PlanningRegister.ie
Planning report · Kildare County Council · 500 m around the house · the last 12 months · 29 Oct 2026, 10:34

Maynooth ED, The Municipal District of Clane — Maynooth, County Kildare, Leinster, Éire / Ireland

53.36367, -6.55486

Homes here mostly date from the 2000s. 1 planning file on this house, the latest from 2021. Home extensions nearby almost always get approved (94%). 1 application nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 1 planning file on this house, the latest from 2021.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BarrogstownBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 211122 · attic or dormer, withdrawn or invalid2022: 1 file on Barrogstown2025: 1 file on Barrogstown2026: 1 file on Barrogstown3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    211122 · attic or dormer · withdrawn
    approved?started?signed off?
On this site
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares2
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

A new house in a garden is harder: 38% approved.

New house in a garden or site8 decided · more info asked 0%
38% · council 57%
Approved nearbyKildare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 8 nearby, 1,067 council-wide

Figure 3

Barrogstown, file by file since 2022

3 planning files on Barrogstown since 2022, by kind and decision.20222023202420252026Extensions, atticsPorches, roofs, otherNo number · 2022 · other work · approved · 221000No number · 2025 · attic conversion / dormer · approved · 2560140No number · 2026 · other work · approved · 2660481New house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Barrogstown" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; Appeal window: 4 weeks; Building starts: 95 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 48–54 (n=24)52 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 95 days after permission (n=15)95 days after permissionSigned off69% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated31 decided home extensions, 16 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 1 appealed refusals became permissions. 0 of 4 appealed approvals were reversed.

    Refusals appealed1 decided
    1 became permissions
    Approvals appealed4 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Maynooth ED, The Municipal District of Clane — Maynooth, County Kildare, Leinster, Éire / Ireland with 3 numbered planning items
    ⌖ the houseOpen for commentsNo decision yetApproved
    1. 1BARROGSTOWN, MAYNOOTH 2661068No decision yet · 486 m
    2. 2Ballygoran Celbridge Road, Maynooth 2660690No decision yet · 144 m
    3. 3Celbridge Community School, Maynooth Road 2660138Approved with conditions · 480 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 10 permissions since 2016, 3 show a start notice and 0 have a completion certificate.

    10 applications lodged within 500 m. Council: 10 approved, 0 refused. After appeals: 10 approved. Of those: 0 signed off, 0 built with the owner's opt-out, 3 started, 6 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT10: lodged → approved10: approved → approved6: approved → no start notice found3: approved → started, not signed off1: approved → ran out10 lodged10 lodged10 approved10 approved10 approved10 approved6 no start notice found6 no start notice found3 started, not signed off3 started, not signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured10 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    1 deadline within 500 m; the first closes 2 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-02 2661068: application received — PERMISSION FOR THE SUB-DIVISION OF EXISTING SITE TO ALLOW FOR THE CONSTRUCTION OF A DETACHED DORMER STYLE HOUSE WITH SINtoday3 Nov8 Nov13 Nov18 Nov23 Nov28 Nov2661068: application received — PERMISSION FOR THE SUB-DIVISION OF EXISTING SITE TO ALLOW FOR THE CONSTRUCTION OF A DETACHED DORMER STYLE HOUSE WITH SIN · 486 m away · 2026-11-02
    Comments close
    • Comments close 2 Nov 20264 days left
      12661068 · application received — PERMISSION FOR THE SUB-DIVISION OF EXISTING SITE TO ALLOW FOR THE CONSTRUCTION OF A DETACHED…
      €20 to the council · 486 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Applications within 500 m, by year

    Between 1 and 3 a year; busiest 2025. 100% of decisions were approvals.

    2021: 1, 2022: 2, 2023: 1, 2024: 2, 2025: 3, 2026: 105102021: 1 approved1’21*2022: 2 approved2’222023: 1 approved1’232024: 2 approved2’242025: 3 approved3’252026: 1 approved1’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 1BARROGSTOWN , MAYNOOTH , CO. KILDARE comments close 2 Nov 2026
      PERMISSION FOR THE SUB-DIVISION OF EXISTING SITE TO ALLOW FOR THE CONSTRUCTION OF A DETACHED DORMER STYLE…
      266106828 Sept 2026486 m
    Every application within 500 m 3 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    Building work nearby 1 in the last 12 months
    1 not signed off
    • R405, Celbridge, Kildare · 10 Nov 2025 · start notice not signed off · 22/627 · 183 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 29 Oct 2026, 02:33
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Cookies' Early Learning Centre Ltd · Crèche14 Jan 2026 · report · Tusla Early Years Inspectorateapprox. 930 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Kildare County Council.
    Homes approved
    Here76
    Council middle0
    Homes started
    Here176
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.029 Oct 2026, 02:33open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    28% of homes built before 1971 (council 16%). 73% owner-occupied (council 71%).

    Homes built before 1971
    28% · council 16%
    Homes built since 2001
    34% · council 40%
    Owner-occupied
    73% · council 71%
    Rented
    9% · council 24%
    Children under 15
    22% · council 22%
    Aged 65 and over
    16% · council 12%
    Households with 2+ cars
    61% · council 51%
    Work mainly from home
    18% · council 12%
    This small area (246 people)Kildare

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 087066036

    Road noise
    75+ dB
    day–night average (EPA 2022)
    Bus
    209 m
    M4 Interchange Park · C4, C6, W6 · busiest stop within 500 m: 5 an hour at peak
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Nearest school
    610 m
    Celbridge Community School, 712 pupils
    Schools, stops and the council

    Schools

    • Celbridge Community School · postprimary · 712 pupils · 610 m
    • Salesian College · postprimary · 880 pupils · 658 m

    Stops 8

    • M4 Interchange Park · C4, C6, W6 · 5/hour at peak · 209 m
    • M4 Interchange Park · C4, C6, W6 · 4/hour at peak · 214 m
    • Salesian College · C4, C6, DY02, W6, X27, X28 · 4/hour at peak · 553 m
    • Salesian College · C4, C6, DY02, W6, X27, X28 · 7/hour at peak · 573 m
    • M4 Business Park · L59 · 2/hour at peak · 770 m
    • M4 Business Park · L59 · 2/hour at peak · 779 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Celbridge Community School · 610 m-0.3% pupils (712)
    • Salesian College · 658 m+4.5% pupils (880)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 29 Oct 2026, 05:07
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.029 Oct 2026, 05:07open
    Council consultation portalsPublic29 Oct 2026, 01:01open
    Council meetings (ModernGov)Public29 Oct 2026, 02:14open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    2. Application 486 m away open for comments until 2 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Mapped at 75+ dB from road traffic: will you hear it inside?
      Ask for: A visit at rush hour (and at night), and the windows' glazing specification.
      Visit at rush hour
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Barrogstown
    Electoral division
    Maynooth
    Electoral area
    Maynooth
    Council
    Kildare County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 211122, withdrawn.
    • Not protected; no vacant land tax; high radon area.
    • Nothing nearby looks set to change.
    • 1 application open for comments nearby; nearest closes 2 Nov 2026.
    • M4 Interchange Park (bus C4, C6) 209 m away: 5 an hour at morning peak; 9 from all stops within 500 m.
    • Noise from road traffic mapped at 75+ dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 72% owner-occupied (council 71%); 6% of homes empty (council 5%); most built 2001–2010; 54% drive to work (council 61%); population up 17% since 2016.
    • Around here the council decides in a median 55 days (about 8 weeks); 40% are asked for more information.
    What the terms mean 6 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 25
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.029 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public29 Oct 2026
    www2.courts.ie—© the publisher28 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public29 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.029 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence29 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 29 Oct 2026, 10:34 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.