HA - High Amenity: Protect these highly sensitive and scenic locations from inappropriate development and reinforce their character, distinctiveness and sense of place. In recognition of the amenity potential of these areas opportunities to increase public access will be explored.
G3 — High amenitythe fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029
HA - High Amenity: Protect and enhance high amenity areas
What that means: Protected high-amenity landscape. Development is resisted to preserve the character of the area.
An OPW flood extent intersects this area. The OPW's map is licensed CC-BY-NC-ND, so we show a flag only — see the extent at floodinfo.ie.
Designation
Count
Examples
Natural Heritage Area (incl. proposed)
1
Liffey Valley
NIAH-recorded building
138
weir; Round House; hotel
Radon risk area
7
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels
Record of Protected Structures
4
Glenwood; Hillsboro House (now called Mount Pleasant House); Coldblow Bridge (remains)
Recorded monument
36
Bridge; Ritual site - holy well; Castle - unclassified
(Shop Front Grant)
-Replace the existing shop front door as it is damaged.
-Repaint the wooden frame arounf door.
-Add illuminated soft white led light to sign above shop front door.
-Add flowers above shop door.
-Repaint the windows on middle and top level.
Change of use of an existing terraced first, and second foor office unit to provide 2no. self-contained own door access studio apartments, including internal alterations, associated services, and all ancillary site development works.
Warmer home scheme to cover cladding at the bottom half of the front of the house with 100mm external wall insulation to maximise the energy efficiency of the dwelling and to protect from water ingress.
ED26/0061received 1 Jul 2026decided 23 Jul 2026943 m away
Alterations to existing dormer bungalow including (i) construction of 2 no. dormers to the rear section of the pitched roof; (ii) internal alterations at 1st floor consisting of the provision of 2 no. bedrooms; (iii) 2 new windows to the rear gable elevation and all associated site development works.
SD26B/0290Wreceived 11 Jun 2026decided 5 Aug 2026542 m away
Whether the use of the Moat Lodge B&B at Lock Road Lucan Co Dublin K78 P7X3 to provide accommodation for persons seeking international protection, constitutes exempted development or does not constitute exempt development
ED26/0010received 19 Mar 2026decided 8 Apr 2026791 m away
The provision of a new external ramp to enhance emergency escape provisions from the existing nursing home to a place of safety, the removal of two car parking spaces to the north west of the site, the relocation of an existing waste water access chamber and the installation of new external lighting to service the ramp and all associated site works.
SD26A/0058Wreceived 5 Mar 2026decided 28 Apr 2026590 m away
The development will consist of the material change of use from office/storage unit to a unit for day services use, to enable the provision of services to people with intellectual disabilities, the removal of the existing mezzanine floor, the removal of 4nr existing windows and infilling to match existing cladding to the front and rear elevations at first floor level, the installation of 3nr new window openings to the rear elevation at ground floor level the infilling of existing structural opening to the front elevation with glazing and spandrel panelling, while retaining the existing internal roller shutter unit, the repositioning and widening of the main entrance door and the installation of a full-height fixed glazed unit to the front elevation, installation of manifestation signage to the front elevation door and glazing, the widening and lowering of the existing rear exit door and all associated site works.
SD26A/0053Wreceived 25 Feb 2026decided 14 Apr 2026940 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
No publishable utility-capacity record within the radius. 28 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 15 Sept 2026, 00:53 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.