Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 15:31

Quarry Road

53.36200, -6.29181

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (94%). 21 homes approved 126 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Quarry RoadBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 2 files on Quarry Road2022: 1 file on Quarry Road2023: 1 file on Quarry Road2024: 1 file on Quarry Road2025: 2 files on Quarry Road7 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Protected building1 within 100 m Cabra Road
Radon1 in 20 homes have high radon (EPA)

Not on this site: heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings5post box; bridge
Radon grid squares1
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 2 on the draft 2027 map; 2 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 91–100% by type. A new house in a garden is harder: 66% approved, and 1 in 2 are asked for more information.

Single-storey rear79 decided · more info asked 18%
97% · council 97%
Two-storey rear56 decided · more info asked 21%
98% · council 96%
Two-storey side11 decided · more info asked 27%
100% · council 98%
Single-storey side12 decided · more info asked 8%
100% · council 99%
Attic or dormer116 decided · more info asked 7%
91% · council 96%
First-floor25 decided · more info asked 12%
92% · council 94%
New house in a garden or site38 decided · more info asked 50%
66% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 337 nearby, 5,399 council-wide

Figure 3

Quarry Road, file by file since 2021

3 of 3 decided extensions on the road were approved.

7 planning files on Quarry Road since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 96A · 2021 · first-floor · approved · WEB1760/21No. 179C · 2022 · attic conversion / dormer · approved · WEB2057/22No. 37 · 2025 · other extension · approved · WEB1278/25Porches, roofs, otherNo. 2B · 2021 · other work · approved · 3184/21No. 54 · 2023 · other work · refused · 4362/23No. 54 · 2024 · other work · approved · 3852/24No. 54 · 2025 · other work · approved · WEB2381/25New house in a side garden
ApprovedRefusedWithdrawn or invalid

7 files with "Quarry Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 7 is asked for more information, which adds about 64 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 127 days; Appeal window: 4 weeks; If appealed: +164 days; Building starts: 141 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=304)55 daysIf more info asked (1 in 7)With further information: median 127 days (n=51)127 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 164 days (n=70, all appeals within 1.5 km)+164 daysBuilding startsStart notice: median 141 days after permission (n=156)141 days after permissionSigned off292 days after the start, for the few who file. 50% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated355 decided home extensions, 161 start notices, 70 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    8 of 30 appealed refusals became permissions. 1 of 40 appealed approvals were reversed.

    Refusals appealed30 decided
    8 became permissions
    Approvals appealed40 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 4 in the last 12 months

    None of 1 changed the council's decision

    • 324373 Granted with conditions · Former 'Matt?s of Cabra' Public House, 2A Fassaugh Avenue, Dublin 7,… · 439 m
    • 502207 Pending · 44 Inver Road, Cabra, Dublin 7, D07 V2Y5 · 460 m
    • 324494 Pending · 63 Old Cabra Road, Cabra East, Dublin 7, D07 YD99 · 333 m
    • 500817 Granted with conditions · 75, Saint Jarlath Road, Cabra East, Dublin 7 · 490 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Quarry Road with 15 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedDerelict buildingBuilding startedEmpty land zoned for homesApprovedOther
    1. 167, Annamoe Road WEB3580/26No decision yet · 287 m
    2. 226 Offaly Road, Cabra Dublin 7 WEB3576/26No decision yet · 410 m
    3. 352 & 54 Quarry Road WEB2381/25Approved, no sign building has started · 126 m
    4. 4122 Quarry Road, Cabra DS1694Derelict building · 219 m
    5. 512 Everton Avenue Dublin 7 D07RX5V DS1650Derelict building · 475 m
    6. 6180 O'Devaney Gardens, Dublin ABP-310327-21Building started · 70 m
    7. 70.1 ha zoned for homesEmpty land zoned for homes · 459 m
    8. 8Glenart, 170 Cabra Road WEB1428/26Approved · 156 m
    9. 964, Annamoe Road WEB1044/26Approved · 255 m
    10. 1081, Carnlough Road WEB6044/25Approved · 279 m
    11. 11Bus Stop 1804, Cabra Road WEB2862/26Other decision · 361 m
    12. 12Saint Jude, 47 Drumcliffe Road WEB1804/26Approved · 458 m
    13. 13105 Cabra Road, Dublin 7 WEB1694/26Approved · 469 m
    14. 14Park House, Grangegorman WEB2192/26Approved · 486 m
    15. 1570, Dingle Road WEB1930/26Approved · 488 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 97 permissions since 2016, 46 show a start notice and 3 have a completion certificate. Most owners opt out of sign-off.

    119 applications lodged within 500 m. Council: 98 approved, 6 refused. After appeals: 97 approved. Of those: 3 signed off, 24 built with the owner's opt-out, 19 started, 51 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT98: lodged → approved6: lodged → refused12: lodged → withdrawn or invalid3: lodged → undecided97: approved → approved6: refused → refused12: withdrawn or invalid → withdrawn3: undecided → undecided1 approved by the council, withdrawn or invalid after an appeal51: approved → no start notice found24: approved → built, owner opted out19: approved → started, not signed off3: approved → signed off119 lodged119 lodged98 approved98 approved6 refused6 refused12 withdrawn or invalid12 withdrawn or invalid3 undecided3 undecided97 approved97 approved6 refused6 refused13 withdrawn13 withdrawn3 undecided3 undecided51 no start notice found51 no start notice found24 built, owner opted out24 built, owner opted out19 started, not signed off19 started, not signed off3 signed off3 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured119 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    3 deadlines within 500 m; the first closes 24 Nov 2026.

    3 deadlines in the next 30 days: 2026-11-24 WEB3576/26: application received — RETENTION: Retention of a small frosted window serving an en-suite bathroom; 2026-11-24 WEB3580/26: application received — Existing single story flat roof structure to side demolished and replaced with an upgraded and slightly larger single st; 2026-12-01 ACP 324373: Grant permission with revised conditionstoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecWEB3576/26: application received — RETENTION: Retention of a small frosted window serving an en-suite bathroom · 410 m away · 2026-11-24WEB3580/26: application received — Existing single story flat roof structure to side demolished and replaced with an upgraded and slightly larger single st · 287 m away · 2026-11-24ACP 324373: Grant permission with revised conditions · 439 m away · 2026-12-01
    Comments closeHigh Court window ends
    • Comments close 24 Nov 202623 days left
      2WEB3576/26 · application received — RETENTION: Retention of a small frosted window serving an en-suite bathroom
      €20 to the council · 410 m away
    • Comments close 24 Nov 202623 days left
      1WEB3580/26 · application received — Existing single story flat roof structure to side demolished and replaced with an upgraded and…
      €20 to the council · 287 m away
    • Time to ask the High Court for a review ends 1 Dec 202630 days left
      Grant permission with revised conditions
      439 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    21 homes 126 m away were approved Sept 2025 with no start notice yet; the permission runs to Sept 2030. DART+ South West is planned 44 m away.

    52 & 54 Quarry Road · 21 homes: 21 homes approved Sep 2025, not started; DART+ South West, DART+ South…: railway order granted (13 November 2024); DART+ West, DART+ West:…: railway order granted (July 2024)2024202520262027202820292030203152 & 54 Quarry Road · 21 homes126 m · WEB2381/2521 homes approved Sep 2025, not started21 homes approved Sep 2025, not startedDART+ South West, DART+ South…44 m · plannedrailway order granted (13 November 2024)DART+ West, DART+ West:…927 m · plannedrailway order granted (July 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 4 within 500 m

    Derelict building 2

    • 4122 Quarry Road, Cabra · derelict since May 2026 · 219 m
    • 512 Everton Avenue Dublin 7 D07RX5V · derelict since Feb 2026 · 475 m

    Approved, not started 1

    Empty land zoned for homes 1

    • 70.1 ha zoned for homes · no homes built on it yet · 459 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 15 and 24 a year; busiest 2023. 94% of decisions were approvals.

    2021: 21, 2022: 15, 2023: 24, 2024: 22, 2025: 23, 2026: 1401020302021: 19 approved2021: 1 refused2021: 1 undecided21’21*2022: 15 approved15’222023: 20 approved2023: 2 refused2023: 2 withdrawn or invalid24’232024: 19 approved2024: 2 refused2024: 1 withdrawn or invalid22’242025: 18 approved2025: 1 refused2025: 4 withdrawn or invalid23’252026: 7 approved2026: 5 withdrawn or invalid2026: 2 undecided14’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 17 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 10 in the last 12 months
    1 signed off as finished9 no sign-off needed
    • 6180 O'Devaney Gardens, Dublin, Dublin 7 · 2 Jul 2026 · start notice signed off · ABP-310327-21 · 70 m
    • 31 Erris Road, Dublin 7, D07 DX25 · 29 Jun 2026 · start notice, opted out no sign-off needed · WEB1482/25 · 223 m
    • 33 Leix Road, cabra, Dublin 7, D07 HE02 · 20 May 2026 · start notice, opted out no sign-off needed · WEB2973/25 · 346 m
    • 86 Glenbeigh Road, Dublin 7, D07 X3K7 · 12 May 2026 · start notice, opted out no sign-off needed · WEB1720/24 · 391 m
    • 72 Cabra Road, Knockatee, Dublin 7, D07 A2T9 · 8 Apr 2026 · start notice, opted out no sign-off needed · 3333/25 · 491 m
    • 175 Carnlough Road, Dublin 7, D07 W86K · 27 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · WEB1809/25 · 432 m
    • 83 Glenbeigh Road, Dublin, Dublin 7, D07 F1W1 · 23 Feb 2026 · start notice, opted out no sign-off needed · WEB2439/25 · 444 m
    • 42 Offaly Road, Cabra, Dublin 7, D07 Y478 · 21 Jan 2026 · start notice, opted out no sign-off needed · 1872/25 · 374 m
    • 28 Cabra Drive, Dublin, Dublin 7, D07 AV67 · 28 Nov 2025 · short notice no sign-off needed · WEB1191/23 · 317 m
    • 4 Doon Avenue, Dublin, Dublin 7, D07 F9V9 · 17 Nov 2025 · short notice no sign-off needed · 4408/24 · 410 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 21 not started
    • 75 Old Cabra Road, Dublin 7 (Phase 1) · Completed · 6 homes · 379 m
    • Bannow Road, Cabra, Dublin 7 (Phase 1) · Stage 4 tender approval · 144 homes · 379 m
    • Blackbird Park, Rathoath Road, Cabra, Dublin 7 (Phase 1) · On site · 95 homes · 379 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    52 & 54 Quarry Road2929 not started (2026-Q2)89 m
    Blackhorse Avenue Industrial Estate6868 built (2025-Q4)533 m
    76, 76G & 280 Bannow Road69—561 m
    Park Shopping Centre and Prussia Street3232 not started (2026-Q2)638 m
    Marlborough Road Development3131 being built (2026-Q2)754 m
    DCC 2840/192020 built (2025-Q1)764 m
    St. Finbar's Court4646 built (2025-Q4)771 m
    29 New Cabra Road6—797 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Happy Days · Crèche22 Jan 2025 · report · Tusla Early Years Inspectorate65 m
    Safari Childcare · Crèche24 Jul 2025 · report · Tusla Early Years Inspectorate239 m
    Jumblies · Crèche26 Jan 2026 · report · Tusla Early Years Inspectorate455 m
    Butterfly Garden Preschool · Crèche20 May 2026 · report · Tusla Early Years Inspectorate460 m
    Little Stars Childcare & Montessori · Crèche27 Apr 2026 · report · Tusla Early Years Inspectorate460 m
    Doreen's Preschool Montessori · Crèche10 Mar 2026 · report · Tusla Early Years Inspectorate460 m
    Abbey Tots · Crèche28 Jul 2025 · report · Tusla Early Years Inspectorate460 m
    Tracey’s Tots Preschool · Crèche1 Oct 2024 · report · Tusla Early Years Inspectorate528 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here77
    Council middle52
    Homes started
    Here1,512
    Council middle109
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    40% owner-occupied (council 47%).

    Homes built before 1971
    48% · council 52%
    Homes built since 2001
    45% · council 19%
    Owner-occupied
    40% · council 47%
    Rented
    56% · council 45%
    Children under 15
    18% · council 15%
    Aged 65 and over
    12% · council 13%
    Households with 2+ cars
    16% · council 19%
    Work mainly from home
    6% · council 12%
    This small area (361 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268031015

    Bus
    103 m
    Carnlough Rd South · 122 · busiest stop within 500 m: 15 an hour at peak
    Planned
    44 m
    DART+ South West, DART+ South West: Hazelhatch and Celbridge - Drumcondra
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    365 m
    Gaelscoil Bharra, 212 pupils
    Homes sold nearby
    66
    in 3 years, 10 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Gaelscoil Bharra · primary · 212 pupils · 365 m
    • Christ The King I G · primary · 37 pupils · 437 m
    • Christ The King Girls Senior School · primary · 74 pupils · 437 m
    • Christ The King B NS · primary · 86 pupils · 471 m
    • Cabra Community College · postprimary · 264 pupils · 771 m
    • Coláiste Mhuire · postprimary · 272 pupils · 837 m
    • Fionnbarra Naofa B.N.S. · primary · 126 pupils · 879 m
    • St Gabriels NS · primary · 168 pupils · 910 m

    Stops 77

    • Carnlough Rd South · 122 · 5/hour at peak · 103 m
    • Carnlough Rd South · 122 · 4/hour at peak · 114 m
    • Cabra Road · 38, 38A, 38B, 38D · 5/hour at peak · 152 m
    • Quarry Road · 122, 38, 38A, 38B, 38D · 10/hour at peak · 168 m
    • Quarry Road · 122, 38, 38A, 38B, 38D, 70n · 9/hour at peak · 182 m
    • Cabra Road · 38, 38A, 38B, 38D, 70n · 5/hour at peak · 197 m
    • Drumcliffe Rd · 122 · 5/hour at peak · 235 m
    • Glenbeigh Road · 39, 39A, 70 · 15/hour at peak · 269 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Gaelscoil Bharra · 365 m-0.9% pupils (212)
    • Christ The King Girls Senior School · 437 m-3.9% pupils (74)
    • Christ The King I G · 437 m-7.5% pupils (37)
    • Christ The King B NS · 471 m-14.9% pupils (86)
    • Cabra Community College · 771 m+1.5% pupils (264)
    • Coláiste Mhuire · 837 m+6.2% pupils (272)

    Open consultations

    Council meetings 30 items

    Public land

    • Technological University Dublin · 0.84 ha · 487 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. 21 homes approved 126 m away (52 & 54 Quarry Road), not started: what is planned?
      Ask for: The planning file for WEB2381/25.
      Council
    2. Application 287 m away open for comments until 24 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Building work started 70 m away: for how long?
      Ask for: The planning conditions for ABP-310327-21.
      Agent · council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Cabra East B
    Electoral area
    Cabra-Glasnevin
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 4 sites nearby could change: 2 derelict, 1 approved scheme, 1 empty zoned plot.
    • 2 applications open for comments nearby; nearest closes 24 Nov 2026.
    • 21 homes approved nearby, not started; largest 21 at 52 & 54 Quarry Road.
    • Old Cabra Road (bus 39, 39A) 362 m away: 15 an hour at morning peak; 145 from all stops within 500 m. Planned: DART+ South West 44 m away, railway order granted (13 November 2024).
    • Here (2022 census): 56% rent (council 45%); 4% of homes empty (council 8%); most built 2001–2010; 39% drive to work (council 28%).
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    • Homes started within 1 km: 388 in the last year, 34 three years before.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 15:31 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.