RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.
R2 — Existing residentialthe fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029
RS - Residential: Provide for residential development and protect and improve residential amenity
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
An OPW flood extent intersects this area. The OPW's map is licensed CC-BY-NC-ND, so we show a flag only — see the extent at floodinfo.ie.
Designation
Count
Examples
Natural Heritage Area (incl. proposed)
1
Liffey Valley
NIAH-recorded building
39
Lucan Bridge; Stewart's Crafts; building misc
Radon risk area
5
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels
This site is on an RZLT map — the draft map 2027 and the final map 2026 (6.71 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
The development will consist of the material change of use from office/storage unit to a unit for day services use, to enable the provision of services to people with intellectual disabilities, the removal of the existing mezzanine floor, the removal of 4nr existing windows and infilling to match existing cladding to the front and rear elevations at first floor level, the installation of 3nr new window openings to the rear elevation at ground floor level the infilling of existing structural opening to the front elevation with glazing and spandrel panelling, while retaining the existing internal roller shutter unit, the repositioning and widening of the main entrance door and the installation of a full-height fixed glazed unit to the front elevation, installation of manifestation signage to the front elevation door and glazing, the widening and lowering of the existing rear exit door and all associated site works.
SD26A/0053Wreceived 25 Feb 2026decided 14 Apr 2026462 m away
The development will consist of the material change of use from office/storage to a unit for day services use, to enable the provision of services to people with intellectual disabilities. The removal of the existing mezzanine floor and the removal of the existing roller shutter unit and installation of new windows to the front and rear elevation, (d) the widening of the existing doors to the front and rear elevation. Removal and infilling of existing windows at high level to the front and rear elevation with the installation of manifestation signage to the front window and (g) all associated site works.
SD26A/0029Wreceived 6 Feb 2026decided 1 Apr 2026462 m away
Change of use from furniture shop and window shop/showroom to a multi-functional space to include a place of worship and community centre (with ancillary office space);Minor internal alterations to layouts and alterations to the elevations to facilitate the change of use; The provision of car parking spaces and bicycle spaces and; All associated landscaping and site development works. The subject site includes a Protected Structure (Steward's Crafts - Record No. 020).
SD25A/0065Wreceived 15 Jul 2025decided 11 Aug 2025437 m away
Change of use of the existing light industrial/warehouse unit to a Chartered physiotherapist-led rehabilitation and gym facility. The proposed use will include one-to-one and small group physiotherapy-led rehabilitation and exercise services. No external alterations to the structure are proposed. All services will operate within the existing unit footprint and use existing parking and access arrangements.
SD25A/0152Wreceived 24 Jun 2025decided 18 Aug 2025459 m away
The overall site includes a Protected Structure (Steward's Crafts - Record No. 020), Units 39-40, Hills Industrial Estates, Lower Lucan Road, Co. Dublin. The proposed development will consist of:- Change of use from gym to wholesale outlet and local shop;- Minor alterations to the elevations to facilitate the change of use;- The provision of car parking spaces, bicycle spaces and a loading bay for deliveries and;- All associated site development works.
SD24A/0181Wreceived 29 Nov 2024decided 19 Dec 2024437 m away
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 6 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 12 Sept 2026, 22:20 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.