/25New house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Colepark Drive" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2020–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic10—
Two-storey side10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 13 Oct 2026, 01:45
    SourceLicenceFetchedLink
    npadCC-BY-4.013 Oct 2026, 01:45open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 7 is asked for more information, which adds about 55 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 121 days; Appeal window: 4 weeks; If appealed: +124 days; Building starts: 159 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–55 (n=207)55 daysIf more info asked (1 in 7)With further information: median 121 days (n=19)121 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 124 days (n=33, all appeals within 1.5 km)+124 daysBuilding startsStart notice: median 159 days after permission (n=83)159 days after permissionSigned off58% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated240 decided home extensions, 85 start notices, 33 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    4 of 17 appealed refusals became permissions. 2 of 17 appealed approvals were reversed.

    Refusals appealed17 decided
    4 became permissions
    Approvals appealed17 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months

    None of 1 changed the council's decision

    • 500696 Refused · 304 Ballyfermot Road, Dublin 10 · 229 m report
    Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    courtsall-rights-reserved13 Oct 2026, 01:30open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Question 4

    What's changing around you?

    Street map around Colepark Drive with 9 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedApprovedRefusedNo decision yet
    1. 1149 Cremona Road, Ballyfermot WEB3231/26No decision yet · 229 m
    2. 2Former Faulkners Industries Factory 3617/24Approved, no sign building has started · 216 m
    3. 3274b Ballyfermot Road, Ballyfermot WEB1984/26Approved · 171 m
    4. 4304 Ballyfermot Road, Dublin 10 WEB5611/25Refused · 227 m
    5. 5Pat O'donnell & Co., California Heights WEB3088/26No decision yet · 284 m
    6. 687, Rossmore Road WEB2019/26Approved · 377 m
    7. 7103, Thomond Road WEB5437/25Approved · 381 m
    8. 893 Rossmore Avenue, Ballyfermot WEB1859/26Approved · 418 m
    9. 911, Lough Conn Terrace WEB2648/26No decision yet · 464 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 60 permissions since 2016, 20 show a start notice and 6 have a completion certificate.

    79 applications lodged within 500 m. Council: 61 approved, 7 refused. After appeals: 60 approved. Of those: 6 signed off, 7 built with the owner's opt-out, 7 started, 40 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT61: lodged → approved7: lodged → refused7: lodged → withdrawn or invalid4: lodged → undecided60: approved → approved6: refused → refused7: withdrawn or invalid → withdrawn4: undecided → undecided1 approved by the council, refused after an appeal1 refused by the council, withdrawn or invalid after an appeal40: approved → no start notice found7: approved → built, owner opted out7: approved → started, not signed off6: approved → signed off79 lodged79 lodged61 approved61 approved7 refused7 refused7 withdrawn or invalid7 withdrawn or invalid4 undecided4 undecided60 approved60 approved7 refused7 refused8 withdrawn8 withdrawn4 undecided4 undecided40 no start notice found40 no start notice found7 built, owner opted out7 built, owner opted out7 started, not signed off7 started, not signed off6 signed off6 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured79 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 14 Oct 2026.

    1 deadlines in the next 30 days: 2026-10-14 WEB3231/26: application received — RETENTION planning permission for attic conversion with dormer to rear that exceeds ridge line in part all with associattoday18 Oct23 Oct28 Oct2 Nov7 Nov12 NovWEB3231/26: application received — RETENTION planning permission for attic conversion with dormer to rear that exceeds ridge line in part all with associat · 229 m away · 2026-10-14
    Comments close
    • Comments close 14 Oct 20261 day left
      1WEB3231/26 · application received — RETENTION planning permission for attic conversion with dormer to rear that exceeds ridge line…
      €20 to the council · 229 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    24 homes 216 m away were approved Aug 2024 with no start notice yet; the permission runs to Aug 2029. DART+ South West is planned 799 m away.

    Former Faulkners… · 24 homes: 24 homes approved Aug 2024, not started; DART+ South West, DART+ South…: railway order granted (13 November 2024)2024202520262027202820292030Former Faulkners… · 24 homes216 m · 3617/2424 homes approved Aug 2024, not started24 homes approved Aug 2024, not startedDART+ South West, DART+ South…799 m · plannedrailway order granted (13 November 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 1 within 500 m

    Approved, not started 1

    Sources: acp, bcms, derelict, moderngov, npad, rzlt · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    derelictCC-BY-4.012 Oct 2026, 23:08open
    moderngovpublic13 Oct 2026, 01:29open
    npadCC-BY-4.013 Oct 2026, 01:45open
    rzltCC-BY-4.012 Oct 2026, 00:14open
    Figure 9

    Applications within 500 m, by year

    Between 6 and 15 a year; busiest 2020. 90% of decisions were approvals.

    2019: 6, 2020: 15, 2021: 10, 2022: 10, 2023: 9, 2024: 6, 2025: 12, 2026: 11051015202019: 6 approved6’19*2020: 13 approved2020: 2 refused15’202021: 9 approved2021: 1 refused10’212022: 10 approved10’222023: 7 approved2023: 2 refused9’232024: 6 approved6’242025: 7 approved2025: 2 refused2025: 3 withdrawn or invalid12’252026: 3 approved2026: 4 withdrawn or invalid2026: 4 undecided11’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2019 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 1149 Cremona Road, Ballyfermot, Dublin 10 comments close 14 Oct 2026
      RETENTION planning permission for attic conversion with dormer to rear that exceeds ridge line in part all…
      WEB3231/269 Sept 2026229 m
    Every application within 500 m 14 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 13 Oct 2026, 01:45
    SourceLicenceFetchedLink
    npadCC-BY-4.013 Oct 2026, 01:45open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    Building work nearby 4 in the last 12 months
    2 not signed off2 no sign-off needed
    • 87 Rossmore Road, Dublin 10, D10 V562 · 23 Sept 2026 · start notice, opted out no sign-off needed · WEB2019/26 · 387 m
    • Ballyfermot Road, Dublin · 8 Jul 2026 · 7-day notice not signed off · WEBLRD6088/25-S3A · 477 m
    • Block A, Tristan Square, Chapelizod Hill Rd, Chapelizod, Dublin 20, Chapelizod, Dublin 20 · 9 Jun 2026 · 7-day notice not signed off · WEB1736/25 · 205 m
    • 103 Thomond Road, Ballyfermot, Dublin 10, D10 AD83 · 27 Apr 2026 · start notice, opted out no sign-off needed · 394 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 13 Oct 2026, 00:21
    SourceLicenceFetchedLink
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    Homes coming 24 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    npadCC-BY-4.013 Oct 2026, 01:45open
    social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Cornamona Court · 2 applications in 10 years

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Former Faulkners Industries Factory2424 not started (2026-Q2)144 m
    Former De La Salle National School897531 built · 139 being built · 227 not started (2026-Q2)374 m
    Ballyfermot United Sports and Social Club2222 not started (2026-Q2)496 m
    Quadrant House106106 not started (2026-Q2)728 m
    Leitrim Lodge2424 not started (2026-Q2)748 m
    Ballyfermot Road Apartments2727 built (2025-Q4)790 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Teanga Beo Baile Formaid Cuideachta Faoi Theorainn Ráthaíochta · Crèche30 Sept 2025 · report · Tusla Early Years Inspectorate153 m
    St. Raphael's Preschool & Afterschool Project · Crèche10 Feb 2025 · report · Tusla Early Years Inspectorate216 m
    St. Michael's Preschool & Afterschool Service · Crèche19 Mar 2026 · report · Tusla Early Years Inspectorate246 m
    Woodlands Creche · Crèche9 Dec 2024 · report · Tusla Early Years Inspectorate323 m
    Chestnut Daycare Ltd · Crèche23 Apr 2025 · report · Tusla Early Years Inspectorate390 m
    Treasure Tots Nursery · Crèche23 Feb 2026 · report · Tusla Early Years Inspectorate508 m
    Littlebells Playschool · Crèche24 Oct 2025 · report · Tusla Early Years Inspectorate836 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: dublin_pipeline, estates, npad, schools, tusla_ey · fetched 12 Oct 2026, 23:02
    SourceLicenceFetchedLink
    dublin_pipelineCC-BY-4.012 Oct 2026, 23:02open
    estatesODbL-1.0 (OSM) + CC-BY-SA-4.0 (NHDS) + CC-BY-4.0 (Kildare)27 Sept 2026, 20:18open
    npadCC-BY-4.013 Oct 2026, 01:45open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here74
    Council middle52
    Homes started
    Here874
    Council middle116
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.013 Oct 2026, 00:21open
    npadCC-BY-4.013 Oct 2026, 01:45open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    39% owner-occupied (council 47%).

    Homes built before 1971
    55% · council 52%
    Homes built since 2001
    35% · council 19%
    Owner-occupied
    39% · council 47%
    Rented
    55% · council 45%
    Children under 15
    14% · council 15%
    Aged 65 and over
    41% · council 13%
    Households with 2+ cars
    7% · council 19%
    Work mainly from home
    14% · council 12%
    This small area (126 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268061013

    Road noise
    60–64 dB
    day–night average (EPA 2022)
    Bus
    44 m
    Convent Lawns · 60, L55 · busiest stop within 500 m: 17 an hour at peak
    Planned
    799 m
    DART+ South West, DART+ South West: Hazelhatch and Celbridge - Dublin Heuston
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    134 m
    Kylemore College, 479 pupils
    Homes sold nearby
    263
    in 3 years, 3 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Kylemore College · postprimary · 479 pupils · 134 m
    • St Michaels Ns · primary · 314 pupils · 186 m
    • St Raphaels Ns · primary · 380 pupils · 216 m
    • St Gabriels Ns · primary · 211 pupils · 251 m
    • St. Seton's Secondary School · postprimary · 741 pupils · 286 m
    • St Patricks Ns · primary · 203 pupils · 689 m
    • St Louise de Marillac Primary School · primary · 256 pupils · 751 m
    • Bainrion na nAingal 2 · primary · 133 pupils · 751 m

    Stops 49

    • Convent Lawns · 60, L55 · 2/hour at peak · 44 m
    • Convent Lawns · 60, L55 · 2/hour at peak · 60 m
    • Kylemore College · 60 · 1/hour at peak · 188 m
    • Kylemore College · 60 · 1/hour at peak · 197 m
    • Le Fanu Road · L55 · 1/hour at peak · 244 m
    • Le Fanu Road · L55 · 1/hour at peak · 250 m
    • Ballyfermot Parade · G1, G2, L55, S4 · 16/hour at peak · 268 m
    • Ballyfermot Parade · G1, G2, L55, S4 · 17/hour at peak · 269 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Kylemore College · 133 m+2.8% pupils (479)
    • St Michaels Ns · 186 m-5.1% pupils (314)
    • St Raphaels Ns · 216 m+0.8% pupils (380)
    • St Gabriels Ns · 251 m-9.8% pupils (211)
    • St. Seton's Secondary School · 286 m-4.8% pupils (741)
    • St Patricks Ns · 689 m+0.5% pupils (203)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.17 ha · 59 m
    • Dublin City Council · 0.25 ha · 66 m
    • Dublin City Council · 0.11 ha · 125 m
    • Dublin City Council · 1.16 ha · 191 m
    • Dublin City Council · 4.82 ha · 193 m
    • Dublin City Council · 0.6 ha · 288 m
    Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
    SourceLicenceFetchedLink
    gtfsCC-BY-4.011 Oct 2026, 23:43open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    npadCC-BY-4.013 Oct 2026, 01:45open
    consultpublic13 Oct 2026, 01:29open
    moderngovpublic13 Oct 2026, 01:29open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. 24 homes approved 216 m away (Former Faulkners Industries…), not started: what is planned?
      Ask for: The planning file for 3617/24.
      Council
    2. Application 229 m away open for comments until 14 Oct 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Drumfinn
    Electoral area
    Ballyfermot-Drimnagh
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 1 site nearby could change: 1 approved scheme.
    • 1 application open for comments nearby; nearest closes 14 Oct 2026.
    • 24 homes approved nearby, not started; largest 24 at Former Faulkners Industries Factory.
    • Ballyfermot Parade (bus G1, G2) 269 m away: 17 an hour at morning peak; 95 from all stops within 500 m. Planned: DART+ South West 799 m away, railway order granted (13 November 2024).
    • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 55% rent (council 45%); 9% of homes empty (council 8%); most built 1946–1960; 28% drive to work (council 28%); population up 1% since 2016.
    • 2 home extensions within 250 m since 2026.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 32
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.012 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC-BY-NC-ND-4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public13 Oct 2026
    www2.courts.ie—all-rights-reserved13 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.012 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC-BY-4.012 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC-BY-4.012 Oct 2026
    esbnetworks.ie—all-rights-reserved (esbnetworks.ie di… · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL-1.0 (OSM) + CC-BY-SA-4.0 (NHDS) +…27 Sept 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public13 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.013 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…13 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 13 Oct 2026, 18:43 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.