PlanningRegister.ie
Planning report · South Dublin County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 22:19

Earlsfort Road

53.34687, -6.41428

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (96%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 2 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Earlsfort RoadBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2021: 1 file on Earlsfort Road2024: 1 file on Earlsfort Road2025: 1 file on Earlsfort Road2026: 2 files on Earlsfort Road5 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RES: To protect and/or improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares1
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–99% by type. A new house in a garden is harder: 64% approved, and 1 in 2 are asked for more information.

Single-storey rear25 decided · more info asked 32%
96% · council 96%
Two-storey side14 decided · more info asked 7%
93% · council 94%
Single-storey side12 decided · more info asked 42%
92% · council 94%
Attic or dormer137 decided · more info asked 11%
99% · council 98%
New house in a garden or site11 decided · more info asked 64%
64% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 199 nearby, 2,404 council-wide

Figure 3

Earlsfort Road, file by file since 2021

3 of 3 decided extensions on the road were approved.

5 planning files on Earlsfort Road since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 47 · 2021 · single-storey rear · approved · SD21B/0543No. 67 · 2024 · single-storey rear · withdrawn or invalid · SD24B/0127No. 22 · 2026 · attic conversion / dormer · approved · SD26B/0203WNo. 57 · 2026 · attic conversion / dormer · approved · SD26B/0347WPorches, roofs, otherNo. 96 · 2025 · other work · approved · SD25B/0583WNew house in a side garden
ApprovedRefusedWithdrawn or invalid

5 files with "Earlsfort Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Dormer or attic11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 54 days. 1 in 6 is asked for more information, which adds about 69 days. Building starts about 2 months after permission.

    Comments open: 5 weeks · €20; Council decision: 54 days; If more info asked (1 in 6): 126 days; Appeal window: 4 weeks; If appealed: +114 days; Building starts: 65 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 50–55 (n=195)54 daysIf more info asked (1 in 6)With further information: median 126 days (n=41)126 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 114 days (n=16, all appeals within 1.5 km)+114 daysBuilding startsStart notice: median 65 days after permission (n=104)65 days after permissionSigned off468 days after the start, for the few who file. 22% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated236 decided home extensions, 106 start notices, 16 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    4 of 8 appealed refusals became permissions. 0 of 11 appealed approvals were reversed.

    Refusals appealed8 decided
    4 became permissions
    Approvals appealed11 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months

    None of 1 changed the council's decision

    • 500494 Granted · 96, Earlsfort Road, Lucan, Co. Dublin, K78 X275 · 118 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher30 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 4

    What's changing around you?

    Street map around Earlsfort Road with 11 numbered planning items
    ⌖ the houseAppealBuilding startedApprovedOther
    1. 196, Earlsfort Road 500494Appeal: approved · 118 m
    2. 23 Earlsfort Close, Lucan SD25B/0568WBuilding started · 179 m
    3. 357, Earlsfort Road SD26B/0347WApproved · 23 m
    4. 4Musgrave Retail Partners Ireland Chilled Foods Premises, Ballyowen Industrial and Business Park SD26A/0166WApproved · 152 m
    5. 522 Earlsfort Road, Lucan SD26B/0203WApproved · 328 m
    6. 6Unit 37, Fonthill industrial park ED26/0047Section 5: exempt · 420 m
    7. 738 Liffey Park, Lucan SD26B/0022WApproved · 452 m
    8. 88, Colthurst Road SD26A/0093WApproved · 464 m
    9. 913, Liffey Close SD26B/0205WApproved · 475 m
    10. 1022, Colthurst Close SD26B/0331WApproved · 477 m
    11. 112, Abbeywood Park ED26/0044Section 5: exempt · 483 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 46 permissions since 2016, 17 show a start notice and 0 have a completion certificate.

    67 applications lodged within 500 m. Council: 46 approved, 4 refused. After appeals: 46 approved. Of those: 0 signed off, 3 built with the owner's opt-out, 14 started, 29 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT46: lodged → approved4: lodged → refused17: lodged → withdrawn or invalid46: approved → approved4: refused → refused17: withdrawn or invalid → withdrawn29: approved → no start notice found3: approved → built, owner opted out14: approved → started, not signed off67 lodged67 lodged46 approved46 approved4 refused4 refused17 withdrawn or invalid17 withdrawn or invalid46 approved46 approved4 refused4 refused17 withdrawn17 withdrawn29 no start notice found29 no start notice found3 built, owner opted out3 built, owner opted out14 started, not signed off14 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured67 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Applications within 500 m, by year

      Between 8 and 18 a year; busiest 2022. 92% of decisions were approvals.

      2021: 10, 2022: 18, 2023: 8, 2024: 12, 2025: 12, 2026: 7051015202021: 7 approved2021: 1 refused2021: 2 withdrawn or invalid10’21*2022: 11 approved2022: 1 refused2022: 6 withdrawn or invalid18’222023: 4 approved2023: 2 refused2023: 2 withdrawn or invalid8’232024: 9 approved2024: 3 withdrawn or invalid12’242025: 8 approved2025: 4 withdrawn or invalid12’252026: 7 approved7’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 11 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      Building work nearby 5 in the last 12 months
      1 not signed off4 no sign-off needed
      • 39 Earlsfort Rise, Lucan, Dublin · 9 Oct 2026 · 1 homes · start notice not signed off · 337 m
      • 8 Colthurst Road, Lucan, Dublin, K78 RK44 · 15 Jul 2026 · short notice no sign-off needed · SD26A/0093W · 478 m
      • 23 Earlsfort Close, Lucan, South Dublin, K78 HN30 · 29 May 2026 · start notice, opted out no sign-off needed · SD25B/0568W · 179 m
      • 5 Colthurst Mews, Lucan, South Dublin, K78 D232 · 13 Nov 2025 · short notice no sign-off needed · SD25B/0467W · 378 m
      • 22 Colthurst Close, Lucan, South Dublin, K78 TW68 · 31 Oct 2025 · start notice, opted out no sign-off needed · SD25B/0478W · 490 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Larkfield Square2020 not started (2026-Q2)772 m
      SDCC Lands @28 Locations——880 m
      St. Edmunds313—935 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Keane Minds Montessori School · Crèche18 Sept 2025 · report · Tusla Early Years Inspectorate24 m
      Tots of Fun · Crèche21 May 2025 · report · Tusla Early Years Inspectorate285 m
      Kidsbrook Creche · Crèche9 Sept 2024 · report · Tusla Early Years Inspectorate355 m
      Giraffe Childcare Lucan · Crèche24 Apr 2025 · report · Tusla Early Years Inspectorate640 m
      Cocoon Childcare - Lucan · Crèche6 Aug 2025 · report · Tusla Early Years Inspectorate668 m
      Hansel & Gretel Playschool · Crèche16 Sept 2024 · report · Tusla Early Years Inspectorateapprox. 824 m
      Startbright Balgaddy · Crèche25 Nov 2024 · report · Tusla Early Years Inspectorate873 m
      Honeybears Community Childcare · Crèche14 Oct 2025 · report · Tusla Early Years Inspectorate930 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area About as busy as most of South Dublin County Council.
      Homes approved
      Here30
      Council middle0
      Homes started
      Here3
      Council middle5
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      0% of homes built before 1971 (council 18%). 66% owner-occupied (council 67%).

      Homes built before 1971
      0% · council 18%
      Homes built since 2001
      5% · council 27%
      Owner-occupied
      66% · council 67%
      Rented
      31% · council 29%
      Children under 15
      22% · council 21%
      Aged 65 and over
      3% · council 13%
      Households with 2+ cars
      51% · council 40%
      Work mainly from home
      5% · council 10%
      This small area (455 people)South Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267100079

      Bus
      388 m
      Earlsfort · C1, C2 · busiest stop within 500 m: 13 an hour at peak
      Radon
      1 in 10
      homes here likely high (EPA). Test it
      Nearest school
      552 m
      Stewarts School, 145 pupils
      Homes sold nearby
      33
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Stewarts School · primary · 145 pupils · 552 m
      • Divine Mercy Junior National School · primary · 204 pupils · 708 m
      • Divine Mercy Senior National School · primary · 274 pupils · 797 m
      • Lucan Community National School · primary · 375 pupils · 822 m
      • Lucan Educate Together NS · primary · 384 pupils · 886 m
      • St Kevin's Community College · postprimary · 525 pupils · 894 m

      Stops 40

      • Earlsfort · C1, C2 · 13/hour at peak · 388 m
      • Earlsfort Road · C1, C2 · 5/hour at peak · 399 m
      • Castle Road · C1, C2 · 5/hour at peak · 405 m
      • St Mark's Grove · G2, L53 · 6/hour at peak · 527 m
      • St Mark's Grove · 51D, G2, L53 · 7/hour at peak · 547 m
      • Glenfield · 51D, G2, L53 · 7/hour at peak · 553 m
      • Castle Road · C1, C2 · 13/hour at peak · 558 m
      • Fonthill Retail Pk · 51D, G2, L53 · 7/hour at peak · 586 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Stewarts School · 552 m+2.1% pupils (145)
      • Divine Mercy Junior National School · 708 m-4.2% pupils (204)
      • Divine Mercy Senior National School · 796 m-10.5% pupils (274)
      • Lucan Community National School · 822 m-2.1% pupils (375)
      • Lucan Educate Together NS · 886 m0% pupils (384)
      • St Kevin's Community College · 894 m+7.6% pupils (525) · a pitch or play area 2026, section 5: exempt

      Open consultations

      Council meetings 22 items

      Public land

      • South Dublin County Council · 0.6 ha · 132 m
      • South Dublin County Council · 0.29 ha · 140 m
      • South Dublin County Council · 0.15 ha · 143 m
      • South Dublin County Council · 0.1 ha · 178 m
      • South Dublin County Council · 1.93 ha · 179 m
      • South Dublin County Council · 6.09 ha · 180 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
      Council consultation portalsPublic31 Oct 2026, 01:06open
      Council meetings (ModernGov)Public31 Oct 2026, 02:21open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. High radon area (1 in 10 homes): has it been tested?
        Ask for: Radon test results.
        Seller
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Ballyowen
      Electoral division
      Lucan-Esker
      Electoral area
      Palmerstown-Fonthill
      Council
      South Dublin County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
      • Nothing nearby looks set to change.
      • Earlsfort (bus C1, C2) 388 m away: 13 an hour at morning peak; 23 from all stops within 500 m.
      • Inside Dublin Airport Noise Zone D.
      • Here (2022 census): 66% owner-occupied (council 66%); 2% of homes empty (council 4%); most built 1991–2000; 59% drive to work (council 54%); population up 5% since 2016.
      • 1 home extension within 250 m since 2026.
      • Around here the council decides in a median 51 days (about 7 weeks); 1 in 7 is asked for more information.
      • Homes started within 1 km: 1 in the last year, 313 three years before.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 27
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
      www2.courts.ie—© the publisher30 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 31 Oct 2026, 22:19 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.