What closes soonest 4 open windows
Observations close 21 Sept 20266 days left
SD26B/0374W — application received — Planning permission for the construction of a single-storey front porch extension, plus all associated site works.
5 weeks from receipt (16 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 476 m away
Observations close 24 Sept 20269 days left
ED26/0070 — application received — External Insulation wrap, no structural work detached house built c1974.
5 weeks from receipt (20 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 301 m away
Appeal window closes 28 Sept 202613 days left
SD26A/0160W — Request Additional Information — Demolition of disused bungalow, unoccupied for c.9 years and in advanced disrepair with the construction of a new office
4 weeks from the council's decision (31 Aug 2026) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer) · 263 m away
Observations close 30 Sept 202615 days left
ED26/0091 — application received — The erection of a porch outside our external front door of the house. The porch will be situated at least x metres from
5 weeks from receipt (26 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 65 m away
R2 — Existing residentialsouth dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028
RES: To protect and/or improve residential amenity
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (0.12 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
The erection of a porch outside our external front door of the house. The porch will be situated at least x metres from the road. The floor area does not exceed 2 metres squared. The slated pitched roof is 3 metres in height.
Single storey rear and side extension incorporating internal modifications; amendments to the existing windows to the side elevation together with the addition of 2two new windows; relocation of the front door from the side elevation of the existing porch extension to the front elevation; all associated site works.
The development will consist of change of use of existing dwelling to doctor’s general practice rooms, modifications to existing elevations and plan layout, together with two storey extension to the rear comprising 2 no. 2 bed apartments. The development also includes 14 no. car parking spaces, bicycle stand, modifications to existing entrance, private and common amenity areas and all associated site works.
SD25A/0304Wreceived 8 Jul 2026decided 4 Aug 20260 m away
Demolition of disused bungalow, unoccupied for c.9 years and in advanced disrepair with the construction of a new office building of two storeys over basement and ancillaries comprising site development works, soft landscaping, cycle and car parking areas with EV charging points.
SD26A/0160Wreceived 6 Jul 2026decided 31 Aug 2026263 m away
Removal of boiler shed and store to rear & construction of a first floor extension to side above existing converted garage and single-storey kitchen extension to the rear with associated site works
SD26B/0146Wreceived 31 Mar 2026decided 20 May 2026333 m away
The installation of perimeter fencing and access gates to surround the schools sports pitch. The fencing will comprise a 2.6 metre high rigid mesh fence with 2.4 metre high ball-stop netting above, together with all ancillary site works.
SD26A/0056Wreceived 3 Mar 2026decided 27 Apr 202678 m away
The development will consist of the material change of use from office/storage unit to a unit for day services use, to enable the provision of services to people with intellectual disabilities, the removal of the existing mezzanine floor, the removal of 4nr existing windows and infilling to match existing cladding to the front and rear elevations at first floor level, the installation of 3nr new window openings to the rear elevation at ground floor level the infilling of existing structural opening to the front elevation with glazing and spandrel panelling, while retaining the existing internal roller shutter unit, the repositioning and widening of the main entrance door and the installation of a full-height fixed glazed unit to the front elevation, installation of manifestation signage to the front elevation door and glazing, the widening and lowering of the existing rear exit door and all associated site works.
SD26A/0053Wreceived 25 Feb 2026decided 14 Apr 2026478 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
No publishable utility-capacity record within the radius. 12 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
The Minister for Education and Skills — Dublin city and suburbs
1.77 hafolio DN202638F71 m awayas of 1 Jul 2023
Electricity Supply Board — Dublin city and suburbs
0.31 hafolio DN16652N157 m awayas of 1 Jul 2023
The Minister for Education and Skills — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
Third-party advertisement data read from daft.ie's own JSON gateway. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (the licensed PSP's name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers, profile images and all media URLs are dropped at fetch time and never written down. Vendor and buyer identities are not in this data.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 15 Sept 2026, 23:06 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.