Planning report · Dublin City Council · 500 m around the house · the last 12 months · 5 Nov 2026, 07:40

Ormond Quay Lower

53.34647, -6.26465

Homes here mostly date from the 1990s. 2 planning files on this house, the latest from 2023. Most home extensions nearby get approved (88%). 64 homes approved 488 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 7 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations. 2 planning files on this house, the latest from 2023.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Ormond Quay LowerBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2023: 3926/23 · protected structure: permission, approved2023: 3806/23 · protected structure: permission, withdrawn or invalid2021: 1 file on Ormond Quay Lower2022: 1 file on Ormond Quay Lower2023: 5 files on Ormond Quay Lower2024: 1 file on Ormond Quay Lower8 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    3926/23 · protected structure: permission · approved 2023 · not started, runs out 2028
    approvedstartedsigned off
  2. 2023
    3806/23 · protected structure: permission · withdrawn
    approved?started?signed off?
On this site
M2
Zoning · Major town centre
Yes
Protected or listed · a protected building (Commercial premises); inside the zone around a recorded monument (DU018-020395-); a building in the national heritage inventory (50010343)
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z5 - DEV PLAN 2022-2028

ZoningM2 · Major town centre
What it says

Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

The main town centre — retail, offices, civic uses, apartments.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningM2 · Major town centre
What it says

Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

The main town centre — retail, offices, civic uses, apartments.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Protected buildingOn this site Commercial premises
Heritage inventoryOn this site house
Monument zoneOn this site Ford; Building
Radon1 in 20 homes have high radon (EPA)

Not on this site: conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Independent Newspapers Ltd. (308 m)

Vacant land taxNo not on the map
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Licensed industrial sites1Independent Newspapers Ltd.
Heritage inventory buildings796shop/retail outlet; Ladbrokes
Radon grid squares3
Monuments187Town defences; Mural tower (Historic Town)
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 11 on the draft 2027 map; 11 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, Sites and Monuments Record, SMR zones of notification, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), EPA licensed sites, OPW flood maps (CFRAM) · fetched 2 Nov 2026, 23:44
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
SMR zones of notificationCC BY 4.027 Sept 2026, 19:34open
EPA licensed facilities (LEAP)CC BY 4.02 Nov 2026, 23:44open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

This is a protected building: almost any change, inside or out, needs permission.

Figure 2

What happened to applications like yours

Extensions here: 84–100% by type. A new house in a garden is harder: 71% approved, and 1 in 2 is asked for more information.

Single-storey rear50 decided · more info asked 14%
96% · council 97%
Two-storey rear38 decided · more info asked 8%
92% · council 96%
Attic or dormer43 decided · more info asked 12%
84% · council 96%
First-floor19 decided · more info asked 37%
100% · council 94%
New house in a garden or site41 decided · more info asked 46%
71% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 191 nearby, 5,055 council-wide

Figure 3

Ormond Quay Lower, file by file since 2021

1 of 1 decided extensions on the road were approved.

8 planning files on Ormond Quay Lower since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 19 · 2023 · other extension · approved · 3213/23Porches, roofs, otherNo. 11A · 2021 · other work · approved · 2918/21No. 26 · 2022 · other work · approved · 4476/22No. 42 · 2023 · other work · refused · 3059/23No. 4 · 2023 · other work · refused · 3494/23No. 4 · 2023 · other work · approved · 3892/23No. 26 · 2023 · other work · approved · 4440/23No. 39 · 2024 · other work · approved · 3946/24New house in a side garden
ApprovedRefusedWithdrawn or invalid

8 files with "Ormond Quay Lower" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

1 approved2 no decision or withdrawn
KindAppliedApprovedRefused
First-floor21—
Other10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 4 is asked for more information, which adds about 90 days. Building starts about 6 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 4): 146 days; Appeal window: 4 weeks; If appealed: +222 days; Building starts: 188 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=220)55 daysIf more info asked (1 in 4)With further information: median 146 days (n=65)146 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 222 days (n=222, all appeals within 1.5 km)+222 daysBuilding startsStart notice: median 188 days after permission (n=89)188 days after permissionSigned off476 days after the start, for the few who file. 22% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated285 decided home extensions, 97 start notices, 222 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    37 of 118 appealed refusals became permissions. 11 of 110 appealed approvals were reversed.

    Refusals appealed118 decided
    37 became permissions
    Approvals appealed110 decided
    11 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 10 in the last 12 months

    1 of 3 changed the council's decision

    • 501251 Refused · 185 Parnell Street, at the corner of Dominick Street Lower, Dublin 1 · 494 m report
    • 324045 Split · 59-61 Dame Street, Dublin 2 · 225 m report
    • 501846 Pending · River Bar, 1, Burgh Quay/D'Olier Street, Dublin 2. · 411 m
    • 501152 Split · No. 3 Parnell Street (a Protected Structure RPS Ref. 6422) and Nos.… · 419 m report
    • 501721 Open · 30-33 College Green (a Protected Structure, RPS Ref. 1995), and… · 365 m
    • 324185 Granted with conditions · 71 Middle Abbey Street, Dublin 1 · 311 m report
    • 501654 Open · The Capel Building, Mary's Abbey, Dublin 7 , The building fronts onto… · 314 m
    • 500858 Open · No. 1-3 Ormond Quay Upper and No's. 1-3a Strand Street Little, Dublin… · 226 m
    • 500953 Refused · 3 Eustace Street, Dublin 2 · 218 m report
    • 500853 Granted with conditions · 7, D'Olier Street, Dublin 2 · 409 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher4 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 4

    What's changing around you?

    Street map around Ormond Quay Lower with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingDerelict buildingApproved, not startedRefusedEmpty land zoned for homesBuilding startedNo decision yet
    1. 1No.7 Westmoreland Street (D02 XF76) and 39 Fleet Street (D02 EK07), Temple Bar WEB3428/26No decision yet · 144 m
    2. 2Dunnes Stores, 48-50 Henry Street WEB3446/26No decision yet · 366 m
    3. 344 Grafton Street, Dublin 2 WEB3420/26No decision yet · 454 m
    4. 43 Eustace Street, Dublin 2 WEB3090/26Refused · 170 m
    5. 55 Ormond Quay Lower, Dublin 1 DS2178Derelict building · 170 m
    6. 633 and 34 Dame Street 4467/24Approved, no sign building has started · 285 m
    7. 77-13 ORMOND QUAY UPPER DUBLIN 7 D07YD54 DS2120Derelict building · 298 m
    8. 86 COLLEGE STREET DUBLIN 2 D02HX59 DS1850Derelict building · 464 m
    9. 9Mary's Lane, Halston Street and Little Green Street Site 5006/23Approved, no sign building has started · 489 m
    10. 106-7 Upper Abbey Street, Dublin 1 WEB1080/26Refused · 195 m
    11. 110.3 ha zoned for homesEmpty land zoned for homes · 62 m
    12. 1230/31 Liffey Street Lower, Dublin 1 WEB1667/25Building started · 103 m
    13. 13Temple Bar, Dublin 2 WEB1642/26Building started · 155 m
    14. 140.3 ha zoned for homesEmpty land zoned for homes · 278 m
    15. 1534 - 36 Strand Street Great, Dublin 1 D01W8X6 WEB2481/26No decision yet · 69 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 310 permissions since 2016, 120 show a start notice and 56 have a completion certificate.

    508 applications lodged within 500 m. Council: 314 approved, 81 refused. After appeals: 310 approved. Of those: 56 signed off, 0 built with the owner's opt-out, 64 started, 190 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT314: lodged → approved81: lodged → refused98: lodged → withdrawn or invalid15: lodged → undecided300: approved → approved69: refused → refused98: withdrawn or invalid → withdrawn15: undecided → undecided4 approved by the council, undecided after an appeal1 approved by the council, refused after an appeal9 approved by the council, withdrawn or invalid after an appeal10 refused by the council, approved after an appeal2 refused by the council, undecided after an appeal190: approved → no start notice found64: approved → started, not signed off56: approved → signed off508 lodged508 lodged314 approved314 approved81 refused81 refused98 withdrawn or invalid98 withdrawn or invalid15 undecided15 undecided310 approved310 approved70 refused70 refused107 withdrawn107 withdrawn21 undecided21 undecided190 no start notice found190 no start notice found64 started, not signed off64 started, not signed off56 signed off56 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured508 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    5 deadlines within 500 m; the first closes 5 Nov 2026.

    5 deadlines in the next 30 days: 2026-11-05 WEB3420/26: application received — Percy Nominees Limited intend to apply for planning permission for development at 44 Grafton Street, Dublin 2, D02 CA21.; 2026-11-06 WEB3428/26: application received — PROTECTED STRUCTURE: RETENTION: The development consists of: Retention permission for works carried out; at ground, mezz; 2026-11-09 WEB3446/26: application received — The development will consist of - The proposed development seeks to install new 2.4m / 2.77m high Bi folding stainless s; 2026-11-10 WEB3090/26: REFUSE PERMISSION — CHANGE OF USE: The development will consist of Change of Use of 5 no. Apartments from Residential to Student Accommodati; 2026-11-18 WEB3143/26: GRANT PERMISSION — We, Sunglass Hut Ireland Limited, intend to apply for planning permission for the replacement of the existing external stoday10 Nov15 Nov20 Nov25 Nov30 Nov5 DecWEB3420/26: application received — Percy Nominees Limited intend to apply for planning permission for development at 44 Grafton Street, Dublin 2, D02 CA21. · 454 m away · 2026-11-05WEB3428/26: application received — PROTECTED STRUCTURE: RETENTION: The development consists of: Retention permission for works carried out; at ground, mezz · 144 m away · 2026-11-06WEB3446/26: application received — The development will consist of - The proposed development seeks to install new 2.4m / 2.77m high Bi folding stainless s · 366 m away · 2026-11-09WEB3090/26: REFUSE PERMISSION — CHANGE OF USE: The development will consist of Change of Use of 5 no. Apartments from Residential to Student Accommodati · 170 m away · 2026-11-10WEB3143/26: GRANT PERMISSION — We, Sunglass Hut Ireland Limited, intend to apply for planning permission for the replacement of the existing external s · 454 m away · 2026-11-18
    Comments closeTime to appeal ends
    • Comments close 5 Nov 2026closes today
      3WEB3420/26 · application received — Percy Nominees Limited intend to apply for planning permission for development at 44 Grafton…
      €20 to the council · 454 m away
    • Comments close 6 Nov 20261 day left
      1WEB3428/26 · application received — PROTECTED STRUCTURE: RETENTION: The development consists of: Retention permission for works…
      €20 to the council · 144 m away
    • Comments close 9 Nov 20264 days left
      2WEB3446/26 · application received — The development will consist of - The proposed development seeks to install new 2.4m / 2.77m…
      €20 to the council · 366 m away
    • Time to appeal ends 10 Nov 20265 days left
      4WEB3090/26 · REFUSE PERMISSION — CHANGE OF USE: The development will consist of Change of Use of 5 no. Apartments from Residential…
      €220 to An Coimisiún Pleanála (€110 observer) · 170 m away
    • Time to appeal ends 18 Nov 202613 days left
      WEB3143/26 · GRANT PERMISSION — We, Sunglass Hut Ireland Limited, intend to apply for planning permission for the replacement of the…
      €220 to An Coimisiún Pleanála (€110 observer) · 454 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    64 homes 488 m away were approved Feb 2025 with no start notice yet; the permission runs to Feb 2030.

    Mary's Lane, Halston… · 64 homes: 64 homes approved Feb 2025, not started; 33 and 34 Dame Street · 14 homes: 14 homes approved Mar 2025, not started20242025202620272028202920302031Mary's Lane, Halston… · 64 homes488 m · 5006/2364 homes approved Feb 2025, not started64 homes approved Feb 2025, not started33 and 34 Dame Street · 14 homes285 m · 4467/2414 homes approved Mar 2025, not started14 homes approved Mar 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 9 within 500 m

    Derelict building 3

    • 55 Ormond Quay Lower, Dublin 1 · derelict since Jun 2026 · 170 m
    • 77-13 ORMOND QUAY UPPER DUBLIN 7 D07YD54 · derelict since Aug 2026 · 298 m
    • 86 COLLEGE STREET DUBLIN 2 D02HX59 · derelict since Sep 2024 · 464 m

    Approved, not started 2

    Empty land zoned for homes 4

    • 110.3 ha zoned for homes · no homes built on it yet · 62 m
    • 0.2 ha zoned for homes · no homes built on it yet · 277 m
    • 140.3 ha zoned for homes · no homes built on it yet · 278 m
    • 0.1 ha zoned for homes · no homes built on it yet · 470 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
    Council meetings (ModernGov)Public5 Nov 2026, 02:33open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
    Figure 9

    Applications within 500 m, by year

    Between 81 and 116 a year; busiest 2025. 79% of decisions were approvals.

    2021: 71, 2022: 81, 2023: 81, 2024: 88, 2025: 116, 2026: 710501002021: 58 approved2021: 10 refused2021: 2 withdrawn or invalid2021: 1 undecided71’21*2022: 55 approved2022: 21 refused2022: 5 withdrawn or invalid81’222023: 63 approved2023: 14 refused2023: 4 withdrawn or invalid81’232024: 65 approved2024: 18 refused2024: 5 withdrawn or invalid88’242025: 52 approved2025: 11 refused2025: 53 withdrawn or invalid116’252026: 21 approved2026: 7 refused2026: 29 withdrawn or invalid2026: 14 undecided71’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 116 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Building work nearby 44 in the last 12 months
    6 signed off as finished31 not signed off7 no sign-off needed
    • 3 Ormond Quay Upper, Dublin 7, D07 K276 · 17 Nov 2026 · short notice no sign-off needed · 254 m
    • Unit 20 Jervis Street, Dublin 1, D01 V6P4 · 4 Nov 2026 · start notice not signed off · WEB2584/26 · 208 m
    • 13 Saint Andrew's Street, Dublin, Dublin 2, D02 DP48 · 4 Nov 2026 · 7-day notice not signed off · 390 m
    • 13 Saint Andrew's Street, Dublin, Dublin 2, D02 DP48 · 23 Oct 2026 · start notice not signed off · 3010/23 · 390 m
    • Lands adjacent to No.2 The Rath, Dublin · 8 Oct 2026 · start notice, opted out no sign-off needed · F26A/0545E · 471 m
    • 18 Chancery Street, Dublin 7 · 23 Sept 2026 · 7-day notice not signed off · WEB1433/26 · 497 m
    • 3 Palace Street, Dublin, D02 T277 · 15 Sept 2026 · start notice not signed off · 300 m
    • 11-12 Westmoreland Street, Dublin, Dublin 2, D02 XE29 · 11 Sept 2026 · start notice not signed off · WEB1683/26 · 349 m
    • 84-88 South Great George's Street, Dublin 2, D02 TX84 · 11 Sept 2026 · short notice no sign-off needed · WEB2091/26 · 330 m
    • 13Temple Bar, Dublin 2 · 9 Sept 2026 · 7-day notice not signed off · WEB1642/26 · 155 m
    • 23 Mary Street, Dublin 1, D01 AW27 · 26 Aug 2026 · start notice not signed off · 276 m
    • 25 Suffolk Street, Dublin, Dublin 2, D02 F656 · 21 Aug 2026 · start notice signed off · WEB5549/25 · 434 m
    • 14-16 Mary Street, Dublin 1, D01 DH59 · 10 Aug 2026 · 7-day notice not signed off · 278 m
    • 1230/31 Liffey Street Lower, Dublin 1, D01 E7N3 · 6 Aug 2026 · 7-day notice not signed off · WEB1667/25 · 103 m
    • 59 Middle Abbey Street, Dublin 1, D01 N8Y6 · 5 Aug 2026 · 7-day notice not signed off · 4637/23 · 251 m
    • 17 Anglesea Street, Dublin 2, D02 DX09 · 29 Jul 2026 · 7-day notice not signed off · WEB2943/25 · 205 m
    • 54-62 Henry Street, Dublin 1, D01 A3T6 · 28 Jul 2026 · 7-day notice not signed off · 322 m
    • 62 O'Connell Street Upper, Dublin 1, D01 TV20 · 26 Jun 2026 · start notice not signed off · WEB1523/25 · 489 m
    • 61a William Street South, Dublin, Dublin 2, D02 W580 · 15 Jun 2026 · 7-day notice not signed off · WEB1137/26 · 462 m
    • 72 Dame Street, Dublin, Dublin 2, D02 K135 · 1 Jun 2026 · short notice no sign-off needed · WEB5372/25 · 261 m
    • Unit C, Ilac Shopping Centre, Henry Street, North City, Dublin 1, N/A · 28 Apr 2026 · 7-day notice signed off · 395 m
    • 23 Mary St Little, rear of 133,133A/B, 136A/B Capel St, and 7/7A Meeting House Lane, Dublin 1, Dublin 1, N/A · 16 Apr 2026 · start notice not signed off · 4554/23 & PREVIOUS 3274/20 & RFI RESPONSES · 372 m
    • 48 Fleet Street, Dublin, Dublin 2, D02 T883 · 14 Apr 2026 · 12 homes · 7-day notice not signed off · WEB2081/25 · 276 m
    • 10 Suffolk Street, Dublin, Dublin 2, D02 KX03 · 6 Apr 2026 · short notice no sign-off needed · 426 m
    • 29 O'Connell Street Lower, Dublin, Dublin 1, D01 TK65 · 3 Apr 2026 · short notice no sign-off needed · 3746/24 · 471 m
    • 16-18 Parliament Street, Dublin, Dublin 2, D02 VR94 · 2 Apr 2026 · 7-day notice not signed off · 4474/22 · 236 m
    • UCD Belfield, Dublin, Dún Laoghaire-Rathdown, Dublin 4 · 31 Mar 2026 · start notice signed off · 474 m
    • 8/9 Abbey Street Upper, Dublin, Dublin 1, D01 PH39 · 16 Mar 2026 · 7-day notice not signed off · 3373/25 · 196 m
    • 28 Bachelors Walk, Dublin, Dublin 1, D01 P4V6 · 14 Mar 2026 · 3 homes · start notice not signed off · 2867/21 · 299 m
    • 5/6 Dame Court, Dublin, Dublin 2, D02 XP58 · 9 Mar 2026 · 7-day notice not signed off · WEB2154/24 · 340 m
    • 1 Dame Street, Dublin, Dublin 2, D02 A4W7 · 23 Feb 2026 · 7-day notice signed off · 229 m
    • 138 Capel Street, Dublin, Dublin 1, D01 C4E9 · 23 Feb 2026 · start notice not signed off · 313 m
    • 11 Ormond Quay Lower, Dublin City Centre, Dublin 1, D01 K2X9 · 19 Feb 2026 · 7-day notice not signed off · 2918/21 · 128 m
    • 68 Arran Street East, Dublin 7, D07 AK15 · 11 Feb 2026 · start notice not signed off · WEB 1089/25 · 359 m
    • Unit A Central Plaza Dame Street, Dublin 2, D02 K7K5 · 9 Feb 2026 · start notice not signed off · 3636/24 · 229 m
    • 57a Jervis Lane Upper, Dublin, Dublin 1, D01T6T7 · 24 Dec 2025 · 7-day notice not signed off · WEB1038/25 · 428 m
    • The Clarence Hotel, 6-8 Wellington Quay, Dublin 2, Dublin, D02 HT44 · 19 Dec 2025 · 7-day notice not signed off · WEB2671/24 · 193 m
    • 35/36 Drury Street, Dublin, Dublin 2, NA · 19 Dec 2025 · 7-day notice not signed off · 421 m
    • Little Mary Street, Dublin 7, D07 PKW5 · 28 Nov 2025 · start notice not signed off · 401 m
    • Bridge House, 24/25 Parliament Street, Dublin 2, D02 X971 · 28 Nov 2025 · 7-day notice not signed off · WEB2768/24 · 257 m
    • 16/17 Ormond Quay Upper, Dublin, Dublin 7, D07 H7DE · 26 Nov 2025 · short notice no sign-off needed · 344 m
    • 71 Middle Abbey Street, Dublin 1, D01 E7K5 · 20 Nov 2025 · start notice not signed off · 4346/22 · 330 m
    • 6-7 Burgh Quay, Dublin, D02 VK44 · 19 Nov 2025 · start notice signed off · 479 m
    • Annex Building, Central Plaza, Dame Street,, Dublin 2, D02 A3X7 · 13 Nov 2025 · 7-day notice signed off · 233 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Homes coming 78 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Jervis Shopping Centre2424 not started (2026-Q1)150 m
    Arnotts Car Park Development155—212 m
    Dublin Central Site 37979 not started (2026-Q2)397 m
    Mary's Lane, Halston Street and Little Green Street Site94—446 m
    Fegan's, Chancery Street12—469 m
    1-6 Beresford Street189—515 m
    Apollo House5858 built (2025-Q2)587 m
    Former AIB Bank, O'Connell Street Upper20no activity on site reported (2026-Q2)641 m

    Who applies most nearby

    • Learning Group Limited — 4 applications, latest 5 May 2026
    • Heights Hospitality Operations Ltd — 2 applications, latest 2 Oct 2026
    • Mer Blanc Properties ULC — 2 applications, latest 8 Sept 2026
    • Olympia Productions Unlimited Company — 2 applications, latest 11 Aug 2026

    Crèches and schools inspected

    NameLatest inspectionDistance
    TCD Day Nursery · Crèche30 Jun 2026 · report · Tusla Early Years Inspectorate404 m
    Maple Montessori · Crèche1 Mar 2024 · report · Tusla Early Years Inspectorate470 m
    Christchurch Creche & Montessori School · Crèche3 Apr 2025 · report · Tusla Early Years Inspectorate473 m
    Pitter Patter Community Play Group · Crèche17 Feb 2026 · report · Tusla Early Years Inspectorate508 m
    Nurture Childcare & Early Learning Centre · Crèche9 Feb 2026 · report · Tusla Early Years Inspectorate594 m
    Portobello Montessori · Crèche18 Sept 2025 · report · Tusla Early Years Inspectorate641 m
    The Children's Place · Crèche25 Feb 2025 · report · Tusla Early Years Inspectorate710 m
    Scallywags Creche · Crèche20 Aug 2025 · report · Tusla Early Years Inspectorate721 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.02 Nov 2026, 23:01open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Applicant organisations (from the CRO)Derived by Planning Register1 Nov 2026, 23:02—
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register4 Nov 2026, 23:36open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here556
    Council middle50
    Homes started
    Here418
    Council middle105
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    13% of homes built before 1971 (council 52%). 4% owner-occupied (council 47%).

    Homes built before 1971
    13% · council 52%
    Homes built since 2001
    14% · council 19%
    Owner-occupied
    4% · council 47%
    Rented
    64% · council 45%
    Children under 15
    5% · council 15%
    Aged 65 and over
    5% · council 13%
    Households with 2+ cars
    1% · council 19%
    Work mainly from home
    7% · council 12%
    This small area (337 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268106011

    Road noise
    60–64 dB
    day–night average (EPA 2022)
    Bus
    87 m
    Wellington Quay · 115, 115C, 115X · busiest stop within 500 m: 40 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Yes
    OPW flood map area within 100 m
    Nearest school
    517 m
    Presentation Primary School, 165 pupils
    Homes sold nearby
    1373
    in 3 years, 183 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Presentation Primary School · primary · 165 pupils · 517 m
    • Mount Carmel Secondary School · postprimary · 386 pupils · 665 m
    • St Audoens Ns · primary · 171 pupils · 690 m
    • South City CNS · primary · 148 pupils · 701 m
    • Scoil Chaoimhin · primary · 68 pupils · 709 m
    • Central Infs School · primary · 149 pupils · 789 m
    • Larkin Community College · postprimary · 403 pupils · 790 m
    • Central Senior Mxd NS · primary · 227 pupils · 802 m

    Stops 205

    • Wellington Quay · 115, 115C, 115X, 120, 120B, 120F · 7/hour at peak · 87 m
    • Jervis · Red · 19/hour at peak · 141 m
    • Jervis · Red · 20/hour at peak · 148 m
    • Bachelors Walk · 115, 115C, 115X, 660, 704x, 707 · 151 m
    • Wellington Quay · 52, 69n, 74, 782, C1, C2 · 13/hour at peak · 152 m
    • Crampton Quay · 660, 707, 721, 761, 763, 853 · 2/hour at peak · 159 m
    • Bachelors Walk · 120, 120A, 120B, 120E, 120F, 120X · 168 m
    • Wellington Quay · 60, G1, G2 · 10/hour at peak · 173 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Presentation Primary School · 517 m+8.6% pupils (165) · an extension 2025, approved
    • Mount Carmel Secondary School · 665 m-3% pupils (386)
    • St Audoens Ns · 690 m-5.5% pupils (171)
    • South City CNS · 701 m-8.1% pupils (148)
    • Scoil Chaoimhin · 709 m+7.9% pupils (68)
    • Central Infs School · 789 m+0.7% pupils (149)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.28 ha · 195 m
    • Dublin City Council · 0.12 ha · 380 m
    • Fáilte Ireland · 0.14 ha · 385 m
    • Fáilte Ireland · 0.11 ha · 386 m
    • Dublin City Council · 1.65 ha · 396 m
    • Dublin City Council · 0.77 ha · 402 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Council consultation portalsPublic5 Nov 2026, 01:15open
    Council meetings (ModernGov)Public5 Nov 2026, 02:33open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Protected structure: permission (3926/23) approved 2023, not started: still planned?
      Ask for: The grant, and whether it stays with the house.
      Seller · solicitor
    2. Protected building: what changes would you be allowed?
      Ask for: A section 57 declaration from the council.
      Council
    3. Next to a recorded monument: does digging need notice?
      Ask for: Details of past works from the seller.
      Seller · council
    4. Flood risk area within 100 m: can you insure it?
      Ask for: A flood-cover quote before sale agreed.
      Insurer
    5. Application 144 m away open for comments until 6 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    North City
    Electoral area
    North Inner City
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • 2 applications on this site; latest 3926/23, approved 2023, not started, runs out 2028.
    • Zoned M2 (major town centre); protected building; heritage-listed; no vacant land tax; flood risk area within 100 m.
    • 9 sites nearby could change: 3 derelict, 2 approved schemes, 4 empty zoned plots.
    • 3 applications open for comments nearby; nearest closes 6 Nov 2026.
    • 78 homes approved nearby, not started; largest 64 at Mary's Lane, Halston Street and Little….
    • Ormond Quay Upr (bus 23, 24) 260 m away: 41 an hour at morning peak; 808 from all stops within 500 m.
    • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 64% rent (council 45%); 0% of homes empty (council 8%); most built 1991–2000; 1% drive to work (council 28%); population up 19% since 2016.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 35
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR zones)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
    www2.courts.ie—© the publisher4 Nov 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.02 Nov 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.02 Nov 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
    organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register1 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 5 Nov 2026, 07:40 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.