PlanningRegister.ie
Planning report · South Dublin County Council · 2000 m around the house · the last 12 months · 5 Nov 2026, 09:12

Shackleton Street

53.34511, -6.47415

Homes here mostly date from after 2016. Home extensions nearby almost always get approved (98%). 453 homes approved 169 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 3 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built after 2016, with building records online.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2016–2021.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2016–2021 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R3
Zoning · Rural cluster
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR3 · Rural cluster
What it says

SDZ: To provide for strategic development in accordance with approved planning schemes

A small rural settlement where only modest infill serving local need is envisaged.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 2.0 kmCountFor example
Licensed industrial sites1P1204
Natural heritage areas2Liffey Valley; Grand Canal
Heritage inventory buildings68milestone/milepost; demesne walls/gates/railings
Radon grid squares22
Protected buildings1Weir and sluice system, River Liffey
Monuments70Weir - fish; Enclosure
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1900 on the draft 2027 map; 1891 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), EPA licensed sites, OPW flood maps (CFRAM), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Records of Protected Structures, Sites and Monuments Record · fetched 1 Nov 2026, 23:58
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 97–100% by type. A new house in a garden is harder: 58% approved, and 1 in 2 is asked for more information.

Single-storey rear52 decided · more info asked 29%
100% · council 96%
Attic or dormer61 decided · more info asked 13%
97% · council 98%
New house in a garden or site12 decided · more info asked 42%
58% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 125 nearby, 2,201 council-wide

Extensions and refusals right beside you 6 within 250 m · 0 refused within 100 m

Extensions and refusals near you 6 extensions within 250 m · the last 12 months

3 approved3 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic63—

On Shackleton Park: 69 extensions in 10 years, 90% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 5 is asked for more information, which adds about 65 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 5): 119 days; Appeal window: 4 weeks; If appealed: +100 days; Building starts: 102 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 50–56 (n=124)55 daysIf more info asked (1 in 5)With further information: median 119 days (n=33)119 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 100 days (n=9, all appeals within 1.5 km)+100 daysBuilding startsStart notice: median 102 days after permission (n=78)102 days after permissionSigned off31% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated158 decided home extensions, 81 start notices, 9 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    0 of 4 appealed refusals became permissions. 1 of 5 appealed approvals were reversed.

    Refusals appealed4 decided
    0 became permissions
    Approvals appealed5 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 7 in the last 12 months

    1 of 4 changed the council's decision

    • 500417 Granted · Cooldrinagh Lane, Leixlip, Co.Dublin · 1.3 km
    • 501385 Granted with conditions · 18, Rockwood Finnstown Abbey, Lucan, Dublin, K78K209 · 1.6 km
    • 502014 Invalid · 6, Castlegate Court, Lucan, Co Dublin, K78 VV87 · 1.4 km
    • 501183 Refused · 41A, Dodsborough Cottages, Shackleton Way, Lucan, Co. Dublin, K78C6W0 · 405 m report
    • 500528 Refused · 2.17 ha site to the north of the N4 Lucan by-pass and to, the east of… · 1.6 km report
    • 500999 Open · Lands located at Ounavarra, Clonee Road, Lucan, Co. Dublin, K78 HP90 · 1.9 km
    • 324078 Pending · Lands located at Ounavarra, Clonee Road, Lucan, Co. Dublin K78 HP90 · 1.8 km
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher4 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 4

    What's changing around you?

    Street map around Shackleton Street with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedBuilding site that stoppedEmpty land zoned for homes
    1. 120B Airlie Heights, Lucan SD26B/0453WNo decision yet · 631 m
    2. 251, Dodsborough Cottages SD26A/0052WApproved · 515 m
    3. 331, St. Helen's Drive SDZ26B/0008WApproved · 651 m
    4. 4Scoil Mhuire, Airlie Heights SD26A/0207WApproved · 752 m
    5. 564A, Cooldrinagh Lane SD26B/0384No decision yet · 1.3 km
    6. 618, Berryfield SD26B/0377WApproved · 1.7 km
    7. 7Tubber Lane Residential Development SDZ26A/0008WApproved, no sign building has started · 169 m
    8. 8Hallwell Square, Lucan SDZ23A/0015Building site that stopped · 207 m
    9. 9Aderrig Phase 4 SDZ24A/0011Approved, no sign building has started · 525 m
    10. 10Tubber Lane Road, Lucan SDZ19A/0008 SDZ20A/0014Building site that stopped · 585 m
    11. 11A site of approximately 5.12 Ha, in the townlands of Gollierstown and Finnstown SDZ26A/0009WApproved, no sign building has started · 802 m
    12. 12Tandy's Lane Village Phase 3 SDZ26A/0004WApproved, no sign building has started · 811 m
    13. 13The Crossings Phase 3 SDZ25A/0050WApproved, no sign building has started · 954 m
    14. 14C. 09 ha landholding SDZ26A/0013WApproved, no sign building has started · 1.1 km
    15. 150.1 ha zoned for homesEmpty land zoned for homes · 42 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 78 permissions since 2016, 37 show a start notice and 8 have a completion certificate.

    105 applications lodged within 500 m. Council: 79 approved, 2 refused. After appeals: 78 approved. Of those: 8 signed off, 9 built with the owner's opt-out, 20 started, 41 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT79: lodged → approved2: lodged → refused22: lodged → withdrawn or invalid2: lodged → undecided78: approved → approved2: refused → refused22: withdrawn or invalid → withdrawn2: undecided → undecided1 approved by the council, withdrawn or invalid after an appeal41: approved → no start notice found9: approved → built, owner opted out20: approved → started, not signed off8: approved → signed off105 lodged105 lodged79 approved79 approved2 refused2 refused22 withdrawn or invalid22 withdrawn or invalid2 undecided2 undecided78 approved78 approved2 refused2 refused23 withdrawn23 withdrawn2 undecided2 undecided41 no start notice found41 no start notice found9 built, owner opted out9 built, owner opted out20 started, not signed off20 started, not signed off8 signed off8 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured105 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    8 deadlines within 2.0 km; the first closes 10 Nov 2026.

    8 deadlines in the next 30 days: 2026-11-10 SD26B/0377W: Grant Permission — Replacement of the existing hipped roof with a gable roof, with solar panels to the rear and removal of the existing chi; 2026-11-12 SD26B/0453W: application received — The development consists of the retention of 2 no. windows at ground floor level to the (east) side elevation of the exi; 2026-11-16 SDZ26B/0008W: Grant Permission — Conversion of roof space to accommodate a bedroom and ensuite shower room, 3 no. Rooflights to front roof slope and 4 no; 2026-11-16 SD26A/0052W: Grant Permission — The development will consist / consists of the demolition of an existing shed to the rear, the subdivision of the site a; 2026-11-16 ACP 501385: Grant permission with conditions; 2026-11-17 SD26A/0207W: Grant Permission — The erection of perimeter fencing, to a maximum height of 2.4 metres, including associated access gates, around an all-w; 2026-11-17 SD26B/0384: Request Additional Information — Planning permission for the conversion of the existing attic space to a bedroom with dormer windows to the front and a d; 2026-11-24 ACP 500417: Grant permissiontoday10 Nov15 Nov20 Nov25 Nov30 Nov5 DecSD26B/0377W: Grant Permission — Replacement of the existing hipped roof with a gable roof, with solar panels to the rear and removal of the existing chi · 1.7 km away · 2026-11-10SD26B/0453W: application received — The development consists of the retention of 2 no. windows at ground floor level to the (east) side elevation of the exi · 631 m away · 2026-11-12SDZ26B/0008W: Grant Permission — Conversion of roof space to accommodate a bedroom and ensuite shower room, 3 no. Rooflights to front roof slope and 4 no · 651 m away · 2026-11-16SD26A/0052W: Grant Permission — The development will consist / consists of the demolition of an existing shed to the rear, the subdivision of the site a · 515 m away · 2026-11-16ACP 501385: Grant permission with conditions · 1.6 km away · 2026-11-16SD26A/0207W: Grant Permission — The erection of perimeter fencing, to a maximum height of 2.4 metres, including associated access gates, around an all-w · 752 m away · 2026-11-17SD26B/0384: Request Additional Information — Planning permission for the conversion of the existing attic space to a bedroom with dormer windows to the front and a d · 1.3 km away · 2026-11-17ACP 500417: Grant permission · 1.3 km away · 2026-11-24
    Comments closeTime to appeal endsHigh Court window ends
    • Time to appeal ends 10 Nov 20265 days left
      6SD26B/0377W · Grant Permission — Replacement of the existing hipped roof with a gable roof, with solar panels to the rear and removal…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.7 km away
    • Comments close 12 Nov 20267 days left
      1SD26B/0453W · application received — The development consists of the retention of 2 no. windows at ground floor level to the (east)…
      €20 to the council · 631 m away
    • Time to appeal ends 16 Nov 202611 days left
      3SDZ26B/0008W · Grant Permission — Conversion of roof space to accommodate a bedroom and ensuite shower room, 3 no. Rooflights to front…
      €220 to An Coimisiún Pleanála (€110 observer) · 651 m away
    • Time to appeal ends 16 Nov 202611 days left
      2SD26A/0052W · Grant Permission — The development will consist / consists of the demolition of an existing shed to the rear, the…
      €220 to An Coimisiún Pleanála (€110 observer) · 515 m away
    • Time to ask the High Court for a review ends 16 Nov 202611 days left
      Grant permission with conditions
      1.6 km away
    • Time to appeal ends 17 Nov 202612 days left
      4SD26A/0207W · Grant Permission — The erection of perimeter fencing, to a maximum height of 2.4 metres, including associated access…
      €220 to An Coimisiún Pleanála (€110 observer) · 752 m away
    • Time to appeal ends 17 Nov 202612 days left
      5SD26B/0384 · Request Additional Information — Planning permission for the conversion of the existing attic space to a bedroom with…
      €220 to An Coimisiún Pleanála (€110 observer) · 1.3 km away
    • Time to ask the High Court for a review ends 24 Nov 202619 days left
      Grant permission
      1.3 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    453 homes 169 m away were approved May 2026 with no start notice yet; the permission runs to May 2031. 2 building sites nearby stopped before sign-off. DART+ South West is planned 975 m away.

    Tubber Lane Residential… · 453 homes: 453 homes approved May 2026, not started; Aderrig Phase 4 · 355 homes: 355 homes approved Jun 2024, not started; The Crossings Phase 3 · 214 homes: 214 homes approved Jun 2026, not started; Hallwell Square, Lucan · 172 homes: 172 homes, started Sep 2023, never signed off; DART+ South West, DART+ South…: railway order granted (13 November 2024)2023202420252026202720282029203020312032Tubber Lane Residential… · 453 homes169 m · SDZ26A/0008W453 homes approved May 2026, not started453 homes approved May 2026, not startedAderrig Phase 4 · 355 homes525 m · SDZ24A/0011355 homes approved Jun 2024, not started355 homes approved Jun 2024, not startedThe Crossings Phase 3 · 214 homes954 m · SDZ25A/0050W214 homes approved Jun 2026, not started214 homes approved Jun 2026, not startedHallwell Square, Lucan · 172 homes207 m · SDZ23A/0015172 homes, started Sep 2023, never signed off172 homes, started Sep 2023, never signed offDART+ South West, DART+ South…975 m · plannedrailway order granted (13 November 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 12 within 2.0 km

    Building site that stopped 2

    • 8Hallwell Square, Lucan · 172 homes, started Sep 2023, never signed off · 207 m
    • 10Tubber Lane Road, Lucan · 12 homes, started Aug 2022, never signed off · 585 m

    Approved, not started 6

    Empty land zoned for homes 4

    • 150.1 ha zoned for homes · no homes built on it yet · 42 m
    • 0.3 ha zoned for homes · no homes built on it yet · 67 m
    • 6.8 ha zoned for homes · no homes built on it yet · 108 m
    • 1.7 ha zoned for homes · no homes built on it yet · 0 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
    Council meetings (ModernGov)Public5 Nov 2026, 02:33open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
    Figure 8

    Applications within 500 m, by year

    Between 5 and 27 a year; busiest 2025. 98% of decisions were approvals.

    2021: 12, 2022: 5, 2023: 23, 2024: 16, 2025: 27, 2026: 2201020302021: 8 approved2021: 1 refused2021: 3 withdrawn or invalid12’21*2022: 5 approved5’222023: 18 approved2023: 5 withdrawn or invalid23’232024: 12 approved2024: 4 withdrawn or invalid16’242025: 20 approved2025: 1 refused2025: 6 withdrawn or invalid27’252026: 16 approved2026: 4 withdrawn or invalid2026: 2 undecided22’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 98 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Building work nearby 64 in the last 12 months
    1 signed off as finished38 not signed off25 no sign-off needed
    • lands adjacent the New Cellbridge Link Road and Shackleton Drive, Lucan, Dublin · 11 Nov 2026 · 454 homes · start notice not signed off · SDZ21A/0023/EP · 182 m
    • 4 Saint Helen's Chase, Lucan, Dublin, K78 P5V0 · 11 Nov 2026 · short notice no sign-off needed · SDZ26B/0009W · 724 m
    • 66a Tandy's Lane, Lucan, Dublin · 10 Nov 2026 · 1 homes · start notice, opted out no sign-off needed · SD26A/0122W · 674 m
    • 13 Canonbrook Park, Lucan, Dublin · 5 Nov 2026 · 1 homes · start notice not signed off · 1.9 km
    • 13 Shackleton Square, Lucan, Dublin, K78 X8N7 · 2 Nov 2026 · short notice no sign-off needed · SDZ25A/0045W · 369 m
    • Station Road, Lucan, Dublin · 28 Oct 2026 · start notice not signed off · SD26A/0132W · 1.9 km
    • Adamstown, Lucan, Dublin · 27 Oct 2026 · 50 homes · start notice not signed off · SDZ24A/0018W · 1.8 km
    • lands adjacent the New Cellbridge Link Road and Shackleton Drive, Lucan, Dublin · 26 Oct 2026 · 454 homes · start notice not signed off · SDZ21A/0023 · 219 m
    • 22 Gandon Avenue, Lucan, Dublin · 14 Oct 2026 · start notice not signed off · SDZ26B/0002W · 909 m
    • 19 Ardeevin Drive, Lucan, Dublin, K78 X2V0 · 6 Oct 2026 · start notice, opted out no sign-off needed · SD26B/0290W · 1.7 km
    • 20 Silverberry, Lucan, Dublin, K78 Y751 · 5 Oct 2026 · short notice no sign-off needed · SD26B/0061W · 1.8 km
    • 11 Finnsvale, Lucan, Dublin, K78 NY13 · 29 Sept 2026 · short notice no sign-off needed · SD25B/0715W · 1.7 km
    • 10 Shackleton Wood, Lucan, Dublin, K78 Y2R6 · 24 Sept 2026 · short notice no sign-off needed · SDZ26A/0024W · 425 m
    • Newcastle Road, Lucan, Dublin, K78 W9H9 · 11 Sept 2026 · 7-day notice not signed off · 1.1 km
    • 8 St Helen's, Dublin, K78 H9T4 · 9 Sept 2026 · start notice, opted out no sign-off needed · SDZ24A/0016 · 555 m
    • 6 Castlegate Lawn, Lucan, Dublin, K78 PN30 · 28 Aug 2026 · short notice no sign-off needed · SDZ25A/0046W · 1.5 km
    • Townland of Doddsborough, Adamstown, Lucan, Dublin · 10 Aug 2026 · 39 homes · start notice not signed off · SDZ25A/0037W · 1.1 km
    • Newcastle Road, Lucan, Dublin · 7 Aug 2026 · 64 homes · start notice not signed off · SDZ24A/0018W · 1.9 km
    • 2 Canonbrook Park, Lucan, Dublin, K78 KP29 · 30 Jul 2026 · short notice no sign-off needed · SD22B/0052 · 1.8 km
    • 5 Johnsbridge Green, Lucan, Dublin, K78 TK49 · 20 Jul 2026 · start notice, opted out no sign-off needed · SD26B/0119W · 1.9 km
    • 20B Airlie Heights, Lucan, Dublin, K78 YP08 · 17 Jul 2026 · start notice not signed off · SD25B/0408W · 647 m
    • Tandy's Lane, Lucan, Dublin · 8 Jul 2026 · 111 homes · start notice not signed off · SDZ20A/0020 · 884 m
    • 2 Canonbrook Avenue, Lucan, Dublin, K78 HN76 · 22 Jun 2026 · start notice not signed off · SD24B/0293W · 1.8 km
    • 23 Canonbrook Park, Lucan, Dublin, K78 C1X3 · 15 Jun 2026 · short notice no sign-off needed · SD25B/0716W · 2.0 km
    • 12th Lock, Newcastle Road, Lucan, Dublin, K78 V180 · 15 Jun 2026 · start notice not signed off · SD248/0001 · 2.0 km
    • 17 Rockwood, Lucan, Dublin, K78 VK70 · 4 Jun 2026 · short notice no sign-off needed · SD25B/0493W · 1.6 km
    • lands adjacent the New Cellbridge Link Road and Shackleton Drive, Lucan, South Dublin · 27 May 2026 · 454 homes · start notice not signed off · SDZ21A/0023 · 183 m
    • Hallwell Road, Lucan, South Dublin, K78 K6N2 · 26 May 2026 · 24 homes · 7-day notice not signed off · SDZ25A/0051W · 187 m
    • lands adjacent the New Cellbridge Link Road and Shackleton Drive, Lucan, South Dublin · 20 May 2026 · 454 homes · start notice not signed off · SDZ21A/0023 · 111 m
    • Tandy's Lane, Lucan, South Dublin · 18 May 2026 · 111 homes · start notice not signed off · SDZ20A/0020 · 876 m
    • Tandy's Lane Adamstown, Lucan, Co. Dublin, Lucan, South Dublin · 15 May 2026 · 30 homes · start notice not signed off · SDZ25A/0030W · 729 m
    • 2A Ardeevin Court, Lucan, South Dublin · 15 May 2026 · 1 homes · start notice, opted out no sign-off needed · SD25A/0015 · 1.5 km
    • 10 Somerton Lawns, Lucan, South Dublin, K78 X8V0 · 6 May 2026 · short notice no sign-off needed · SDZ26A/0007 · 1.3 km
    • 62 Dodsborough Cottages, Lucan, South Dublin, K78 RD42 · 2 May 2026 · start notice, opted out no sign-off needed · SD26B/0054W · 652 m
    • Esker Drive, Lucan, South Dublin · 30 Apr 2026 · 7-day notice not signed off · 1.6 km
    • 10 Shackleton Wood, Lucan, South Dublin, K78 Y2R6 · 30 Apr 2026 · short notice no sign-off needed · SDZ25A/0048W · 425 m
    • 21 Somerton Grove, Lucan, South Dublin, K78 Y867 · 14 Apr 2026 · start notice, opted out no sign-off needed · SD25B/0421W · 1.3 km
    • 4 Esker Drive, Lucan, South Dublin, K78 R274 · 6 Apr 2026 · short notice no sign-off needed · SD25B/0059W · 1.8 km
    • 35 Hillcrest Way, Lucan, South Dublin, K78 V4X5 · 6 Apr 2026 · short notice no sign-off needed · SD25B/0390W · 1.3 km
    • 2 Ardeevin Drive, Lucan, South Dublin, K78 N2V3 · 30 Mar 2026 · 7-day notice not signed off · 1.6 km
    • Tandy's Lane, Lucan, South Dublin · 27 Mar 2026 · 111 homes · start notice not signed off · SDZ20A/0020 · 869 m
    • 85 Narrowgauge Row, Lucan, Dublin, K78 W5P0 · 26 Mar 2026 · start notice not signed off · SDZ20A/0008 · 850 m
    • Tandy's Lane, Lucan, South Dublin · 27 Feb 2026 · 3 homes · start notice not signed off · SDZ20A/0020 · 904 m
    • Esker Drive, Lucan, South Dublin, K78 TF67 · 25 Feb 2026 · start notice signed off · 1.6 km
    • Esker Drive, Lucan, South Dublin · 28 Jan 2026 · 7-day notice not signed off · 1.6 km
    • Weston Airport, at Celbridge Road, Backweston, Lucan,, South Dublin · 25 Jan 2026 · 7-day notice not signed off · SD23A/0324 · 1.6 km
    • 12 Shackleton Rise, Dublin, South Dublin, K78 W2C6 · 6 Jan 2026 · short notice no sign-off needed · SD25B/0556W · 464 m
    • St Helen's Wood, Adamstown Way, Lucan, South Dublin · 2 Jan 2026 · 7-day notice not signed off · SDZ23A/0012 · 972 m
    • 79 The Old Forge, Lucan, South Dublin, K78 CX86 · 16 Dec 2025 · start notice, opted out no sign-off needed · SD25B/0396W · 1.9 km
    • Adamstown, Lucan, Co. Dublin, South Dublin · 28 Nov 2025 · 355 homes · start notice not signed off · SDZ23A/0026 · 407 m
    • Adamstown, Lucan, Co. Dublin, Lucan, South Dublin · 28 Nov 2025 · 355 homes · start notice not signed off · SDZ23A/0026 · 407 m
    • Adamstown, Lucan, Co. Dublin, South Dublin · 28 Nov 2025 · 355 homes · start notice not signed off · SDZ23A/0026 · 407 m
    • Adamstown, Lucan, Co. Dublin, Lucan, South Dublin · 28 Nov 2025 · 355 homes · start notice not signed off · SDZ23A/0026 · 407 m
    • Adamstown, Lucan, Co. Dublin, South Dublin · 28 Nov 2025 · 355 homes · start notice not signed off · SDZ23A/0026 · 407 m
    • Adamstown, Lucan, Co. Dublin, South Dublin · 28 Nov 2025 · start notice not signed off · SDZ23A/0026 · 407 m
    • St Helen's Terrace, Adamstown, South Dublin · 26 Nov 2025 · 7-day notice not signed off · SDZ23A/0012 · 892 m
    • Adamstown Way, Adamstown, South Dublin · 26 Nov 2025 · 7-day notice not signed off · SDZ23A/0012 · 1.1 km
    • St Helen's Terrace, Adamstown, South Dublin · 26 Nov 2025 · 7-day notice not signed off · SDZ23A/0012 · 827 m
    • Stratton Row, Adamstown, South Dublin · 26 Nov 2025 · 7-day notice not signed off · SDZ23A/0012 · 926 m
    • Tandy's Lane, Lucan, South Dublin · 21 Nov 2025 · 69 homes · start notice not signed off · SDZ20A/0020 · 897 m
    • 6 Shackleton Links, Lucan, Dublin, K78 K2D0 · 19 Nov 2025 · short notice no sign-off needed · SDZ25A/0029W · 469 m
    • 4 Shackleton Grange, Lucan, Dublin, K78 T2F9 · 19 Nov 2025 · short notice no sign-off needed · SDZ25A/0015W · 544 m
    • Unit 2, The Junction, the Crossings, Adamstown, Lucan, South Dublin, K78 Y9W2 · 19 Nov 2025 · 7-day notice not signed off · SDZ22A/0019 · 939 m
    • 5 Shackleton Links, Lucan, South Dublin, K78 C9D0 · 8 Nov 2025 · short notice no sign-off needed · SDZ25A/0035W · 466 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Homes coming 1,239 not started
    • Aderrig, Adamstown, Co. Dublin (Phase 1)* · On site · 141 homes · 371 m
    • Aderrig (Part V), Adamstown, Lucan, Co. Dublin (Phase 1)* · Completed · 2 homes · 951 m
    • Aderrig (Part V), Adamstown, Lucan, Co. Dublin (Phase 2)* · Completed · 3 homes · 951 m
    • Aderrig (Part V), Adamstown, Lucan, Co. Dublin (Phase 3)* · Completed · 18 homes · 951 m
    • Aderrig Square, Adamstown, Lucan, Co Dublin (Phase 1)* · Completed · 38 homes · 951 m
    • Block 2, Somerton Gate, Adamstown, Lucan, Co. Dublin (Phase 1) · On site · 68 homes · 951 m
    • The Irons, Adamstown, Lucan, Co. Dublin (Phase 1)* · Completed · 44 homes · 951 m
    • Sarsfield Park, Lucan, Co. Dublin · Stage 4 tender approval · 5 homes · 951 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Shackleton Park · 88 applications in 10 years · 90% approved · most common: attic conversion / dormer

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Shackleton Phase 42—0 m
    Tubber Lane, Adamstown455—55 m
    Adamstown Tubber Lane455—55 m
    Tubber Lane Residential Development453—88 m
    Aderrig Development Area207—105 m
    Aderrig——106 m
    Tubber Lane179179 built (2026-Q2)119 m
    Shackelton Terrace——156 m

    Who applies most nearby

    Crèches and schools inspected

    NameLatest inspectionDistance
    Giraffe Childcare Shackleton · Crèche20 Nov 2025 · report · Tusla Early Years Inspectorate98 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.02 Nov 2026, 23:01open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Applicant organisations (from the CRO)Derived by Planning Register1 Nov 2026, 23:02—
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register4 Nov 2026, 23:36open
    How busy is this area Busier than most of South Dublin County Council.
    Homes approved
    Here1,561
    Council middle0
    Homes started
    Here2,526
    Council middle4
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    0% of homes built before 1971 (council 18%). 58% owner-occupied (council 67%).

    Homes built before 1971
    0% · council 18%
    Homes built since 2001
    99% · council 27%
    Owner-occupied
    58% · council 67%
    Rented
    38% · council 29%
    Children under 15
    31% · council 21%
    Aged 65 and over
    2% · council 13%
    Households with 2+ cars
    32% · council 40%
    Work mainly from home
    28% · council 10%
    This small area (404 people)South Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267103001/13

    Bus
    144 m
    Shackleton Park · C2, X30 · busiest stop within 500 m: 7 an hour at peak
    Planned
    975 m
    DART+ South West, DART+ South West: Hazelhatch and Celbridge - Dublin Heuston
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Flood
    Yes
    OPW flood map area within 100 m
    Nearest school
    801 m
    St Marys NS, 483 pupils
    Homes sold nearby
    212
    in 3 years, 29 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Marys NS · primary · 483 pupils · 801 m
    • Adamstown Community College · postprimary · 981 pupils · 1.2 km
    • St. John the Evangelist National School · primary · 417 pupils · 1.3 km
    • Adamstown Castle Educate Together National School · primary · 431 pupils · 1.4 km
    • Lucan Community College · postprimary · 966 pupils · 1.6 km
    • Scoil Aine Naofa · primary · 614 pupils · 1.7 km
    • St Thomas Junior National School · primary · 573 pupils · 1.7 km

    Stops 78

    • Shackleton Park · C2, X30 · 3/hour at peak · 144 m
    • Shackleton Park · C2, X30 · 7/hour at peak · 162 m
    • Shackleton Hall · C2, X30 · 7/hour at peak · 381 m
    • Shackleton Drive · C2, X30 · 2/hour at peak · 456 m
    • St. Helen's · L51, L52 · 2/hour at peak · 476 m
    • St. Helen's · L51, L52 · 2/hour at peak · 496 m
    • Shackleton Point · L51, L52 · 2/hour at peak · 501 m
    • Shackleton Point · L51, L52 · 2/hour at peak · 519 m

    Schools growing or shrinking planning in 3 years · pupils last year

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.25 ha · 847 m
    • South Dublin County Council · 0.43 ha · 966 m
    • South Dublin County Council · 0.16 ha · 977 m
    • South Dublin County Council · 0.05 ha · 978 m
    • Dublin City Council · 3 ha · 1.0 km
    • South Dublin County Council · 0.29 ha · 1.1 km
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Council consultation portalsPublic5 Nov 2026, 01:15open
    Council meetings (ModernGov)Public5 Nov 2026, 02:33open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    2. Flood risk area within 100 m: can you insure it?
      Ask for: A flood-cover quote before sale agreed.
      Insurer
    3. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    4. 453 homes approved 169 m away (Tubber Lane Residential…), not started: what is planned?
      Ask for: The planning file for SDZ26A/0008W.
      Council
    5. Stalled build 207 m away (Hallwell Square, Lucan): what happens next?
      Ask for: The planning file for SDZ23A/0015.
      Council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Finnstown
    Electoral division
    Lucan-St. Helens
    Electoral area
    Lucan
    Council
    South Dublin County Council
    Everything we found, as a list 8 lines
    • Zoned R3 (rural cluster); not protected; on the vacant land tax map; flood risk area within 100 m; high radon area.
    • 12 sites nearby could change: 2 stalled builds, 6 approved schemes, 4 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 12 Nov 2026.
    • 1,239 homes approved nearby, not started; largest 453 at Tubber Lane Residential Development.
    • Shackleton Park (bus C2, X30) 162 m away: 7 an hour at morning peak; 23 from all stops within 500 m. Planned: DART+ South West 975 m away, railway order granted (13 November 2024).
    • Here (2022 census): 58% owner-occupied (council 66%); 5% of homes empty (council 4%); most built 2016 or later; 44% drive to work (council 54%); population up 58% since 2016.
    • 6 home extensions within 250 m since 2025. Most were dormers or attic conversions. On Shackleton Park: 69 in 10 years, 90% approved.
    • Around here the council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 35
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
    www2.courts.ie—© the publisher4 Nov 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.02 Nov 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
    organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register1 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 5 Nov 2026, 09:12 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.