Planning report · Kildare County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 19:56

The Crescent Westfield, Easton

53.36639, -6.52523

Homes here mostly date from the 2000s. 2 planning files on this house, the latest from 2024. Home extensions nearby almost always get approved (98%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations. 2 planning files on this house, the latest from 2024.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010. 2 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2024: 2460097 · apartments, withdrawn or invalid2024: 2437 · apartments, withdrawn or invalid

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2024
    2460097 · apartments · withdrawn
    approved?started?signed off?
  2. 2024
    2437 · apartments · withdrawn
    approved?started?signed off?
On this site
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail

No zoning in the plans we hold.

Monument zone1 within 100 m Habitation site, Collinstown (Leixlip Ed)
Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Intel Ireland Limited (789 m); Hewlett Packard (Manufacturing) Limited (835 m); licence P1222 (991 m)

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings1Castletown
Radon grid squares1
Monuments5Burnt mound; Habitation site
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 32 on the draft 2027 map; 31 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, Sites and Monuments Record, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 55% approved, and 1 in 4 is asked for more information.

Single-storey rear17 decided · more info asked 6%
100% · council 97%
Attic or dormer39 decided · more info asked 3%
100% · council 89%
New house in a garden or site11 decided · more info asked 27%
55% · council 57%
Approved nearbyKildare overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 67 nearby, 2,348 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 51 days. 1 in 8 is asked for more information, which adds about 70 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 8): 116 days; Appeal window: 4 weeks; Building starts: 107 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 48–54 (n=77)51 daysIf more info asked (1 in 8)With further information: median 116 days (n=12)116 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 107 days after permission (n=36)107 days after permissionSigned off49% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated89 decided home extensions, 37 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    3 of 4 appealed refusals became permissions. 0 of 4 appealed approvals were reversed.

    Refusals appealed4 decided
    3 became permissions
    Approvals appealed4 decided
    0 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around The Crescent Westfield, Easton with 10 numbered planning items
    ⌖ the houseWindow closingEmpty land zoned for homesNo decision yetApproved
    1. 124 Beech Park, Leixlip 2660289Approved with conditions · 311 m
    2. 20.3 ha zoned for homesEmpty land zoned for homes · 26 m
    3. 30.4 ha zoned for homesEmpty land zoned for homes · 64 m
    4. 40.5 ha zoned for homesEmpty land zoned for homes · 68 m
    5. 50.7 ha zoned for homesEmpty land zoned for homes · 138 m
    6. 60.1 ha zoned for homesEmpty land zoned for homes · 163 m
    7. 70.7 ha zoned for homesEmpty land zoned for homes · 169 m
    8. 888 Beech Park, Leixlip 2661020No decision yet · 353 m
    9. 9Harpur Avenue, "Harpur Lane" Leixlip Gate 2660406Approved with conditions · 436 m
    10. 1020 Glen Easton Gardens, Leixlip 2660804Approved with conditions · 481 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 37 permissions since 2016, 13 show a start notice and 5 have a completion certificate.

    41 applications lodged within 500 m. Council: 35 approved, 6 refused. After appeals: 37 approved. Of those: 5 signed off, 4 built with the owner's opt-out, 4 started, 20 with no start notice found, 4 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT35: lodged → approved6: lodged → refused35: approved → approved4: refused → refused2 refused by the council, approved after an appeal20: approved → no start notice found4: approved → built, owner opted out4: approved → started, not signed off5: approved → signed off4: approved → ran out41 lodged41 lodged35 approved35 approved6 refused6 refused37 approved37 approved4 refused4 refused20 no start notice found20 no start notice found4 built, owner opted out4 built, owner opted out4 started, not signed off4 started, not signed off5 signed off5 signed off4 ran out4 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured41 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 4 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-04 2660289: CONDITIONAL — a flat roof garden room to the rear of the property for ancillary home office and storage usetoday5 Nov10 Nov15 Nov20 Nov25 Nov30 Nov2660289: CONDITIONAL — a flat roof garden room to the rear of the property for ancillary home office and storage use · 311 m away · 2026-11-04
    Time to appeal ends
    • Time to appeal ends 4 Nov 20264 days left
      12660289 · CONDITIONAL — a flat roof garden room to the rear of the property for ancillary home office and storage use
      €220 to An Coimisiún Pleanála (€110 observer) · 311 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    DART+ West is planned 507 m away.

    DART+ West, DART+ West:…: railway order granted (July 2024)20242025202620272028DART+ West, DART+ West:…507 m · plannedrailway order granted (July 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 10 within 500 m

    Empty land zoned for homes 10

    • 20.3 ha zoned for homes · no homes built on it yet · 26 m
    • 30.4 ha zoned for homes · no homes built on it yet · 64 m
    • 40.5 ha zoned for homes · no homes built on it yet · 68 m
    • 50.7 ha zoned for homes · no homes built on it yet · 138 m
    • 60.1 ha zoned for homes · no homes built on it yet · 163 m
    • 70.7 ha zoned for homes · no homes built on it yet · 169 m
    • 0.4 ha zoned for homes · no homes built on it yet · 172 m
    • 5.4 ha zoned for homes · no homes built on it yet · 173 m
    • 0.9 ha zoned for homes · no homes built on it yet · 219 m
    • 1.0 ha zoned for homes · no homes built on it yet · 0 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 3 and 8 a year; busiest 2022. 85% of decisions were approvals.

    2021: 11, 2022: 8, 2023: 8, 2024: 8, 2025: 3, 2026: 3051015202021: 7 approved2021: 4 refused11’21*2022: 7 approved2022: 1 refused8’222023: 8 approved8’232024: 7 approved2024: 1 refused8’242025: 3 approved3’252026: 3 approved3’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 9 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 1 in the last 12 months
    1 no sign-off needed
    • Easton Road, Leixlip, Kildare, W23XR6N · 2 Mar 2026 · 1 homes · short notice no sign-off needed · 2460377 · 205 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Westfield · 18 applications in 10 years · 85% approved · most common: attic conversion / dormer

    Crèches and schools inspected

    NameLatest inspectionDistance
    Little Harvard · Crèche11 May 2026 · report · Tusla Early Years Inspectorate191 m
    Little Harvard Childcare Ltd · Crèche28 Oct 2025 · report · Tusla Early Years Inspectorate191 m
    Little Harvard Childcare ltd · Crèche29 Apr 2024 · report · Tusla Early Years Inspectorate191 m
    Little Harvard Childcare Ltd · Crèche3 Mar 2026 · report · Tusla Early Years Inspectorate191 m
    Parkview Creche · Crèche8 Dec 2025 · report · Tusla Early Years Inspectorate440 m
    Little Graduates Preschool · Crèche16 Oct 2024 · report · Tusla Early Years Inspectorate736 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Housing estates, Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 23:19
    SourceLicenceFetchedLink
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Kildare County Council.
    Homes approved
    Here416
    Council middle0
    Homes started
    Here273
    Council middle2
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    2% of homes built before 1971 (council 16%). 54% owner-occupied (council 71%).

    Homes built before 1971
    2% · council 16%
    Homes built since 2001
    95% · council 40%
    Owner-occupied
    54% · council 71%
    Rented
    44% · council 24%
    Children under 15
    21% · council 22%
    Aged 65 and over
    6% · council 12%
    Households with 2+ cars
    29% · council 51%
    Work mainly from home
    12% · council 12%
    This small area (367 people)Kildare

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 087064011

    Road noise
    65–69 dB
    day–night average (EPA 2022)
    Bus
    191 m
    Beechpark Estate · 52, C5, L59 · busiest stop within 500 m: 5 an hour at peak
    Planned
    507 m
    DART+ West, DART+ West: Connolly - Maynooth
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Homes sold nearby
    21
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    None nearby.

      Stops 14

      • Beechpark Estate · 52, C5, L59, X25 · 5/hour at peak · 191 m
      • Beechpark Estate · 52, C5, L59, X25 · 3/hour at peak · 220 m
      • Glen Easton · 52, C5, L59, X25 · 5/hour at peak · 576 m
      • Barnhall Road · 52, C5, L59, X25 · 3/hour at peak · 699 m
      • Lough na Mona · 52, C5, L59, X25 · 5/hour at peak · 743 m
      • Intel Campus 2 · 52 · 1/hour at peak · 773 m
      • Intel Main Entrance · 139, C3, C5, DY02, UM11, X25 · 3/hour at peak · 783 m

      Public land

      • Kildare County Council · 1.38 ha · 14 m
      • Kildare County Council · 1.53 ha · 32 m
      • Kildare County Council · 0.75 ha · 125 m
      • Kildare County Council · 1.02 ha · 235 m
      • Kildare County Council · 2.21 ha · 261 m
      • Kildare County Council · 5.54 ha · 266 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 02:21
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Council consultation portalsPublic31 Oct 2026, 01:06open
      Council meetings (ModernGov)Public31 Oct 2026, 02:21open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. On the vacant land tax map: is the 3% tax being paid?
        Ask for: Your solicitor's check of liability or exemption.
        Solicitor
      2. Mapped at 65–69 dB from road traffic: will you hear it inside?
        Ask for: A visit at rush hour (and at night), and the windows' glazing specification.
        Visit at rush hour
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Collinstown
      Electoral division
      Leixlip
      Electoral area
      Leixlip
      Council
      Kildare County Council
      Everything we found, as a list 8 lines
      • 2 applications on this site; latest 2460097, withdrawn.
      • Not protected; on the vacant land tax map.
      • 10 sites nearby could change: 10 empty zoned plots.
      • Beechpark Estate (bus 52, C5) 191 m away: 5 an hour at morning peak; 8 from all stops within 500 m. Planned: DART+ West 507 m away, railway order granted (July 2024).
      • Noise from road traffic mapped at 65–69 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 54% owner-occupied (council 71%); 2% of homes empty (council 5%); most built 2001–2010; 52% drive to work (council 61%); population up 8% since 2016.
      • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
      • Homes started within 1 km: 4 in the last year, 38 three years before.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 30
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
      www2.courts.ie—© the publisher30 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 31 Oct 2026, 19:56 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.