Breakwater Road North, T9
What closes soonest 0 open windows
No observation, appeal or consultation window is open within 500 m today.
Where this is
- Settlement
- Dublin city and suburbs
- Electoral division
- North Dock B
- Local electoral area
- North Inner City
- Local authority
- Dublin City Council
Census 2022, small area 268108026/02
26.7% owner-occupied, 70.8% privately rented, 6.7% social. Vacancy 12.4%.
Zoning evaluated against the point
Zone Z7 - DEV PLAN 2022-2028
Z7: Employment (Heavy): To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.
What that means: Zoned for employment uses. Housing is not the intended use here.
Source: zoning · fetched 12 Sept 2026, 02:04
| Source | Licence | Fetched | Link |
|---|---|---|---|
| zoning | CC-BY-4.0 | 12 Sept 2026, 02:04 | open |
Designations and constraints within 500 m
| Designation | Count | Examples |
|---|---|---|
| EPA-licensed facility | 2 | Irish Tar & Bitumen Suppliers; Indaver Ireland Limited (Tolka Quay Road) |
| Natural Heritage Area (incl. proposed) | 1 | North Dublin Bay |
| Radon risk area | 1 | About 1 in 20 homes in this area is likely to have high radon levels |
| Special Protection Area | 1 | South Dublin Bay and River Tolka Estuary SPA |
Sources: constraints, constraints.epa_licence, constraints.flood_cfram, constraints.nha, constraints.radon, constraints.spa · fetched 11 Sept 2026, 19:11
| Source | Licence | Fetched | Link |
|---|---|---|---|
| constraints | mixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false) | 11 Sept 2026, 19:11 | open |
| constraints.epa_licence | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
| constraints.flood_cfram | CC-BY-NC-ND-4.0 · not redistributable — shown as a flag only | 11 Sept 2026, 19:11 | open |
| constraints.nha | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
| constraints.radon | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
| constraints.spa | CC-BY-4.0 | 11 Sept 2026, 19:11 | open |
Residential Zoned Land Tax
This site is not on the current draft or final RZLT map.
Source: rzlt · fetched 12 Sept 2026, 00:23
| Source | Licence | Fetched | Link |
|---|---|---|---|
| rzlt | CC-BY-4.0 | 12 Sept 2026, 00:23 | open |
Planning applications 9 in 5 years within 500 m
Recent decisions and applications
- No. 2 Branch Road North Extension, Dublin Port, Dublin 3 Grant permissionThe development consists of constructing a pipe bridge with an approximate overall height of 8m with associated concrete supports, to allow new pipelines and cables to be routed between two yards. This pipe bridge will span between the Circle K Terminal, and the pipe track on the opposite side of 2 Branch Road North Ext., outside TOP Yard 1, located in Dublin Port. Signs informing of the clearance height beneath the pipe bridge will also be installed on the bridge. A height restriction barrier with an accompanying sign informing of the clearance space beneath the pipe bridge will be installed over 2 Branch Road North Extension, south of the pipe bridge.
- No. 2 Branch Road North Extension, Dublin Port, Dublin 3 Application declared invalidThe development consists of constructing a pipe bridge with an approximate overall height of 8m with associated concrete supports, to allow new pipelines and cables to be routed between two yards. This pipe bridge will span between the Circle K Terminal, and the pipe track on the opposite side of 2 Branch Road North Ext., outside TOP Yard 1, located in Dublin Port. Signs informing of the clearance height beneath the pipe bridge will also be installed on the bridge. A height restriction barrier with an accompanying sign informing of the clearance space beneath the pipe bridge will be installed over 2 Branch Road North Extension, south of the pipe bridge.
- No. 2 Branch Road North Extension, Dublin Port, Dublin 3. The site is adjacent to Promenade Road and Tolka Quay Road. Application declared invalidThe development consists of constructing a pipe bridge with an approximate overall height of 8m with associated concrete supports, to allow new pipelines and cables to be routed between two yards. This pipe bridge will span between the Circle K Terminal, and the pipe track on the opposite side of 2 Branch Road North Ext., outside TOP Yard 1, located in Dublin Port. Signs informing of the clearance height beneath the pipe bridge will also be installed on the bridge. A height restriction barrier with an accompanying sign informing of the clearance space beneath the pipe bridge will be installed over 2 Branch Road North Extension, south of the pipe bridge.
- Circle K Terminal , Promenade Road , No 2 Branch Road, North Extension, Dublin Port, Dublin 3 Application declared invalidThe development consists of constructing a pipe bridge with an approximate overall height of 8m with associated concrete supports, to allow new pipelines and cables to be routed between two yards. This pipe bridge will span between the Circle K Terminal, and the pipe track on the opposite side of 2 Branch Road North Ext., outside TOP Yard 1, located in Dublin Port. Signs informing of the clearance height beneath the pipe bridge will also be installed on the bridge. A height restriction barrier with an accompanying sign informing of the clearance space beneath the pipe bridge will be installed over 2 Branch Road North Extension, south of the pipe bridge.
- Dublin Ferryport Terminals (DFT), Breakwater Road North, Dublin 1, D01 V3H3 Grant permissionModifications to existing workshop, ancillary office and welfare facilities to provide additional accommodation on existing site. Construction of 264 sq.m, 9.565m high extension to existing industrial building for additional workshop space. Construction of 246sq.m enclosed mezzanine office area with associated access lift, internal and external stairways, and additional windows to northern and western facades. Relocation of existing access ladder to roof on southern facade. Installation of 132sq.m of solar panels to extension roof. All associated diversions to existing drainage and water supply within the site.
- Alexandra Road, Dublin Port, Dublin 1, D01 R5W7 Grant permissionRemoval of the existing Tank 3 (378.5 tonnes bitumen) and installing Tank 4C (198.45 tonnes bitumen), also adding horizontal walkway from Tank 2 to portion of spiral stair on Tank 4C and another horizontal walkway linking Tank 4B to Tank 4C.
- Irish Tar & Bitumen Suppliers, Alexandra Road, Dublin Port, D01 R5W7 Application declared invaThe Development consists of: Removal of the existing Tank 3 (378.5 tons bitumen) and installing Tank 4C (198.45 tons bitumen), also adding horizontal walkway from Tank 2 to portion of spiral stair on Tank 4C and another horizontal walkway linking Tank 4B to Tank 4C.
- A site located north of Berth 50, Alexandra Road, Dublin Port, Dublin 1 Grant permissionThe development will consist of : partial demolition of an electrical substation building to include an ESB room the north-east of the overall existing building which contains an electrical substation (10kV) together with the removal of associated raised access, steps and railings (total demolition of area c.32 sq.m) and reinstatement works; Installation of a new package substation (10kV) (c.6.2 sq.m and c. 2.8 in height) separate and to the north of existing substation building on an elevated platform (c. 30 sq.m and c. 1m in height); installation of new sheet piles on the landside to mitigate wash-out of sediment through the existing rock armour; adjustments to the existing surface parking layout; removal, relocation and replacement of a portion of existing fencing and gates (2.7m high); provision of 2 no. portable storage containers to support tugboats operations; site clearance, resurfacing, line marking, service trench excavation for electrical and communication duct installation, sub-surface remedial work and all associated site development works.
- Top Oil Yard 1, Promenade Road, Parish of Saint Thomas, Dublin Port, Dublin 3, D03 HK83 Grant permissionPlanning permission for development at the following adjacent sites: Top Oil Yard 1, Promenade Road, Parish of Saint Thomas, Dublin Port, Dublin 3, D03 HK83. Top Oil Yard 2, Tolka Quay Road, Dublin Port. Circle K Yard 2, Tolka Quay Road, Dublin Port. The sites are adjacent to Tolka Quay Road, Promenade Road and 2 Branch Road North Extension. The development consists of constructing two pipebridges with a maximum height of 8.5m to allow new pipework and cables to be routed between the yards. Pipebridge No. 1 will be between Top Oil Yard 1 and the neighbouring Fareplay Yard 2. Pipebridge No. 2 will be between the Top Oil Yard 2 and the neighbouring Fareplay Yard 2. A small concrete shelter in Fareplay Yard 2 is to be dismantled to allow room for pipebridge supports.
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
Source: npad · fetched 12 Sept 2026, 20:38
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 12 Sept 2026, 20:38 | open |
Appeals 1 in 5 years within 500 m
- ACP 320250 Other
Source: acp · fetched 12 Sept 2026, 00:05
| Source | Licence | Fetched | Link |
|---|---|---|---|
| acp | CC-BY-4.0 | 12 Sept 2026, 00:05 | open |
Commencement notices 2 in 3 years within 500 m
- 2 Alexandra Road, Dublin, Dublin 1, D01 WD28 — Seven day notice
- Alexandra Rd, Dublin, Dublin 1, D01 R5W7 — Commencement notice
One notice can cover many buildings — count notices, never building rows, or a single multi-unit scheme reads as a trend (T11).
Source: bcms · fetched 11 Sept 2026, 23:29
| Source | Licence | Fetched | Link |
|---|---|---|---|
| bcms | CC-BY-4.0 | 11 Sept 2026, 23:29 | open |
Sales 0 in 36 months within 500 m
No Property Price Register sale geocoded within 500 m in 36 months.
Sources: cara_listings, ppr · fetched 11 Sept 2026, 20:14
| Source | Licence | Fetched | Link |
|---|---|---|---|
| cara_listings | Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped. | 11 Sept 2026, 20:14 | open |
| ppr | PSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.' | 12 Sept 2026, 20:31 | open |
Consultations 4 matched by place
- Public Participation in the Identification of New Bathing Waters 13 days left
- iMEND 1 - Portobello Community Engagement 20 days left
- Lansdowne Valley Park Active Travel Scheme 26 days left
- Dublin District Heating Project Part 8 39 days left
Source: consult · fetched 12 Sept 2026, 02:04
| Source | Licence | Fetched | Link |
|---|---|---|---|
| consult | public | 12 Sept 2026, 02:04 | open |
Council items 10 in 24 months
- With reference to the Extinguishment of Public Right of Way at Rutland Cottages, Dublin 1
- Report No. 181/2026 of the A/Executive Manager (S. Hennessy) - With reference to Disposal of a site at Church Street Upper and Brunswick Street North, D7 to Brunswick North Regeneration Limited.
- With reference to the disposal of a site at Church Street Upper and Brunswick Street North, Dublin 7 to Brunswick North Regeneration Limited
- Report No. 149/2026 of the Executive Manager (D. O'Connor) - With reference to the grant of a further licence of site at Lourdes Parish Hall, Rutland Street, Dublin 1
- Report No. 150/2026 of the Executive Manager (D. O'Connor) - With reference to the proposed grant of a 3-year lease of the premises at Liberty Corner (Retail Unit No.7), James Joyce Street, Dublin 1 to Wexford Centre Project CLG.
- COUNCILLOR NIAL RING To ask the Area Manager to provide a comprehensive, audited list and a localised analysis of specific state-supported and community service facilities currently operating within the North Inner City and rest of the Central Area. Specifically, could the Manager provide: a. A complete breakdown of all such facilities located within the Central Area, itemised by
- With reference to the proposed grant of a 3-year lease of the premises at Liberty Corner (Retail Unit No.7), James Joyce Street, Dublin 1 to Wexford Centre Project CLG.
- With reference to the grant of a further licence of site at Lourdes Parish Hall, Rutland Street, Dublin 1 to Francesca Arkins, Alysia Arkins and Christy Fagan.
- Report No. 91/2026 of the Executive Manager (D. O`Connor) - With reference to the disposal of a plot to the rear of 27 Broadstone Avenue, Phibsborough, Dublin 7
- Councillor Mannix Flynn Can the manager issue a full report regarding the compressor waste management structures that are now placed in and around the City Centre? This report to include who maintains these structures? What involvement the city council have in removing rubbish and dirt that is around these structures?
Source: moderngov · fetched 11 Sept 2026, 21:46
| Source | Licence | Fetched | Link |
|---|---|---|---|
| moderngov | public | 11 Sept 2026, 21:46 | open |
Capacity and public land
No publishable utility-capacity record within the radius. 9 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
- Dublin Port Company — Dublin city and suburbs
Sources: esbn, lda_lands · fetched 11 Sept 2026, 16:42
| Source | Licence | Fetched | Link |
|---|---|---|---|
| esbn | all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only | 11 Sept 2026, 16:42 | open |
| lda_lands | CC-BY-4.0 | 11 Sept 2026, 16:43 | open |
Schools and public transport within 1.0 km
Schools
None within 1.0 km.
Stops 9 · routes 53, 853
- Alexandra Rd East
- Breakwater Rd
- Ferry Termnl 2
- Ferry Port Termnl 2
- Branch Road
- Ferry Port Termnl 2
- Tolka Quay Rd
- Ferry Port Termnl 1
Sources used in this report
| Section | Source | Licence | Fetched |
|---|---|---|---|
| Location | places | CC-BY-4.0 | 11 Sept 2026, 21:28 |
| Parcel | parcels | CC-BY-4.0 | 11 Sept 2026, 19:06 |
| Zoning | zoning | CC-BY-4.0 | 12 Sept 2026, 02:04 |
| Constraints | constraints | mixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false) | 11 Sept 2026, 19:11 |
| Constraints | constraints.epa_licence | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Constraints | constraints.flood_cfram | CC-BY-NC-ND-4.0 · not redistributable, flag only | 11 Sept 2026, 19:11 |
| Constraints | constraints.nha | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Constraints | constraints.radon | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Constraints | constraints.spa | CC-BY-4.0 | 11 Sept 2026, 19:11 |
| Rzlt | rzlt | CC-BY-4.0 | 12 Sept 2026, 00:23 |
| Planning | npad | CC-BY-4.0 | 12 Sept 2026, 20:38 |
| Appeals | acp | CC-BY-4.0 | 12 Sept 2026, 00:05 |
| Commencements | bcms | CC-BY-4.0 | 11 Sept 2026, 23:29 |
| Sales | cara_listings | Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped. | 11 Sept 2026, 20:14 |
| Sales | ppr | PSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.' | 12 Sept 2026, 20:31 |
| Consultations | consult | public | 12 Sept 2026, 02:04 |
| Council items | moderngov | public | 11 Sept 2026, 21:46 |
| Capacity | esbn | all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only | 11 Sept 2026, 16:42 |
| Public land | lda_lands | CC-BY-4.0 | 11 Sept 2026, 16:43 |
| Projects | social_housing | CC-BY-SA-4.0 | 11 Sept 2026, 20:13 |
| Amenities | gtfs | CC-BY-4.0 | 11 Sept 2026, 19:16 |
| Amenities | schools | CC-BY-4.0 | 11 Sept 2026, 16:41 |
| Deadlines | acp | CC-BY-4.0 | 12 Sept 2026, 00:05 |
| Deadlines | consult | public | 12 Sept 2026, 02:04 |
| Deadlines | moderngov | public | 11 Sept 2026, 21:46 |
| Deadlines | npad | CC-BY-4.0 | 12 Sept 2026, 20:38 |
| Deadlines | rzlt | CC-BY-4.0 | 12 Sept 2026, 00:23 |
Generated 12 Sept 2026, 21:39 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.