PlanningRegister.ie
Site report · 500 m radius · 5 Oct 2026, 23:48

14 things worth knowing before you buy

Harbour Road, Kilbeggan

53.36680, -7.49347Westmeath County Council
See on the mapWatch this area
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.

What we found

  • 1 application on this site; latest 176235, approved 2017, ran out unbuilt.
  • Zoned S1 (third-level education); not protected; no vacant land tax.
  • 12 sites nearby could change: 1 stalled build, 2 approved schemes, 9 empty zoned plots.4567
  • 1 application open for comments nearby; nearest closes 19 Oct 2026.1
  • 59 homes approved nearby, not started; largest 46 at Dublin Road R446.2
  • Kilbeggan East (bus 837, 845) 121 m away: 2 an hour at morning peak; 4 from all stops within 500 m.
  • Noise from road traffic mapped at 45–49 dB (day-evening-night average, EPA 2022).
  • Here (2022 census): 65% owner-occupied (council 68%); 5% of homes empty (council 9%); most built 2001–2010; 60% drive to work (council 63%); population up 19% since 2016.
On this site
S1
Zoning · Third-level education
No
Protected or listed · on our maps
No
Vacant land tax · not on the map

Questions to ask before you buy 6 to ask

  1. Porch (176235) ran out unbuilt in 2022: built anyway?
    Ask for: If built: proof it started in time, and an opinion of compliance.
  2. Zoned S1 (third-level education), not for homes: could you extend?
    Ask for: A solicitor's or planner's view.
  3. 46 homes approved 248 m away (Dublin Road R446), not started: what is planned?
    Ask for: The planning file for 2660199.
  4. Application 192 m away open for comments until 19 Oct 2026: comment?
    Ask for: The plans on the council's website (€20 to comment).
  5. Decision 132 m away can be appealed until 19 Oct 2026: appeal?
    Ask for: The decision on the council's website (€220 to appeal).
  6. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.

The street 15 numbered

Street map around Harbour Road, Kilbeggan with 15 numbered planning items
⌖ the siteOpen for commentsWindow closingApproved, not startedEmpty land zoned for homesApprovedNo decision yet
#WhatStatusDistanceWhy it is here
1The Crescent, KIlbeggan
2660491
No decision yet192 mopen for comments until 19 Oct 2026
2Dublin Road R446, Kilbeggan
2660199
Approved with conditions132 mtime to appeal ends 19 Oct 2026
3Tullamore Road Kilbeggan
2460385
Approved, no sign building has started467 m13 homes approved 2025, no sign building has started
41.0 ha zoned for homesEmpty land zoned for homes151 mno homes built on it yet
51.8 ha zoned for homesEmpty land zoned for homes181 mno homes built on it yet
62.5 ha zoned for homesEmpty land zoned for homes187 mno homes built on it yet
72.3 ha zoned for homesEmpty land zoned for homes325 mno homes built on it yet
80.2 ha zoned for homesEmpty land zoned for homes338 mno homes built on it yet
90.2 ha zoned for homesEmpty land zoned for homes348 mno homes built on it yet
10Scoil Chlochair, Dublin Road
2460499
Approved with conditions27 mapproved with conditions, 16 May 2025
11Former Mercy Secondary school Dublin Rd, Killbeggan
2660291
No decision yet97 mno decision yet, received 2 Jun 2026
12Pine Villa Tullamore Road, Kilbeggan
2360445
Approved with conditions146 mapproved with conditions, 15 Apr 2024
13Kilbeggan Td, Tullamore Road
21624
Approved with conditions187 mapproved with conditions, 28 Jan 2022
14No. 3 St James Terrace Tullamore Rd., Kilbeggan
2560410
Approved with conditions230 mapproved with conditions, 13 Nov 2025
154 Saint James Terrace, Kilbeggan
2360042
Approved with conditions232 mapproved with conditions, 12 Jun 2023

This property's history 1 on this site

  1. 2017
    176235 · porch · approved 2017 · ran out unbuilt
    approvedstartedsigned off
  • 30 Apr 2018 · building work with no planning file · signed off as finished feb 2019
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 5 Oct 2026, 04:11
SourceLicenceFetchedLink
bcmsCC-BY-4.05 Oct 2026, 04:11open
npadCC-BY-4.05 Oct 2026, 01:13open

The site zoning, protection, tax, flood

ZoningS1 · Third-level education
What it says

Community, Educational & Institutional: Protect, provide and improve community, civic and educational facilities and to preserve the open character of institutional lands and the setting of heritage buildings contained within such lands.

Reserved for third-level education institutions.

wcc cdp 2021 2027 kilbeggan · 3 May 2021 – 2 May 2027

Protected building2 within 100 m on the council's record (not republished); on the council's record (not republished)

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNo none within 500 m
Within 500 mCountFor example
Heritage inventory buildings40Kelly; house
Monuments6R143853; R143875
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 13 on the draft 2027 map; 13 on the final 2026 map.
Sources: zoning, constraints.niah, rps.westmeath, rzlt, constraints, constraints.smr · fetched 4 Oct 2026, 23:11
SourceLicenceFetchedLink
zoningCC-BY-4.04 Oct 2026, 23:11open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
rps.westmeathunstated (council's public ArcGIS service; no licence published) · not redistributable — shown as a flag only—open
rzltCC-BY-4.04 Oct 2026, 23:59open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open

Sites that could change 12 within 500 m

the site250 m500 m456789

Building site that stopped 1

Approved, not started 2

Empty land zoned for homes 9

  • 41.0 ha zoned for homes · no homes built on it yet · 151 m source
  • 51.8 ha zoned for homes · no homes built on it yet · 181 m source
  • 62.5 ha zoned for homes · no homes built on it yet · 187 m source
  • 72.3 ha zoned for homes · no homes built on it yet · 325 m source
  • 80.2 ha zoned for homes · no homes built on it yet · 338 m source
  • 90.2 ha zoned for homes · no homes built on it yet · 348 m source
  • 0.4 ha zoned for homes · no homes built on it yet · 366 m source
  • 0.3 ha zoned for homes · no homes built on it yet · 429 m source
  • 0.5 ha zoned for homes · no homes built on it yet · 430 m source

Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

How we work this out
Each row is a dated fact from a public register: no score and no forecast. Derelict buildings come from the council's register; stalled builds told the council they were starting 3+ years ago and were never signed off; approved schemes are 10+ homes with no notice that building started; council land sales are notices to councillors; empty zoned land is on the vacant land tax map.
Sources: acp, bcms, derelict, npad · fetched 2 Oct 2026, 23:01
SourceLicenceFetchedLink
acpCC-BY-4.02 Oct 2026, 23:01open
bcmsCC-BY-4.05 Oct 2026, 04:11open
derelictCC-BY-4.05 Oct 2026, 09:35open
npadCC-BY-4.05 Oct 2026, 01:13open

What closes soonest 2 open

  • Comments close 19 Oct 202614 days left
    12660491 · application received — convert existing office area into a family room with reposing station and all associated site…
    €20 to the council · 192 m away
  • Time to appeal ends 19 Oct 202614 days left
    22660199 · CONDITIONAL — development which will consist of the construction of 54 no. dwellings comprising: 6 no. terraced 3 bed 2…
    €220 to An Coimisiún Pleanála (€110 observer) · 132 m away
Sources: acp, consult, moderngov, npad, rzlt · fetched 2 Oct 2026, 23:01
SourceLicenceFetchedLink
acpCC-BY-4.02 Oct 2026, 23:01open
consultpublic5 Oct 2026, 01:11open
moderngovpublic5 Oct 2026, 01:13open
npadCC-BY-4.05 Oct 2026, 01:13open
rzltCC-BY-4.04 Oct 2026, 23:59open

Planning around you 29 in 5 years

18 approved1 refused2 no decision8 withdrawn or other
32021
32022
42023
52024
82025
62026*
Applications within 500 m, by year received. * this year so far; the first year is part of a year.
Last 24 monthsReceivedApprovedMore details askedDays to decideWork already built
Westmeath County Council1,38288%44%6021%

Open for comments €20 to comment

  • 1The Crescent , KIlbeggan , Co.Westmeath comments close 19 Oct 2026
    convert existing office area into a family room with reposing station and all associated site works at…
    266049114 Sept 2026192 m

Every application newest first

Show 18 more
How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: npad, acp, bcms · fetched 5 Oct 2026, 01:13
SourceLicenceFetchedLink
npadCC-BY-4.05 Oct 2026, 01:13open
acpCC-BY-4.02 Oct 2026, 23:01open
bcmsCC-BY-4.05 Oct 2026, 04:11open

Extensions and refusals near you 5 extensions within 250 m

4 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Two-storey rear21—
Other11—
Porch11—
Single-storey side11—

Refused within 100 m 0 in 5 years

Nothing refused this close in 5 years.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 5 Oct 2026, 01:13
    SourceLicenceFetchedLink
    npadCC-BY-4.05 Oct 2026, 01:13open
    acpCC-BY-4.02 Oct 2026, 23:01open

    Building work nearby 6 in 3 years

    1 signed off as finished5 not signed off
    • Abbeybrook Garden, Kilbeggan, Westmeath · 20 Feb 2026 · start notice not signed off · 2460346 · 405 m
    • Abbeybrook, Westmeath · 26 Jan 2026 · 12 homes · start notice not signed off · 24/60346 · 411 m
    • 39 Abbeybrook Garden, Kilbeggan, Westmeath · 12 Aug 2025 · 62 homes · start notice signed off · 24/60346 · 455 m
    • Dublin Road, Kilbeggan, Westmeath, N91 FY53 · 22 Jul 2025 · start notice not signed off · 24/60499 · 70 m
    • 27 Coola Lawns, Kilbeggan, Westmeath · 16 Jul 2025 · 36 homes · start notice not signed off · 25/16 · 368 m
    • THE SQUARE, KILBEGGAN, Westmeath, N91 PY74 · 22 Jul 2024 · start notice not signed off · -02 2023 · 312 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 5 Oct 2026, 04:11
    SourceLicenceFetchedLink
    bcmsCC-BY-4.05 Oct 2026, 04:11open

    Homes coming 59 not started

    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 2 Oct 2026, 23:01
    SourceLicenceFetchedLink
    acpCC-BY-4.02 Oct 2026, 23:01open
    bcmsCC-BY-4.05 Oct 2026, 04:11open
    npadCC-BY-4.05 Oct 2026, 01:13open
    social_housingCC-BY-SA-4.025 Sept 2026, 20:56open

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Kilbeggan Montessori · Crèche22 May 2025 · report · Tusla Early Years Inspectorateapprox. 106 m
    MSR Childcare Services ltd · Crèche20 May 2025 · report · Tusla Early Years Inspectorateapprox. 106 m
    Child's Play ABA Ltd · Crèche16 Feb 2026 · report · Tusla Early Years Inspectorate506 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: schools, tusla_ey · fetched 27 Sept 2026, 23:32
    SourceLicenceFetchedLink
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open

    How busy is this area within 1 km, 3 years

    Busier than most of Westmeath County Council.

    Homes approved
    Here157
    Council middle0
    Homes started
    Here100
    Council middle2
    Homes started within 1 km
    Last 12 months1
    3 years before38
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 2 Oct 2026, 23:01
    SourceLicenceFetchedLink
    acpCC-BY-4.02 Oct 2026, 23:01open
    bcmsCC-BY-4.05 Oct 2026, 04:11open
    npadCC-BY-4.05 Oct 2026, 01:13open

    Appeals 2 in 5 years

    2 refused
    • 316366 Refused · The Crescent, Kilbeggan, Co. Westmeath · 192 m
    • 311890 Refused · M6 Service Station, Tullamore Road, Kilbeggan, Co. Westmeath. · 390 m
    Sources: acp, courts, npad · fetched 2 Oct 2026, 23:01
    SourceLicenceFetchedLink
    acpCC-BY-4.02 Oct 2026, 23:01open
    courtsall-rights-reserved5 Oct 2026, 01:14open
    npadCC-BY-4.05 Oct 2026, 01:13open

    Sales 0 in 3 years

    No recorded sales nearby.

    Source: ppr · fetched 5 Oct 2026, 01:11
    SourceLicenceFetchedLink
    pprPSI — PSRA re-use terms (psr.ie/re-use-of-public-sector-information). Free re-use in any format provided the source and PSRA copyright are acknowledged, the data is reproduced accurately and not used misleadingly, and it is NOT used 'for the principal purpose of advertising or promoting a particular product or service'. Attribution: 'Contains PSRA Residential Property Price Register data, © Property Services Regulatory Authority.'5 Oct 2026, 01:11open

    Schools and transport within 1.0 km

    Schools

    • SCOIL AN CHLOCHAIR CILL BHEAGAN · primary · 226 pupils · 69 m
    • Meán Scoil an Chlochair · postprimary · 740 pupils · 639 m

    Stops 4

    • Kilbeggan East · 837, 845, 847, UM02 · 94 m
    • Kilbeggan East · 837, 845, UM02 · 121 m
    • Kilbeggan · 70, 763, MB01 · 326 m
    • Kilbeggan · 70, 763, MB01 · 346 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Scoil An Chlochair Cill Bheagan · 69 m-0.4% pupils (226)
    • Meán Scoil an Chlochair · 639 m+2.8% pupils (740)
    Sources: gtfs, schools, npad · fetched 4 Oct 2026, 23:41
    SourceLicenceFetchedLink
    gtfsCC-BY-4.04 Oct 2026, 23:41open
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    npadCC-BY-4.05 Oct 2026, 01:13open

    The council consultations, meetings, land

    No open consultation covers this place.

    Sources: consult, moderngov, lda_lands · fetched 5 Oct 2026, 01:11
    SourceLicenceFetchedLink
    consultpublic5 Oct 2026, 01:11open
    moderngovpublic5 Oct 2026, 01:13open
    lda_landsCC-BY-4.011 Sept 2026, 16:43open

    Where this is

    Townland
    Kilbeggan
    Electoral division
    Kilbeggan
    Electoral area
    Moate
    Council
    Westmeath County Council
    311
    people (2022)
    64.7%
    owner-occupied
    27.5%
    rented
    Sources: places, parcels · fetched 5 Oct 2026, 00:43
    SourceLicenceFetchedLink
    placesCC-BY-4.05 Oct 2026, 00:43open
    parcelsCC-BY-4.011 Sept 2026, 19:06open

    What the terms mean 10 terms

    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.

    Sources

    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.02 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.05 Oct 2026
    data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
    dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public5 Oct 2026
    www2.courts.ie—all-rights-reserved5 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
    transportforireland.ieNational Transport AuthorityCC-BY-4.04 Oct 2026
    lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)public5 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.05 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…5 Oct 2026
    services7.arcgis.comLocal authorities (Record of Protected Structures)unstated (council's public ArcGIS serv… · flag only—
    services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.04 Oct 2026
    gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
    gov.ieDepartment of HousingCC-BY-SA-4.025 Sept 2026
    tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.04 Oct 2026
    How we work this out
    Generated 5 Oct 2026, 23:48 from the Planning Register store; nothing was fetched live. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.